Transcript of 910304 Telcon in Bethesda,Md W/Intl Brotherhood of Electrical Workers Union & Util Re Tech Specs for Work Schedules.Pp 1-7ML20029B238 |
Person / Time |
---|
Site: |
Sequoyah |
---|
Issue date: |
03/04/1991 |
---|
From: |
Atomic Safety and Licensing Board Panel |
---|
To: |
|
---|
References |
---|
90-635-07-OLA, 90-635-7-OLA, OLA, NUDOCS 9103060277 |
Download: ML20029B238 (9) |
|
|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20249B9401998-06-18018 June 1998 Confirmatory Order Modifying License,Effective Immediately. Orders That Util Shall Complete Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Plant, Units 1 & 2 ML20217F4531998-03-25025 March 1998 Exemption from Requirements of 10CFR70.24 Re Criticality Monitors at Sequoyah Nuclear Plant ML20216E4541998-03-0909 March 1998 Exemption from Requirement of 10CFR50.71(e)(4) to Submit Updates to Sequoyah Nuclear Plants,Units 1 & 2 FSAR within 6 Months of Each Unit Refueling Outage ML20141J1831997-05-23023 May 1997 Order Imposing Civil Monetary Penalty.Orders That Licensee Pay Civil Penalty in Amount of $50,000 within 30 Days of Date of Order ML20136H0571997-03-17017 March 1997 Order Imposing Civil Monetary Penalty.Order Resulted from 960708-0822 Insp Which Indicated That Licensee Had Not Conducted Activities in Full Compliance W/Nrc Requirements ML20092J2551995-09-15015 September 1995 Comment Supporting Draft RG DG-1043, Nuclear Power Plant Simulation Facilities for Use in Operator License Exams ML20077M6381994-12-29029 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors ML20078N9371994-12-0808 December 1994 Exemption Granted from Requirements of 10CFR50,App J,Section III.D.3 Re Performance of Local Leak Rate Tests at Intervals No Greater than 2 Yrs.Exemption States Will Be Performed During Cycle 7 Refueling Outage ML20065A0821994-03-22022 March 1994 Comment Supporting Proposed Rule 10CFR19 & 20 Re Radiation Protection Requirements Amended Definitions & Criteria ML20058P2501993-12-16016 December 1993 Exemption for Plant,Unit 2,from Requirements of 10CFR50, App J,Sections III.D.2(a) & III.D.3 ML20046C6791993-07-23023 July 1993 Exemption from Requirements in Section III.A.6(b) of App J to 10CFR50 Re Accelerated Test Frequency ML20056C4731993-06-18018 June 1993 Exemption from Requirements of 10CFR50.60,such That in Determining Setpoint for LTOP Events,App G Curves for PT Limits Are Not Exceeded by More than 10% in Order to Be in Compliance W/Regulations ML20096A0401992-05-0101 May 1992 Comment Supporting NUMARC Comments on Proposed 10CFR,Chapter 1, Elimination of Requirements Marginal to Safety ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML20091Q8161992-01-29029 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys (10CFR50.72 & 50.73):Clarification of NRC Sys & Guidelines for Reporting ML20029B2381991-03-0404 March 1991 Transcript of 910304 Telcon in Bethesda,Md W/Intl Brotherhood of Electrical Workers Union & Util Re Tech Specs for Work Schedules.Pp 1-7 ML20029B5881991-02-28028 February 1991 Notice of Appearance.* Notice Hearby Given of Appearance of Dr Nichols,Ej Vigluicci & TC Doolan as Counsel for TVA in Proceeding 91-623-07-OLA.W/Certificate of Svc ML20070E5671991-02-27027 February 1991 Comment Opposing Petition for Rulemaking PRM-73-9 Re Threat of Radiological Sabotage ML20066J4281991-01-29029 January 1991 Exemption from Requirement in Section III.D.1(a) of App J to Allow 10-yr Inservice Insp to Be Scheduled Independently of ILRT 10-yr Svc Periods ML20028G8541990-08-27027 August 1990 Exemption Allowing Unit 2 to Continue on Normal Type a Test Frequency Having Util Conduct Third Type a Test of First 10- Yr Svc Period in Unit 2,Cycle 5 Refueling Outage in 1992 ML20056B4121990-07-23023 July 1990 Transcript of 900723 