MONTHYEARML20217F4531998-03-25025 March 1998 Exemption from Requirements of 10CFR70.24 Re Criticality Monitors at Sequoyah Nuclear Plant ML20216E4541998-03-0909 March 1998 Exemption from Requirement of 10CFR50.71(e)(4) to Submit Updates to Sequoyah Nuclear Plants,Units 1 & 2 FSAR within 6 Months of Each Unit Refueling Outage ML20078N9371994-12-0808 December 1994 Exemption Granted from Requirements of 10CFR50,App J,Section III.D.3 Re Performance of Local Leak Rate Tests at Intervals No Greater than 2 Yrs.Exemption States Will Be Performed During Cycle 7 Refueling Outage ML20058P2501993-12-16016 December 1993 Exemption for Plant,Unit 2,from Requirements of 10CFR50, App J,Sections III.D.2(a) & III.D.3 ML20046C6791993-07-23023 July 1993 Exemption from Requirements in Section III.A.6(b) of App J to 10CFR50 Re Accelerated Test Frequency ML20056C4731993-06-18018 June 1993 Exemption from Requirements of 10CFR50.60,such That in Determining Setpoint for LTOP Events,App G Curves for PT Limits Are Not Exceeded by More than 10% in Order to Be in Compliance W/Regulations ML20066J4281991-01-29029 January 1991 Exemption from Requirement in Section III.D.1(a) of App J to Allow 10-yr Inservice Insp to Be Scheduled Independently of ILRT 10-yr Svc Periods ML20028G8541990-08-27027 August 1990 Exemption Allowing Unit 2 to Continue on Normal Type a Test Frequency Having Util Conduct Third Type a Test of First 10- Yr Svc Period in Unit 2,Cycle 5 Refueling Outage in 1992 ML20237B4211987-12-14014 December 1987 Exemption from 10CFR50,App a Re GDC 56 for Vacuum Relief Lines.Vacuum Relief Lines Can Be Isolated Using spring- Loaded Check Valve in Series W/Butterfly Valve ML20237B5401987-12-14014 December 1987 Exemption from 10CFR50,App A,Gdc 55 Re RHR Supply Line Isolation Using Two Check Valves & Remote Manual Valve ML20084C7721984-04-11011 April 1984 Exemption from 10CFR50.49(g) Requirements for Compliance W/Dates for Final Environ Qualification of Electrical Equipment.Final Environ Qualification of Equipment Required by 851130 ML20079K6031982-12-23023 December 1982 Exemption from Hydrostatic Pressure Test Requirements of ASME Code Section XI, Rules & Inservice Insp of Nuclear Power Plant Components 1998-03-09
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20249B9401998-06-18018 June 1998 Confirmatory Order Modifying License,Effective Immediately. Orders That Util Shall Complete Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Plant, Units 1 & 2 ML20217F4531998-03-25025 March 1998 Exemption from Requirements of 10CFR70.24 Re Criticality Monitors at Sequoyah Nuclear Plant ML20216E4541998-03-0909 March 1998 Exemption from Requirement of 10CFR50.71(e)(4) to Submit Updates to Sequoyah Nuclear Plants,Units 1 & 2 FSAR within 6 Months of Each Unit Refueling Outage ML20141J1831997-05-23023 May 1997 Order Imposing Civil Monetary Penalty.Orders That Licensee Pay Civil Penalty in Amount of $50,000 within 30 Days of Date of Order ML20136H0571997-03-17017 March 1997 Order Imposing Civil Monetary Penalty.Order Resulted from 960708-0822 Insp Which Indicated That Licensee Had Not Conducted Activities in Full Compliance W/Nrc Requirements ML20092J2551995-09-15015 September 1995 Comment Supporting Draft RG DG-1043, Nuclear Power Plant Simulation Facilities for Use in Operator License Exams ML20077M6381994-12-29029 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors ML20078N9371994-12-0808 December 1994 Exemption Granted from Requirements of 10CFR50,App J,Section III.D.3 Re Performance of Local Leak Rate Tests at Intervals No Greater than 2 Yrs.Exemption States Will Be Performed During Cycle 7 Refueling Outage ML20065A0821994-03-22022 March 1994 Comment Supporting Proposed Rule 10CFR19 & 20 Re Radiation Protection Requirements Amended Definitions & Criteria ML20058P2501993-12-16016 December 1993 Exemption for Plant,Unit 2,from Requirements of 10CFR50, App J,Sections III.D.2(a) & III.D.3 ML20046C6791993-07-23023 July 1993 Exemption from Requirements in Section III.A.6(b) of App J to 10CFR50 Re Accelerated Test Frequency ML20056C4731993-06-18018 June 1993 Exemption from Requirements of 10CFR50.60,such That in Determining Setpoint for LTOP Events,App G Curves for PT Limits Are Not Exceeded by More than 10% in Order to Be in Compliance W/Regulations ML20096A0401992-05-0101 May 1992 Comment Supporting NUMARC Comments on Proposed 10CFR,Chapter 1, Elimination of Requirements Marginal to Safety ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML20091Q8161992-01-29029 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys (10CFR50.72 & 50.73):Clarification of NRC Sys & Guidelines for Reporting ML20029B2381991-03-0404 March 1991 Transcript of 910304 Telcon in Bethesda,Md W/Intl Brotherhood of Electrical Workers Union & Util Re Tech Specs for Work Schedules.Pp 1-7 ML20029B5881991-02-28028 February 1991 Notice of Appearance.