- --------- ---_ _ _ _ _-

(

l North Atlantic Energy Service Corporation l

Semi-Annual Fitness-for-Duty Report

)

January 01, 1998 through June 30, 1998 9907210285 900715 PDR ADOCK 05000443' R

PDR

Jcnuary - Junn 1998 North Atlantic Enstgy Service Corporation 1

6 4

North Atlantic Energy Service Corporation Semi-Annual Fitness-for-Duty Report for period ending June 30,1998 Table of Contents EAge I.

Performance Data Sheets (NUMARC format) 1 IL Management Summary 1.

Program Effectiveness 3

2.

Initiatives 4

3.

Reported Events 5

III.

Graphic Analysis 1.

Total Screenings vs. Failures by Test Type 6

2.

Percentage of Failures by Test Type 6

i 3.

Licensee Failures 7

4.

Contractor Failures 7

5.

Total Screenings vs. Failures by Day of Week 8

6.

Reason for Failure by Day of Week 8

7.

Rr. dom Screenings by Hour of Day 9

l 8.

Random Screenings by Day of Week 9

l r

January - Juna 1998 North Atlantic Energy Service Corporation Paga 1 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 NORTII ATLANTIC ENERGY SERVICE CORPORATION JUNE 30, 1998 P. O. BOX 300

~

SEABROOK, NH 03874 Loesa n BRUCE R.

SEYMOUR (603) 773-7012 Contact Psame Phone enouco area comel Cutotts: ScreervConfirmation (ng/ml)

Q Appencix A to 10CFR 26 Marijuana 50 /

15 Amphetamines 1000 / 500

/

Cocaine 300 / 150 Phencyclidine 25 f 25

/

Oplates 300 / 300 Alcohol (% BAC) 0.04

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number witt Unescorted Access 828 2

391 Categories Tested Positive Tested Positive Tested Positive Pre Access 18 234 9

k Post accident O

Eg Observed behavor 3

1 2

1 Random 231 1

102 Follow-up 61 12 Other 2

Total 315 1

1 0

350 10 REv.1/92

C C

m o

o pl n

n o

t t

r r

y a

a e

c c

e t

to o

s r

rs s

7 1

1

/

/

j 0

9 1

1 1

p

'1 1

^

A

Jenusry - Juns 1998 North Atlantic Energy Service Corporation

.Paga 3 PROGRAM EFFECTIVENESS L

l The data compiled during this reporting period is presented in the graphic analysis beginning after the management summary in this repon.

l During the first half of 1998, NAESCO conducted 666 tests. There were eleven failures resulting l

in a positive test rate of 1.65% There were no alcohol failures and one licensee failure. Ten l-failures were for marijuana and one for cocaine. Three of the marijuana failures were detected by a more aggressive approach to testing dilute specimens, which NAESCO initiated in May of 1997.

Also during this reporting period there were two Fitness for Duty (FFD) violations for possession of alcohol in the protected area. Both violations were discovered by the individuals and immediately reponed their supervisors. Sanctions imposed were subsequently waived after a review of the incidents by the NAESCO FFD Appeal Board.

All available evidence indicates that the continued support of NAESCO management and employees has provided the basis for the FFD program's effective implementation and continued l

advancement toward the goal of achieving a workplace free of drugs and alcohol and the effects of such substances.

I f

Jenunty - Juno'1998 North' Atlantic Energy Service Corporation Pega 4 INITIATIVES 1.

. Began working with a newly contracted Medical Review Officer and his assistant in February 1998.

2.

. Archived three years of FFD documentation and prepared an additional two years for future archiving.

l 3.

Broadened ' experience and knowledge base of one screening technician through l

participation in an audit of another nuclear FFD program.

1 h

4.

Gave FFD presentation to a six-member management team detailing use of the voluntary alcohol screening program, calculation of extrapolated BAC's, and increase in detection of drugs through special steps taken in testing of dilute specimens.

l 5.