Meeting W/Util in Rockville,Md Re Plant Cable Testing Program.Pp 1-95 ML20055G5681990-07-20020 July 1990 Order Imposing Civil Monetary Penalty in Amount of $75,000, Per Notice of Violation on 900412 ML20246J8141989-06-0909 June 1989 Transcript of 890609 TVA QA Conference in Rockville,Md Re Dissolution of TVA Engineering Assurance Organization.Pp 1- 126 ML20235T8991989-02-28028 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants.Rule Would Result in Greater Operator Turnover Rate ML20207J4071988-08-0404 August 1988 Changes to Transcript of 880804 Briefing Re Status of Sequoyah-1 ML20196C1801988-06-22022 June 1988 Notice of NRC Proposal to Amend OL at Subj Plant.Amend Would Delete Organizational Charts from Administrative Controls Section of Tech Specs Per Generic Ltr 88-06 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20150E2551988-06-13013 June 1988 Transcript of 880613 Hearing in Rockville,Md Re Restart of Util from Recent Scrams.Pp 1-77 ML20154E1171988-04-22022 April 1988 Receipt of Petition for Directors Decision Under 10CFR2.206.* Petition Requests That Commission Issue Order Suspending Full Power Operation of Facility Until Remedial Action Taken ML20148K9441988-03-0909 March 1988 Transcript of 880309 Meeting in Rockville,Md Re 10CFR50,App R Issues.Supporting Documentation Encl ML20196J1151988-03-0404 March 1988 Transcript of 880304 Meeting in Washington,Dc Re Briefing on Plant Restart.Pp 1-123.Supporting Documentation Encl ML20196H2791988-02-24024 February 1988 Transcript of 880224 Public Meeting in Chattanooga,Tn Re Util Operational Readiness.Presentation Slides Also Encl ML20195J6821988-01-20020 January 1988 Transcript of 880120 Briefing on Status of Plant Restart in Washington,Dc.Pp 1-59.Viewgraphs Encl ML20237B5401987-12-14014 December 1987 Exemption from 10CFR50,App A,Gdc 55 Re RHR Supply Line Isolation Using Two Check Valves & Remote Manual Valve ML20237B4211987-12-14014 December 1987 Exemption from 10CFR50,App a Re GDC 56 for Vacuum Relief Lines.Vacuum Relief Lines Can Be Isolated Using spring- Loaded Check Valve in Series W/Butterfly Valve ML20236X5011987-11-24024 November 1987 Transcript of 871124 Meeting in Bethesda,Md Re Silicone Rubber Insulated Cable at Plant.Pp 1-122.List of Attendees & TVA Presentation Matl Encl ML20235B1491987-09-11011 September 1987 Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71 ML20235G3091987-09-10010 September 1987 Notice of Denial of Portion of Request for Licenses DPR-77 & DPR-79 & Opportunity for Hearing.Proposed Changes to Delete Requirement for Plant Operations Review Committee Review of Temporary Procedure Intent Denied ML20235B2651987-09-10010 September 1987 Transcript of 870910 NRC-TVA Meeting in Knoxville,Tn.Pp 1- 89.Supporting Documentation Encl ML20235X1171987-07-13013 July 1987 Transcript of 870713 Meeting W/Util in Bethesda,Md Re Cable Testing at Plant.Pp 1-140.Supporting Documentation Encl ML20235Y4551987-07-0808 July 1987 Transcript of NRC & TVA 870708 Meeting in Chattanooga,Tn Re Independent Design Insp.Pp 1-34.Related Info Encl ML20215F2101987-06-0808 June 1987 Transcript of 870608 Meeting W/Util in Bethesda,Md Re Idvp Insp for Plant.Pp 1-42.Related Documentation Encl ML20214R0291987-05-21021 May 1987 Transcript of 870521 Meeting W/Util in Chattanooga,Tn Re Status of Essential Elements of Plant Restart Program. Pp 1-301.Viewgraphs Encl ML20214L6001987-04-20020 April 1987 Transcript of 870420 NRC-TVA Meeting in Chattanooga,Tn.Pp 1- 286.Supporting Documentation Encl ML20214F4501987-04-10010 April 1987 Transcript of 870410 Meeting W/Util in Bethesda,Md.Pp 1-158. Supporting Documentation Encl ML20211K0991986-06-20020 June 1986 Order Scheduling Prehearing Conference on 860708 in Hauppauge,Ny.Served on 860624 ML20199D9511986-06-13013 June 1986 Transcript of ACRS Ad Hoc Subcommittee on TVA 860613 Meeting in Daisy,Tn Re Sequoyah Nuclear Performance Plan. Pp 1-85.Supporting Documentation Encl ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20136D8111985-11-20020 November 1985 Memorandum & Order Denying TVA 850927 Request for Extension of 851130 Deadline for Environ Qualification of Electrical Equipment.Licensee Failed to Demonstrate Extraordinary Circumstances to Support Extension.Served on 851120 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 1998-06-18