* Notice Hearby Given of Appearance of Dr Nichols,Ej Vigluicci & TC Doolan as Counsel for TVA in Proceeding 91-623-07-OLA.W/Certificate of Svc ML20070E5671991-02-27027 February 1991 Comment Opposing Petition for Rulemaking PRM-73-9 Re Threat of Radiological Sabotage ML20066J4281991-01-29029 January 1991 Exemption from Requirement in Section III.D.1(a) of App J to Allow 10-yr Inservice Insp to Be Scheduled Independently of ILRT 10-yr Svc Periods ML20028G8541990-08-27027 August 1990 Exemption Allowing Unit 2 to Continue on Normal Type a Test Frequency Having Util Conduct Third Type a Test of First 10- Yr Svc Period in Unit 2,Cycle 5 Refueling Outage in 1992 ML20056B4121990-07-23023 July 1990 Transcript of 900723 Meeting W/Util in Rockville,Md Re Plant Cable Testing Program.Pp 1-95 ML20055G5681990-07-20020 July 1990 Order Imposing Civil Monetary Penalty in Amount of $75,000, Per Notice of Violation on 900412 ML20246J8141989-06-0909 June 1989 Transcript of 890609 TVA QA Conference in Rockville,Md Re Dissolution of TVA Engineering Assurance Organization.Pp 1- 126 ML20235T8991989-02-28028 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants.Rule Would Result in Greater Operator Turnover Rate ML20207J4071988-08-0404 August 1988 Changes to Transcript of 880804 Briefing Re Status of Sequoyah-1 ML20196C1801988-06-22022 June 1988 Notice of NRC Proposal to Amend OL at Subj Plant.Amend Would Delete Organizational Charts from Administrative Controls Section of Tech Specs Per Generic Ltr 88-06 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20150E2551988-06-13013 June 1988 Transcript of 880613 Hearing in Rockville,Md Re Restart of Util from Recent Scrams.Pp 1-77 ML20154E1171988-04-22022 April 1988 Receipt of Petition for Directors Decision Under 10CFR2.206.* Petition Requests That Commission Issue Order Suspending Full Power Operation of Facility Until Remedial Action Taken ML20148K9441988-03-0909 March 1988 Transcript of 880309 Meeting in Rockville,Md Re 10CFR50,App R Issues.Supporting Documentation Encl ML20196J1151988-03-0404 March 1988 Transcript of 880304 Meeting in Washington,Dc Re Briefing on Plant Restart.Pp 1-123.Supporting Documentation Encl ML20196H2791988-02-24024 February 1988 Transcript of 880224 Public Meeting in Chattanooga,Tn Re Util Operational Readiness.Presentation Slides Also Encl ML20195J6821988-01-20020 January 1988 Transcript of 880120 Briefing on Status of Plant Restart in Washington,Dc.Pp 1-59.Viewgraphs Encl ML20237B5401987-12-14014 December 1987 Exemption from 10CFR50,App A,Gdc 55 Re RHR Supply Line Isolation Using Two Check Valves & Remote Manual Valve ML20237B4211987-12-14014 December 1987 Exemption from 10CFR50,App a Re GDC 56 for Vacuum Relief Lines.Vacuum Relief Lines Can Be Isolated Using spring- Loaded Check Valve in Series W/Butterfly Valve ML20236X5011987-11-24024 November 1987 Transcript of 871124 Meeting in Bethesda,Md Re Silicone Rubber Insulated Cable at Plant.Pp 1-122.List of Attendees & TVA Presentation Matl Encl ML20235B1491987-09-11011 September 1987 Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71 ML20235G3091987-09-10010 September 1987 Notice of Denial of Portion of Request for Licenses DPR-77 & DPR-79 & Opportunity for Hearing.Proposed Changes to Delete Requirement for Plant Operations Review Committee Review of Temporary Procedure Intent Denied ML20235B2651987-09-10010 September 1987 Transcript of 870910 NRC-TVA Meeting in Knoxville,Tn.Pp 1- 89.Supporting Documentation Encl ML20235X1171987-07-13013 July 1987 Transcript of 870713 Meeting W/Util in Bethesda,Md Re Cable Testing at Plant.Pp 1-140.Supporting Documentation Encl ML20235Y4551987-07-0808 July 1987 Transcript of NRC & TVA 870708 Meeting in Chattanooga,Tn Re Independent Design Insp.Pp 1-34.Related Info Encl ML20215F2101987-06-0808 June 1987 Transcript of 870608 Meeting W/Util in Bethesda,Md