Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
' =. j I
[fl ,
" g~
North Atlantic Energy Service Corg oration
. North .
i' a m >= 3
, 4 $yn 1RIlklO (603) 474-9521 ,
The Northeast Utilitien System i
November 13,1998 l Docket No. 50-443 NYN-98134 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station Monthly Operatina Report Enclosed please find Monthly Operating Report 98-10. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of October,1998 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
I Should you require further information regarding this matter, please contact l Mr. Terry L, Ilarpster, Director of Licensing Services, at (603) 773-7765. J Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
d)sAA; W. A.'DIPrFio '/
Station Director !
CC: l II. J. Miller, NRC Region 1 Administrator J. T. Harrison, NRC Project Manager, Project Directorate 1-3 ,
I
. R. K. Lorson, NRC Senior Resident Inspector s f l
- [*d t / i
.s. ~
9811170275 981031 PDR ADOCK 05000443 R PM .
OPERATING DATA REPORT a .a *
- q DOCKET NO. 50-443 UNIT Seabrook 1 DATE November 1,1998 COMPLETED BY P.E. Nardone TELEPilONE (603) 773-7074 OPERATING STATUS
- 1. Unit Name: Seabrook Station Unit 1
- 2. Reporting Period: OCTOBER 1998
- 3. Licensed Thermal Power (Mwt): 3411
- 4. Nameplate Rating (Gross MWe): 1242
- 5. Design Electrical Rating (Net MWe): 1148
- 6. Maximum Dependable Capacity (Gross MWe): 12M
- 7. Maximum Dependabk Capacity (Net MWe): 1158
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Not Applicable Report Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe): None 1
- 10. Reasons For Restrictions,if Any: Not Applicable This Month Yr-to-Date Cumulative
- 11. Ilours in Reporting Period 745.0 7296 0 105553.0
- 12. Number of flours Reactor Was Crincal 745.0 6243.1 62906.6 I
- 13. Reactor Reserve Shutdown 11ours 0.0 0.0 953.3
- 14. Hours Generator On-Line 745.0 6182.2 60413.6
- 15. Unit Reserye Shutdown flours 0.0 0.0 0.0
- 16. Gmss Thermal Energy Generated (MWH) 2539971 20990053 200448136
- 17. Gross Elec. Energy Generated (MW11) 897417 7410M4 70051553 l
- 18. Net Electrical Energy Generated (MWil) 864009 7132277 67329930
- 19. Unit Service Factor 100.0 84.7 82.1 l
- 20. Unit Availabihty Factor 100.0 84.7 82.1
- 21. Unit Capacity Factor (Using MDC Net) 100.2 84.4 80.0 l
- 22. Unit Capacity Factor (Using DER Net) 101.0 85.2 80.3
- 23. Unit Forced Outage Rate 0.0 15.3 6.9 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Refueling. 03/27/99, 45 days and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Not Applicable Startup:
r
- NOTE: " Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operation began.
Increased MDC values (Items 6 & 7) starting 12/01/95.
Updated Item 4 per NUREG-0020 in July 1998.
1 of 4 t
a
- . AVERAGE DAILY UNIT POWER LEVEL DOCKLTNO. 50 4 1
, UNIT Seabo 4 i DATE November I,1998 COMPLETED BY P.E. Nardone TELEPilONE (603) 773-7074 MONTil OCTOBER, 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1161 17 1160 2 1161 18 1160 3 1161 19 1160 4 1161 20 1160 5 1161 21 1160 6 1161 22 1160 7 1161 23 1160 8 1161 24 1160 9 1160 25 1160 10 1160 26 1160 11 1160 27 1160 12 1160 28 1160 13 1160 29 . 1160 14 1160 30 1147 15 1160 31 1160 16 1159 -
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole inegawatt.
l 2 of 4
n UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-443 UNIT Seabrook I #
DATE November 1.1998 COMPLETED BY P.E. Nardone TELEPIIONE (603) 773-7074 MONT11 OCTOBER 1998 NO. DATE TYPE I DURATION REASON 2
METIIOD OF SIIVITING LICENSEE EVENT CAUSE & CORRECTIVE ACTION TO PREVEST (IIOURS) DOWN REACTOR
- REFORT # RECLRRENCE Page1ofI 0 A/F E **' ' " ' "'I
984)5 10/30/98 F 5 N/A Isop 3 Reactor Protection Temperature channel.
Operations procedures required a 4% RTP power reduction with Loops I,3 or 4 temperamre channels in a tripped condition. This action provides mrgin egainst an inad. ertent OPDT reactor trip due to the Upper Plenum Flow Anomaly.1he Plant renstned to full power operation that same day.
I 2 3 F: Forced Reason: Method:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Autonutic Scram D - Regulatory Restriction 4 - Contmued from previous nmnth E - Operator Trairung & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
II - Other (Explain) 3 of 4
_,,... REFUELING INFORMATION REQUEST
- . , c DOCKET NO. 50-443 UNIT Seabrmik1 DATE November 1.1998 COMPLETED BY P.E. Nardone TELEPilONE (603) 773 7074
- l. Name of Facility: Seabrook Unit 1 l 2. Scheduled date for next refueling shutdown: Refueling Outage 6, 03/27/99 I
L 3. Scheduled date for restart following refueling: Refueling Outage 6, 05/10/99 [ 45 days J l
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A
- 5. Schedule date(s) for submitting licensing action and supporting information:
l N/A
]
- j. 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in th s are (b) in the spent fuel storage pool and (c) in the new fuel storage vault (a) 193 (b) 376 (c) O t
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
l' l Present licensed capacity: 1236 l No increase in storage capacity requested or planned.
9 ' The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
l.
l Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full
- core offload capability.
The current licensed capacity is adequate until at least the year 2010.
4 of 4
.-. .,_ ,. . . . . - , .. . . - - - - . - . . - -. .