[Table view] Category:TRANSCRIPTS
MONTHYEARML20029B2381991-03-0404 March 1991 Transcript of 910304 Telcon in Bethesda,Md W/Intl Brotherhood of Electrical Workers Union & Util Re Tech Specs for Work Schedules.Pp 1-7 ML20056B4121990-07-23023 July 1990 Transcript of 900723 Meeting W/Util in Rockville,Md Re Plant Cable Testing Program.Pp 1-95 ML20246J8141989-06-0909 June 1989 Transcript of 890609 TVA QA Conference in Rockville,Md Re Dissolution of TVA Engineering Assurance Organization.Pp 1- 126 ML20207J4071988-08-0404 August 1988 Changes to Transcript of 880804 Briefing Re Status of Sequoyah-1 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20150E2551988-06-13013 June 1988 Transcript of 880613 Hearing in Rockville,Md Re Restart of Util from Recent Scrams.Pp 1-77 ML20148K9441988-03-0909 March 1988 Transcript of 880309 Meeting in Rockville,Md Re 10CFR50,App R Issues.Supporting Documentation Encl ML20196J1151988-03-0404 March 1988 Transcript of 880304 Meeting in Washington,Dc Re Briefing on Plant Restart.Pp 1-123.Supporting Documentation Encl ML20196H2791988-02-24024 February 1988 Transcript of 880224 Public Meeting in Chattanooga,Tn Re Util Operational Readiness.Presentation Slides Also Encl ML20195J6821988-01-20020 January 1988 Transcript of 880120 Briefing on Status of Plant Restart in Washington,Dc.Pp 1-59.Viewgraphs Encl ML20236X5011987-11-24024 November 1987 Transcript of 871124 Meeting in Bethesda,Md Re Silicone Rubber Insulated Cable at Plant.Pp 1-122.List of Attendees & TVA Presentation Matl Encl ML20235B1491987-09-11011 September 1987 Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71 ML20235B2651987-09-10010 September 1987 Transcript of 870910 NRC-TVA Meeting in Knoxville,Tn.Pp 1- 89.Supporting Documentation Encl ML20235X1171987-07-13013 July 1987 Transcript of 870713 Meeting W/Util in Bethesda,Md Re Cable Testing at Plant.Pp 1-140.Supporting Documentation Encl ML20235Y4551987-07-0808 July 1987 Transcript of NRC & TVA 870708 Meeting in Chattanooga,Tn Re Independent Design Insp.Pp 1-34.Related Info Encl ML20215F2101987-06-0808 June 1987 Transcript of 870608 Meeting W/Util in Bethesda,Md Re Idvp Insp for Plant.Pp 1-42.Related Documentation Encl ML20214R0291987-05-21021 May 1987 Transcript of 870521 Meeting W/Util in Chattanooga,Tn Re Status of Essential Elements of Plant Restart Program. Pp 1-301.Viewgraphs Encl ML20214L6001987-04-20020 April 1987 Transcript of 870420 NRC-TVA Meeting in Chattanooga,Tn.Pp 1- 286.Supporting Documentation Encl ML20214F4501987-04-10010 April 1987 Transcript of 870410 Meeting W/Util in Bethesda,Md.Pp 1-158. Supporting Documentation Encl ML20199D9511986-06-13013 June 1986 Transcript of ACRS Ad Hoc Subcommittee on TVA 860613 Meeting in Daisy,Tn Re Sequoyah Nuclear Performance Plan. Pp 1-85.Supporting Documentation Encl ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20009A6691981-06-17017 June 1981 Transcript of 810617 Commission Meeting in Washington,Dc to Discuss & Vote on OL for Facility.Pp 1-30 ML20005A2141981-06-0909 June 1981 Transcript of 810609 Meeting in Washington,Dc for Discussion & Possible Vote on Full Power OL for Facility.Pages 1-19. Draft Ltr to Util,License,Fr Notice & Viewgraphs Encl ML20032C8951981-06-0404 