Re Idvp Insp for Plant.Pp 1-42.Related Documentation Encl ML20214R0291987-05-21021 May 1987 Transcript of 870521 Meeting W/Util in Chattanooga,Tn Re Status of Essential Elements of Plant Restart Program. Pp 1-301.Viewgraphs Encl ML20214L6001987-04-20020 April 1987 Transcript of 870420 NRC-TVA Meeting in Chattanooga,Tn.Pp 1- 286.Supporting Documentation Encl ML20214F4501987-04-10010 April 1987 Transcript of 870410 Meeting W/Util in Bethesda,Md.Pp 1-158. Supporting Documentation Encl ML20211K0991986-06-20020 June 1986 Order Scheduling Prehearing Conference on 860708 in Hauppauge,Ny.Served on 860624 ML20199D9511986-06-13013 June 1986 Transcript of ACRS Ad Hoc Subcommittee on TVA 860613 Meeting in Daisy,Tn Re Sequoyah Nuclear Performance Plan. Pp 1-85.Supporting Documentation Encl ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20136D8111985-11-20020 November 1985 Memorandum & Order Denying TVA 850927 Request for Extension of 851130 Deadline for Environ Qualification of Electrical Equipment.Licensee Failed to Demonstrate Extraordinary Circumstances to Support Extension.Served on 851120 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 1998-06-18
[Table view] |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION in the Matter of THE TENNESSEE VALLEY
> Docket No. 50-328 KdTHORITY (Sequoyah Nuclear Plant, Unit 2)
EXEMPTION 1.
The Tennessee Valley Authority (the licensee) is the holder of Facility Operating License No. DPR-79 which authorizes operation of the Sequoyah Nuclear Plant, Unit 2.
This license provides that, among other things, Unit 2 is subject to all rules, regulations, and orders of the Nuclear Regulatory Com-mission (Commission) now or hereafter in effect.
The Sequoyah Nuclear Plant, Unit 2, is one of the two pressurized water reactors located at the licensee's site in Hamilton County, Tennessee.
II.
General Design Criterion (GDC) 52 of Appendix A to 10 CFR Part 50 requires that each reactor containment be designed so that periodic integrated leakage rate testing can be conducted to assure containment isolation integrity.
Section 111.D.1(a) of Appendix J to 10 CFR Part 50 requires that the third Type A test in a 10-year service period shall be conducted when the unit is shut down for the 10-year unit inservice inspection (ISI).
The Type A tests are conducted to measure the primary reactor containment integrated leakage rate. They are also known as the containment integrated leak rate tests.
These tests are required by Appendix J to assure that the containment leakage following a large break loss-of-coolant accident is less -
Q1310250910129 p
ADOCK 05000328 '
PDR
than the inaximum allowable leak rate assumed in the accident analysis.
In j
addition to the Type A tests, Appendix J requires Type B and Type C tests of j
leakage through containment penetrations and containment isolation valves to also assure containment integrity during an accident. This requested exemption does not affect the requirements on (1) the Type B and Type C tests in Appen-dix J or (2) the maximum allowed containment leakage rate in Appendix J and the Unit 2 Technical Specifications.
The containment is required to be operable when the unit is at reactor system conditions above cold shutdown and refueling. The containment is not required for cold shutdown or refueling.
By letter dated August 31, 1990, the licensee requested an exemption from the Type A testing requirements in Section III.D.1(a) of Appendix J.
This is an exemption from conducting the third Type A test in a 10-year service period during the unit shutdown for the 10-year inservice inspection (151). The third Type A test for the first 10-year service period for Unit 2 b wneduled for the Unit 2 Cycle 5 refueling outage in 1992. The licensee contends that, because the 10-year ISI has been extended beyond 1992, the inspection is not required for the Unit 2 Cycle 5 refueling outage and, therefore,.must be i
uncoupled from the third Type A test in each 10-year service period which is-1 l
required by Appendix J.
TVA stated that the third Type A test of the first 10-year service period for Unit 2 is presently scheduled to commence toward the end of the Unit 2 Cycle 5 refueling outage (i.e., May 1992).
It intends to conduct the Unit 2 10-year inservice inspection during the Unit 2 Cycle 6 refueling' outage (i.e.,-
l October-November 1993).
~ ~.
