Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
..
l '
"%., North Atlantic Energy Senice Corporation gg}g l'.O. Ilox 300 3
i
. Atlantic . Sealerook. Nil 03874 (60334749321 The Northeast Utilities Sptem October 14,1999 Docket No. 50-443 NYN-99095 l
' United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 i
Seabrook Station I September 1999 Monthly Operating Report Enclosed please find Monthly Operating Report 99-09. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of September,1999 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. James M.
Peschel, Regulatory Compliance Manager, at (603) 773-7194.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
bhiJAL W. A.T5iFrolio ~f Station Director
. cc:
- 11. J. Miller, NRC Region I Administrator J. T. Harrison, NRC Project Manager, Project Directorate 1-2 f l R. K. Lorson, NRC Senior Resident Inspector /
$ ,1 9910220092 990930 PDR ADOCK 05000443 -
E PDR
]
OPERATING DATA REPORT
. ., e*
- DOCKETNO. 50443 UNIT Seabrook i DATE October 1,1999 i ,
COMPLETED BY P.E. Nardone j TELEPl:ONE (603) 773-7074 I
OPERATING STATUS
- 1. Unit Name: Seabrook Station Unit 1
- 2. Reporting Period: SEFFEMBER 1999
- 3. Licensed Thermal Power (MWt): 3411.0
- 4. Nameplate Rating (Gross MWe): 1242.0
- 5. Design Elect.ical Rating (Net MWe): 1148.0
- 6. Maximum Dependable Capacity (Gross MWe): 1248.0
' 7. Maximum Dependable Capacity (Net MWe): 1155.3
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Not Applicable Report, Give F.easons:
- 9. Power Level To Which Restricted, If Any (Net MWe): None 10, Reasons For Restrictions, If Any: Not Applicable This Month Yr-to-Date Cumulative )
- 11. Ilours in Reporting Period 720.0 6551.0 113568.0
- 12. Number of flours Reactor Was Critical 720.0 5456.9 69519.8 I
- 13. Reactor Reserve Shutdown flours 0.0 0.0 953.3 l
- 14. 11ours Generator On-Line 720.0 5356.6 66883.8
- 15. Unit Reserve Shutdown llours - 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 2455221 18029347 222189721
- 17. Gross Elec. Energy Generated (MWII) 868525 6374402 77732348
- 18. Net Electrical Energy Generad (MWil) 834378 6124816 74710902
- 19. Unit Service Factor 100.0 81.8 82.0 l
- 20. Unit Availability Factor 100.0 81.8 82.0
- 21. Unit Capacity Factor (Using MDC Net) 100.3 80.8 80.0
- 22. Unit Capacity Factor (Using DER Net) 100.9 81.4 80.3
- 23. Unit Forced Outage Rate 0.0 0.9 6.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Non Scheduled and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Not Applicable Startup:
- NOTE: " Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operation began.
Increased MDC values (Items 6 & 7) starting 12/01/95.
Updated item 4 per NUREG4)020 in July 1998.
Decreased MDC value (Item 7) starting 05/01/99 1 of 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-443 UNIT SeabrookI DATE October 1,1999 COMPLETED BY P.E. Nardone TELEPl(ONE (603) 773-7074 MONDI SEPTEMBER,1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1157 17 1157 2 1158 18 1159 3 1159 19 1158 4 1159 20 1158 5 1159 21 1159 6 1159 22 1158 7 1159 23 1158 8 1159 24 1159 9 1160 25 1160 10 1160 26 11(4 11 1160 27 1160 .
1 12 1159 28 1160
_ f l
13 !!59 29 1160 1 14 - 1159 30 1160 15 1159 -
i l
16 1158 -
. -- l l
INSTRUCTIONS i On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Computt to the nearest whole megawatt.
2 Of 4
6 h -
. o
- T _
S F -
V E
R PI Of 9
9 4 T 1o 9
1 e
n 7
0 Ne o Og 1
k 1 dr 7-3 I
TP a -
o r e
a 7 7 C 3 o N A 4 r b )
4 b a
o .
3 0 e t
c E. 0 EE 5 S O P 6
( VC I
TN hr T E Y E CE a O. I T B N ER a N N A RR m T U D u O i RU s OC i
t l ht E P K
i e LE CE R r o
C l & f O P E s D M T E ie S r O U t n
C A e C o N
T N
E S V #
N ET O ER I E SP O
T NE C ER U C I
D L E )
R ht n
0 R o=
G mno E N si t W
I8 TR ma k ur IO v O UT eD r(
P I I C mpn o) 4 SA a min D FE mr a c otci r a f
o N OR rSf uld c cd e x p
3 A DN Si OW lal u ua ta ueRE S I I O - mien r (r e N TD t a n anotnwh a t uoot W E M
ht e
MMACPO O M1 23459 D 3 T
U H 2 N n o
S O i t
S a T
I A i n
E m N R a x
U E _
) e n s n
)
ia e in a
lp ic lp _
N)
OS E x nL o x t
i& E _
T R I ( s t '
ee c ig r AU rT lu r r n tsi o
r )
RO I ia o ei n e r n UI Fe c Ra ri vEi a _
D( t nn yT ar anxl t
lp eagror n t s mneli at n toe pt el ai t oi i(
a r
- iuiu n f geur m r e _
nqa e epi eh pt
'E o sEMRROAOO s
P a Y e - - - - - - - -
T RABCDEFGI I 2
9 9
9 1
R, E E T B A M D E d T e P dedu l
E S c e rh oc 1 . FS 1
T O N N FS O B M
(, 3- RUFUELING INFORMATION REQUEST DOCKET NO. SM43 UNIT Seabrook 1 DATE October 1.1999 COMPLETED BY P.E. Nardone
, TELEPIIONE (603) 773-7071
'l. ;Name of Facility: Seabrook Unit 1
- 2. 1 Scheduled date fer next refueling shutdown: ' Refueling Outage 7,10/21/00-
'3. Scheduled date for restart following refueling: Refueling Outage 7,11/24/00 [ 35 days ]
4.' ' Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
YES: .LAR 99-02, " Operation with Relaxed Axial Offset Control and Continued Use of the Fixed Incore Detectors."
- 5. ' Schedule date(s) for submitting licensing action and supporting information: ,
i I
October 1999
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures
LAR 99-02 proposes Technical Specification changes to operate Seabroo!: Station with:
- a) Upgraded Westinghouse Fuel Design with Intermediate Flow Mixers (VANTAGE + w/lFMs).
- b) Safety analysis jointly supplied by Westinghouse and Duke Engineering Services.
c) _ Westinghouse Relaxed Axial Offset Control (RAOC) using the Fixed Incore Detection System.
. 7. l The number of fuel assemblies (a) in the core (b) in the spent fuel storage pool and (c) in the new fuel storage vault
-(a) 193 (b)' 452 (c) 0
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed t.orage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236-No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling'that can be discharged to the spent fuel pool assumlag the present licensed capacity:
, Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full
[ ! core offload capability.
I-The current licensed capacity is adequate until at least the year 2010.
I l'
4 of 4 L