June 1981 Transcript of 810604 Public Meeting in Washington,Dc Re Discussion & Possible Vote on Full Power License for Facility.Pp 1-68.Viewgraphs & Draft Notice of Issuance of Facility OL Encl ML20002C0601981-01-0606 January 1981 Transcript of ACRS Subcommittee on Sequoyah Nuclear Power Plant 810106 Meeting in Washington,Dc.Pp 1-172.Supporting Documents Encl ML19337A4681980-09-16016 September 1980 Transcript of 800916 Public Meeting in Washington,Dc Re Discussion & Vote on Commission Program to Review OL Applications,Am Session.Pp 1-62 ML19331E0641980-09-0202 September 1980 Transcript of ACRS Subcommittee on Structural Engineering 800902 Hearing in Washington,Dc Re Establishing Max External Pressure Temp That Sequoyah Containment Structure Can Withstand ML19344A5871980-08-14014 August 1980 Transcript of 800814 Briefing in Washington,Dc Re Hydrogen Control in Facility Containment.Pp 1-44.Viewgraphs & 800303 Rept, Hydrogen Control for Sequoyah Nuclear Plant, Encl ML19320D6761980-07-0909 July 1980 Transcript of ACRS Subcommittee on Sequoyah Nuclear Plant 800709 Meeting in Washington,Dc.Pp 1-266 ML19310A2571980-06-0202 June 1980 Transcript of ACRS Subcommittee on Sequoyah Nuclear Power Station Meeting on 800602 in Washington,Dc.Pp 1-231. Morning Session.Viewgraphs & Related Matls Encl 1991-03-04
[Table view] Category:DEPOSITIONS
MONTHYEARML20029B2381991-03-0404 March 1991 Transcript of 910304 Telcon in Bethesda,Md W/Intl Brotherhood of Electrical Workers Union & Util Re Tech Specs for Work Schedules.Pp 1-7 ML20056B4121990-07-23023 July 1990 Transcript of 900723 Meeting W/Util in Rockville,Md Re Plant Cable Testing Program.Pp 1-95 ML20246J8141989-06-0909 June 1989 Transcript of 890609 TVA QA Conference in Rockville,Md Re Dissolution of TVA Engineering Assurance Organization.Pp 1- 126 ML20207J4071988-08-0404 August 1988 Changes to Transcript of 880804 Briefing Re Status of Sequoyah-1 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20150E2551988-06-13013 June 1988 Transcript of 880613 Hearing in Rockville,Md Re Restart of Util from Recent Scrams.Pp 1-77 ML20148K9441988-03-0909 March 1988 Transcript of 880309 Meeting in Rockville,Md Re 10CFR50,App R Issues.Supporting Documentation Encl ML20196J1151988-03-0404 March 1988 Transcript of 880304 Meeting in Washington,Dc Re Briefing on Plant Restart.Pp 1-123.Supporting Documentation Encl ML20196H2791988-02-24024 February 1988 Transcript of 880224 Public Meeting in Chattanooga,Tn Re Util Operational Readiness.Presentation Slides Also Encl ML20195J6821988-01-20020 January 1988 Transcript of 880120 Briefing on Status of Plant Restart in Washington,Dc.Pp 1-59.Viewgraphs Encl ML20236X5011987-11-24024 November 1987 Transcript of 871124 Meeting in Bethesda,Md Re Silicone Rubber Insulated Cable at Plant.Pp 1-122.List of Attendees & TVA Presentation Matl Encl ML20235B1491987-09-11011 September 1987 Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71 ML20235B2651987-09-10010 September 1987 Transcript of 870910 NRC-TVA Meeting in Knoxville,Tn.Pp 1- 89.Supporting Documentation Encl ML20235X1171987-07-13013 July 1987 Transcript of 870713 Meeting W/Util in Bethesda,Md Re Cable Testing at Plant.Pp 1-140.Supporting Documentation Encl ML20235Y4551987-07-0808 July 1987 Transcript of NRC & TVA 870708 Meeting in Chattanooga,Tn Re Independent Design Insp.Pp 1-34.Related Info Encl ML20215F2101987-06-0808 June 1987 Transcript of 870608 Meeting W/Util in Bethesda,Md Re Idvp Insp for Plant.Pp 1-42.Related Documentation Encl ML20214R0291987-05-21021 May 1987 Transcript of 870521 Meeting W/Util in Chattanooga,Tn Re Status of Essential Elements of Plant Restart Program. Pp 1-301.Viewgraphs Encl ML20214L6001987-04-20020 April 1987 Transcript of 870420 NRC-TVA Meeting in Chattanooga,Tn.Pp 