. ~..
l l
t l and concludes it is justified on the grounds that the third Type A test within each 10-year service period and the 10-year ISI must be scheduled separately 1
for Unit 2 and the safe operation of Unit 2 does not require that the two tests be conducted in the same outage. The licensee is still required to conduct the Unit 210-year ISI. in accordance with Section XI of the ASME Code.
III.
Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12, the exempticns are (1) authorized by lew, (2) vill not present an undue risk to public health and safety, and are (3) consistent with the common defense and secu ri ty. The Commission further determines that special circumstances, as provided in 10 CFR 50.12(a)(2)(ii), are present justifying the exemption --
narcly, that application of the reguletion in these particular circumstances is not necessary to achieve the underlying purpose of the rule in that the Unit 2 containment will continue to provirie a reliable and acceptable means of contain-ment isolation integrity within the leakage requirements of Appendix J and the i
Unit 2 Technical Specifications and the Unit 210-year ISI will still be conducted in accordance with the ASME Code.
When Appendix J was adopted, the end of the 10-year service period and the 10-year inservice inspection outage were contemplated to be cancurrent mile-stones; however, these milestones are unrelated within the meaning of con-tainment integrity because the 10-year ISI is not conducted to assure contain-ment integrity. The Tyra A, B, an' C tests of Appendix J assure containment integrity. The rule did not anticipate extended outages that would extend the 10-year ISI in accordance with the ASME Code. Appendix J requires that the Unit 210-year ISI be rescheduled +o coincide with the Unit 2 Cycle 5 refueling
i 1 4 The 10-year ISI is not related to the integrity of the containment pres-'
i sure boundary. The purpose of the Appendix J test program is to ensure that leakage through the primary reactor containment does not exceed allowable leakage rate values. The purpose of the ISI program is to ensure that struc-tural integrity of Class 1, 2, and 3 components is maintained in accordance with ASME Code requirements. Therefore, the proposed separation has no safety consequences because the requirements on containment integrity in Appendix J and the Unit 2 Technical Specifications, and on structural integrity of ass 1, 2, and 3 components in the ASME Code are not being changed by the proposed exemption.
The 10-year ISI is scheduled for the Unit 2 Cycle 6 refueling outage in 1993 in accordance with Section XI of the American Society of Mechanical Engineers (ASME)Codeandwith10CFR50.55a(g)(4). The first 10-year ISI for Unit 2 is, therefore, scheduled for a future refueling outage other than the upcoming Unit 2 Cycle 5 refueling outage which is scheduled for 1992. The extension of the 10-year ISI is necessary in order for the plant to accumulate sufficient operating time to conduct the 10-year ISI because of the extended 33-month outage of Unit 2 from 1985 to 1988.
In accordance with the prov'sion'.
ofSectionXI,ArticleIWA-2400(c),oftheASMECode,thelicenseeextended the Sequoyah Unit 2 10-year ISI to 1993.
(The Unit 110-year ISI was extended to 1994 because of the similar extended outage from 1985 to 1988.)
The ASME Code allows the 10-year ISI to be postponed if the time the plant has operated is significantly less than the 10-year inspection cycle which is true for Sequoyah because of its extended outage.
The staff has considered the Appendix ( exemption request for uncoupling-the third Type A test of each 10-year service period from the 10-year unit IL
~
9 outage. The 10-year inservice inspection for Unit 2 it currently scheduled for 1993 in accordance with Section XI cf the ASME Code. d 10 CFR 50.55a(g)(4).
Performing the 10-year 151 carly and concurrent with the third Type' A test in a 10-year service period is not necessary to-' assure contairment isolation integrity and would;impore a hardship on the licensee with little or no 4
increase in the level of qua'lity or safety at Unit 2.
Accordingly, pursuant to 10 CFR 50.12(a)(2)(ii),' the Commission hereby grants an exemption frcr the requirements of Section III.D.1(a) of Appendix J.
j to 10 CFR Part 50 to the liccnsee for operation of-the Sequoyah Nuclear Plant, Unit 2, as described above. The Commission granted such an exemption for i
Unit 1 in its letter dated September 29,1989.
i Pursuant to 10 CFR 51.32, the-Commission has determined that the issuance of this exemption will have no significant:impace on-the environment. This was noticed in the Federal Register (56 FR3121
, January 28,1991).
1 For further details with respect to this action, see the request for exemption dated August 31, 1990, which is available for public inspection at the C0 scission's Public Document Room, Gelman Building, 2120 L Street, N.W.,
Washington, DC., and at the Chattanooga-Hamilter County Bicentennial Library, 1001 Broad Street, Chattanooga, Tennessee 37402.-
This exen.ption is effective upon issuance.
F0 THE NUCLEAR REGULATORY COMMISSION' k
hf irectp%
even A. Varga, Division of Reactor Pro c s - I/II Office of Nuclear Reactor egulation Dated at Rockville, Maryland this 29th day of January 1991 I