Reformatted Fitness for Duty procedures.

l 6.-

Revised the North Atlantic Specimen Collection Protocol for Drug and Alcohol l

Screening. The following major changes were made:

included a preliminary step stating that if an employee is unable to complete the collection process due to a personal or work related emergency, FFD personnel shall contact the Security and Safety Manager for guidance i

l redesigned Appendix C (Deduced BAC Level) to provide a precise yet simple formula L

by which to calculate an individual's BAC at the time of arrival at work i

l 7.

Updated three Office Instructions, making the following major changes:

expanded section on MRO reporting of positive drug test results to include times

(.

when the FFD Facility is not open L

added a section for reciprocal testing (when one Northeast Utilities plant conducts a test at the request of another NU plant) and a two-page attachment for implementation purposes i

l clarified manner in which the MRO works with FFD in handling the processing of dilute specimens l

detailed MRO and FFD responses to drug test results which have unusual findings incorporated two attachments to enhance access authorization interface 1

Janunty - Juna 1998 North Atlantic Energy Servica Corporation Paga 5

SUMMARY

LIST OF TELEPHONICALLY REPORTED EVENTS During this period there was one (1) telephonically reponed event under the reponing requirements of10 CFR Part 26.

]

Date ofReport:

11 February 1998 Position ofIndividual:

Supervisor How Discovered:

For Cause Test Substance:

Marijuana L

i I

I

January - June 1998 North Atlantic Energy Service Corporation Page 6 l

l Total Screenings vs. Failures by Test Type Random 334 o

Pro.11adgmg 234 5'

3% Employment 18 0

l Follow.ly

}

73.

O For Cause 5

2 t

1 Other 2

0

/

.L...

400 300 200 100 0

5 10 15 20 mTotalScreenings asFailures i

tow Screenings: 666 Total Faumres: 11 Percentage of Failures by Test Type l

I en 7DIb g -

504 -- -- - - - - - - - - - - - - - - -

40%

40%

m - - _ _..

.. - ~

EUlb

,gs 3.85 %

a Flandom PreBw4pg Pr*Em FoaanMap For Cause Other I

i I

L

January - June 1998 Worth Atlantic Energy Service Corporation Page 7 Licensee Failures 5

4 4

i g...... -

f 2r 1

1 t- - - -

- - - ~

l 0

Ran&m Pre-Badgng PreEmploymert Fokmw For Cause O ber M Alcohol (0)

M Marijuana (l)

MCocaine (0) tWOpiates (0)

Mitencyclidine (0) M Amphetamines (0) CI Admmistrauve (0)

I i

f 1

i l

l Contractor Failures 10 9

. - -. - -.. ~

.7, l

. i..

g l

i 7

6 5

4 3

l l

2 i

I

'a ob Random PreBadpg PrerEmpicyment Fokwup For Cause Other M Alcohol (0)

MMarijuana (9)

MCocaine (I)

ED> Opiates (0)

MPhencyclidine (0) M Amphetamines (0) C Administrative (0) t

January - June 1998 North Atlantic Energy Service Corporation Page 8 Total Scavenings vs. Failures by Day of Week Monday '264 ~

a Tuesday 1.11 I

}

i i

r Wednesday 9

1 l

i Thursday 94 0

t

'l Friday 31 1

Saturday 2

0 Suhy I

O

..2.

300 250 200 150 100 50 0

2 4

6 s

to uTotalScreenings mFailurcs Reason for Faikur by Day of Week 9

s 1

6 5

2.

4 t

3 2

o Monday Tuesday Wednesday nursday Friday Saturday Sunday Day of Week m Alcohol (0) mMarijuana (10) me Cocaine (l) tcOpiates (0) m Phencyclidine (0) m Amphetamines (0) ; 1 Administrative (0)

~

January - June 1998 North Atlantic Energy Service Corporation Page 9

+

Random Screenings by Hour of Day

.. 44 47..

.46 38 39 I_ly-.

~

' ~

" ~..

2 2 2 2 2

I I I I I i 1 1 7:00 11:00 15:00 19:00 23:00 320 Total Randium Screening::334 Random Screenings by Day of Week 100 g- -

+-

y 90 80 78 63 60 43 40 30

^'

20 10

~

^

m.o.,

T.o.y wa..

y n.,.a.y ua.,

s.,47 so.a.y Tahd Rendum Screenhos:334 1