1- 286.Supporting Documentation Encl ML20214F4501987-04-10010 April 1987 Transcript of 870410 Meeting W/Util in Bethesda,Md.Pp 1-158. Supporting Documentation Encl ML20199D9511986-06-13013 June 1986 Transcript of ACRS Ad Hoc Subcommittee on TVA 860613 Meeting in Daisy,Tn Re Sequoyah Nuclear Performance Plan. Pp 1-85.Supporting Documentation Encl ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20009A6691981-06-17017 June 1981 Transcript of 810617 Commission Meeting in Washington,Dc to Discuss & Vote on OL for Facility.Pp 1-30 ML20005A2141981-06-0909 June 1981 Transcript of 810609 Meeting in Washington,Dc for Discussion & Possible Vote on Full Power OL for Facility.Pages 1-19. Draft Ltr to Util,License,Fr Notice & Viewgraphs Encl ML20032C8951981-06-0404 June 1981 Transcript of 810604 Public Meeting in Washington,Dc Re Discussion & Possible Vote on Full Power License for Facility.Pp 1-68.Viewgraphs & Draft Notice of Issuance of Facility OL Encl ML20002C0601981-01-0606 January 1981 Transcript of ACRS Subcommittee on Sequoyah Nuclear Power Plant 810106 Meeting in Washington,Dc.Pp 1-172.Supporting Documents Encl ML19337A4681980-09-16016 September 1980 Transcript of 800916 Public Meeting in Washington,Dc Re Discussion & Vote on Commission Program to Review OL Applications,Am Session.Pp 1-62 ML19331E0641980-09-0202 September 1980 Transcript of ACRS Subcommittee on Structural Engineering 800902 Hearing in Washington,Dc Re Establishing Max External Pressure Temp That Sequoyah Containment Structure Can Withstand ML19344A5871980-08-14014 August 1980 Transcript of 800814 Briefing in Washington,Dc Re Hydrogen Control in Facility Containment.Pp 1-44.Viewgraphs & 800303 Rept, Hydrogen Control for Sequoyah Nuclear Plant, Encl ML19320D6761980-07-0909 July 1980 Transcript of ACRS Subcommittee on Sequoyah Nuclear Plant 800709 Meeting in Washington,Dc.Pp 1-266 ML19310A2571980-06-0202 June 1980 Transcript of ACRS Subcommittee on Sequoyah Nuclear Power Station Meeting on 800602 in Washington,Dc.Pp 1-231. Morning Session.Viewgraphs & Related Matls Encl 1991-03-04
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20029B2381991-03-0404 March 1991 Transcript of 910304 Telcon in Bethesda,Md W/Intl Brotherhood of Electrical Workers Union & Util Re Tech Specs for Work Schedules.Pp 1-7 ML20056B4121990-07-23023 July 1990 Transcript of 900723 Meeting W/Util in Rockville,Md Re Plant Cable Testing Program.Pp 1-95 ML20246J8141989-06-0909 June 1989 Transcript of 890609 TVA QA Conference in Rockville,Md Re Dissolution of TVA Engineering Assurance Organization.Pp 1- 126 ML20207J4071988-08-0404 August 1988 Changes to Transcript of 880804 Briefing Re Status of Sequoyah-1 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20150E2551988-06-13013 June 1988 Transcript of 880613 Hearing in Rockville,Md Re Restart of Util from Recent Scrams.Pp 1-77 ML20148K9441988-03-0909 March 1988 Transcript of 880309 Meeting in Rockville,Md Re 10CFR50,App R Issues.Supporting Documentation Encl ML20196J1151988-03-0404 March 1988 Transcript of 880304 Meeting in Washington,Dc Re Briefing on Plant Restart.Pp 1-123.Supporting Documentation Encl ML20196H2791988-02-24024 February 1988 Transcript of 880224 Public Meeting in Chattanooga,Tn Re Util Operational Readiness.Presentation Slides Also Encl ML20195J6821988-01-20020 January 1988 Transcript of 880120 Briefing on Status of Plant Restart in Washington,Dc.Pp 1-59.Viewgraphs Encl ML20236X5011987-11-24024 November 1987 Transcript of 871124 Meeting in Bethesda,Md Re Silicone Rubber Insulated Cable at Plant.Pp 1-122.List of Attendees & TVA Presentation Matl Encl ML20235B1491987-09-11011 September 1987 Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71 ML20235B2651987-09-10010 September 1987 Transcript of 870910 NRC-TVA Meeting in Knoxville,Tn.Pp 1- 89.Supporting Documentation Encl ML20235X1171987-07-13013 July 1987 Transcript of 870713 Meeting W/Util in Bethesda,Md Re Cable Testing at Plant.Pp 1-140.Supporting Documentation Encl ML20235Y4551987-07-0808 July 1987 Transcript of NRC & TVA 870708 Meeting in Chattanooga,Tn Re Independent Design Insp.Pp 1-34.Related Info Encl ML20215F2101987-06-0808 June 1987 Transcript of 870608 Meeting W/Util in Bethesda,Md Re Idvp Insp for Plant.Pp 1-42.Related Documentation Encl ML20214R0291987-05-21021 May 1987 Transcript of 870521 Meeting W/Util in Chattanooga,Tn Re Status of Essential Elements of Plant Restart Program. Pp 1-301.Viewgraphs Encl ML20214L6001987-04-20020 April 1987 Transcript of 870420 NRC-TVA Meeting in Chattanooga,Tn.Pp 1- 286.Supporting Documentation Encl ML20214F4501987-04-10010 April 1987 Transcript of 870410 Meeting W/Util in Bethesda,Md.Pp 1-158. Supporting Documentation Encl ML20199D9511986-06-13013 June 1986 Transcript of ACRS Ad Hoc Subcommittee on TVA 860613 Meeting in Daisy,Tn Re Sequoyah Nuclear Performance Plan. Pp 1-85.Supporting Documentation Encl ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20009A6691981-06-17017 June 1981 Transcript of 810617 Commission Meeting in Washington,Dc to Discuss & Vote on OL for Facility.Pp 1-30 ML20005A2141981-06-0909 June 1981 Transcript of 810609 Meeting in Washington,Dc for Discussion & Possible Vote on Full Power OL for Facility.Pages 1-19. Draft Ltr to Util,License,Fr Notice & Viewgraphs Encl ML20032C8951981-06-0404 June 1981 Transcript of 810604 Public Meeting in Washington,Dc Re Discussion & Possible Vote on Full Power License for Facility.Pp 1-68.Viewgraphs & Draft Notice of Issuance of Facility OL Encl ML20002C0601981-01-0606 January 1981 Transcript of ACRS Subcommittee on Sequoyah Nuclear Power Plant 810106 Meeting in Washington,Dc.Pp 1-172.Supporting Documents Encl ML19337A4681980-09-16016 September 1980 Transcript of 800916 Public Meeting in Washington,Dc Re Discussion & Vote on Commission Program to Review OL Applications,Am Session.Pp 1-62 ML19331E0641980-09-0202 September 1980 Transcript of ACRS Subcommittee on Structural Engineering 800902 Hearing in Washington,Dc Re Establishing Max External Pressure Temp That Sequoyah Containment Structure Can Withstand ML19344A5871980-08-14014 August 1980 Transcript of 800814 Briefing in Washington,Dc Re Hydrogen Control in Facility Containment.Pp 1-44.Viewgraphs & 800303 Rept, Hydrogen Control for Sequoyah Nuclear Plant, Encl ML19320D6761980-07-0909 July 1980 Transcript of ACRS Subcommittee on Sequoyah Nuclear Plant 800709 Meeting in Washington,Dc.Pp 1-266 ML19310A2571980-06-0202 June 1980 Transcript of ACRS Subcommittee on Sequoyah Nuclear Power Station Meeting on 800602 in Washington,Dc.Pp 1-231. Morning Session.Viewgraphs & Related Matls Encl 1991-03-04
[Table view] |
Text
_
ORIGlNAL OFFICIAL TRANSCRIPT OF PROCEEDINGS L,)
Agency:
Nuclear Regulatory Conunission Atomic Safety and Licensing Board Tennessee Valley Authority Sequoyah
Title:
Nuclear Plant (Unito 1 and 2)
Facility Operating License Nos.
DPR-77, DPR-79 Docket No.
so-3a7-otA, 50-328-otn ASLBP No. 90-635-07-OLA
(
1rcKnON:
Bethesda, Maryland DATE Monday, March 4, 1991 PAGES: 1-7 e
4 -
9 n
O(
/iW O ANN RILEY & ASSOCIATES, I'IT).
(] '
1612 K St. N.W, Su'te 300 Washington, D.C. 20006 (202) 293-3950 9103060277 910304 f
PDF ADOCF O'5000327 i
T PDR
1-1 UNITED STATES OF AMERICA s.
t
)
\\_/
2 HUCLEAR REGULATORY COMMISSION 4
ATOMIC SAFETY AND LICENSING BOARD 5
- - - - - - - - - - - - - - -x 6
In the Matter of:
7 TENNESSEE VALLEY AUTHORITY Docket Nos. 50-327-OLA 8
Soquoyah Nuclear Plant 50-328-OLA 9
(Units 1 and 2) 10
- Facility Operating ASLBP No. 90-635-07-OLA 11
. License Nos. DPR-77, DPR :
j 12
x
(}.
13-TELEPHONE CONFERENCE CALL qj 14 U.S.
Nuclear Regulatory Commission 15 4350 East / West Highway 16 Room 422 17 Bethesda, Maryland 18 The above-entitled matter came on for hearing via 19 telephone conference call at 10:00 a.m.,
Monday, March 4,.
}
20 1991,: when were present:
l 21 i
[.
-22
-BEFORE:
23 PETER B.
BLOCH p
l 24 JAMES H. CARPENTER 7
A 25 ADMINISTRATIVE LAW JUDGES
~.
2 1
ALSO PRESENT:
[VIA TELEPHONE)
O
' (_ /
2
'l 3
On Behalf of The U.S. Nuclear Regulatory 4'
Commission:
5 BY:
JANICE HOORE, ESQUIRE 6
BERNARD BORDENICK, ESQUIRE 7
PATRICIA YAHLE, ESQUIRE 8
office of General Counsel 9
Washington, D.C.
10-11 On Behalf of I.B.E.W.
Local 721:
12 BY:
JAMES T. SPRINGFIELD, ESQUIRE
~T
'13 General Counsel 1[b 14 I.B.E.W.
Local 721 15 2730 Thicket Road 16 Soddy-Daisy, Tennessee 37379 17 18 On Behalf of Tennessee Valley Authority:
19 BY:
DOUGLAS NICHOLS 20.
Business Manager
?L Tennessee Valley Authority 22 400 West Summit. Hill Drive, E11 B33 23 Knoxville, Tennessee 37902 24 s;
-()
25
... ~,.,
, ~ ~.
1 3
1 PROCEEDINGS fy k-)
2 (10:00 a.m.]
3 JUDGE BLOCH:
This is Peter Bloch, Chairman of the 4
Licensing Board in the Tennessee Valley Authority Sequoyah 1
5 Nuc) oar Plant Application for an Amendment to its License 6
concerning Technical Specifications for Work schedules.
The 7
Docket Numbers in this case are 50-327 OLA and 50-328 OLA.
8 Hero with m.e in my office is Judce James H.
9 Carpenter.
We also have in my office, at the request of the 10 parties, a Court Reporter.
The call has been called at the 11
. request of the parties, communicated to my office on Friday 12 by Janice Moore.
The purpose of today's talk, is I
[')
13 understand it, is to discuss the possibility of settlement
's_/
14 in this case.
15 What'I would til.e to do is ask the parties to 16 identify themselves for the record, starting with
-17 Intervenors.
8-NR. SPRINGFIELD:
Is'that me?
19 JUDGE ELOCH:
Yes.
3HF MR. SPRINGFIELD:
My name is James T.
Springfield, 21-and I am the Business Manager.for I.B.E.W.
Local 721.
I am
-22 also a reactor operator at Sequoyah Nuclear Plant,.and I am 23 doing this in representation of the members of the operators i
S hern at the Sequoyah Nuclear Plart.
24 25 JUDGE BLOCH:
Thank you.
Technically you are
)
~'
l t
l-r
4 correct, you are a Petitioner at this point. I haven't ruled 1
K-)
2 that you are an intervenor, so would be a little hard to 3
know how to identify yourse.f at that.
4 Do you have any objection with what I stated to be 5
the purpose of the conference?
6 MR. SPRINGFIELD:
Certainly, I think that I was 7
under the impression that the purpose was to give an 8
extension to the time of response that TVA had to make to 9
this issue to see if we could work it out at this March lith 10 meeting that we are going to have.
Really, after that, we 11 would more know whether we would be able to work it out or 12 not.
[ )D 13 MR. BORDENICK:
Judge Bloch, this is Bernie R
14 Bordenick.
I haven't identified myself yet, but can I jump 15 in here?
I was hoping to be the spokesperson for the --
16 JUDGE BLOCH:
If you would, please identify 17 yourself and the other staff attorney's, and then you can 18 make a brief statement on the purpose of the call alt,o.
19 MR. BCPCENICK:
All right.
As I indicated, I am 20 Bernard Borden17k.
I am with the Office of Ganeral Counsel, 21 U.S.
Nuclear Regulatory Commission.
I am representing the 22 staff in this proceeding.
23 With me this morning are Janice Moore and Patty Icar[,spellthatlastname, if the Reporter would 24 Yahle.-
O-s; 25 like.
~..
--.~
-.~. - -.-. - -...
5
-1 JUDGE BLOCH:
No, we have it.
2
-MR. BORDENICK:
Okay, fine.
Perhaps, Judge Bloch, 3
you might want to take the appearance of TVA and then come 4
back to me.
I will try to be th^ spokesperson.
5 JUDGE BLOCH:
Representing Applicant-today is --
6 MR. NICHOLS:
This is Douglas R.-Hicnols.
I am 7
Assistant General Counsel, OffA0e of the General Counsel in 8
TVA, representing TVA on this laatter.
9.
JUDGE BLOCH:
Thank you very much.
Mr. Bordenick.
10 MR. BORDENICK:
Okay.
As Mr.-Springfiel,d started
- to allude to, the parties have conferred by-telephone --
12
.when ITsay parties I mean the Union, TVA and the_Sthif.
We
'13 have agreed to hold a. meeting among ourselves nev. Monday, 14 that is, March lith, in Chattanooga, to discuss the issues 11 5
-in this' case and see what the' possibilities are for
-16 resolving the_' matter.
17-
- Also, in-connection withLthat' meeting, we request-
'18 L the Board to e-tend the time for the responses to the 3F
- hearing regrast until March-26th..I think1I have summarized:
3 20 what.the parties discussed last Friday.
If I, haven't, I am
'21 sure either Mr. Nichols or Mr. Springfield will correct me.
22 JUDGE BLOCH:
The only thing that puzzles me about 23-that is, why> you said ina needed a Court Reporter for this.
I-24 call if the purpose is just to agree 'on that procedure and-
' 2 5-V.:e extensionlaf time.
u i
,-3 m:-4
+~
-4
.,-w=--
--++m-m e
__._.. _ _. _ _ >.~ - - - -. -., -
6 1
MS.. MOORE:
This is Janice Moore.
2; MR.'BORDENICK:
She was_the one that --- MS.-MOORE:
That was my fault, I am' afraid.
When 4-I spoke with your Secretary we_weren't sure if there was 5
_anything else that'you wished to talk about at the 6
conference call.
When she asked me_I said yes, we wouldn't
-7 mind having a Court Reporter.
8 JUDGE BLOCH:
If the parties prefer to talk about 9
settlement amongLthemselves, I have no desire to' disturb
~ 10 -
their-preferences.-I wculd just like to ask Fr. Nichols if.
11 he ' has any different under*Aanding from what Mr. Bordanick
- 12 :
- just said?._
i I l [~') '
13-MR.,NICHOLS:- No, my understanding,. Judge Bloch, V
14 l1s no different than'Mr. Bordenick stated.. We also would
'15:
like~the-'same extension.
- 16=
! JUDGE-BLOCH: -If I understand-correctly,_the 17c extension will.be;until March 15th?
J18 MR. BORDEN1CK:- No, March 26th.
_19 -
JUDGE BLOCH:
Okay.
It..is the understanding of
-the Boardithat the' parties 1will be meeting Monday in~
20 12 1
_ Chattanooga to discuss possibilities of settlement,.and that-i h
22~
they' also. agree -that it's appropriateJto extend the: time 123-within which the applicant'and1 staff may respond-to the' L
24
- petition until. March 29, 1991.;
I, therefore,-affirm?the-l L
-25
-extension that they have agreed to.
E f
l lE t,1 r
7 f
1 Is there any comment on the order that I have just 2
entered?
3 (No response.]
4 JUDGE BLOCH:
There being none, the. call is 5
adjourned.
It's been a pleasure neeting all of you, and I 6
do regret that we spent money on a transcript.
Thank you 7
very much.
8-
[Whereupon, at 10:12 a.m.,
the conference call was e
9 concluded.)
10 11 12 13 14 15 16 17 18 19 s
20 21-22 23 24 9
25 l
-/
=
REPORTER'S CERTIFICATE This is to certify that the attached proceed-ings betore the United States Nuclear Regulatory Commission in the matter of:
NAME OF PROCEEDING:
TVA Units 1 and 2 DOCKET NUMBER:
50-327-OLA PLACE OF PROCEEDING:
Bethesda, Maryland were held as herein appears, and that this is the original transcript thereof for the file of the United States Nuclear Regulatory Commission taken by me and thereafter reduced to typewriting by me or under the direction'of the court report-
-i n n, company, and that the transcript is a true and accurate record of the foregoing proceedings.