|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20249B9401998-06-18018 June 1998 Confirmatory Order Modifying License,Effective Immediately. Orders That Util Shall Complete Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Plant, Units 1 & 2 ML20217F4531998-03-25025 March 1998 Exemption from Requirements of 10CFR70.24 Re Criticality Monitors at Sequoyah Nuclear Plant ML20216E4541998-03-0909 March 1998 Exemption from Requirement of 10CFR50.71(e)(4) to Submit Updates to Sequoyah Nuclear Plants,Units 1 & 2 FSAR within 6 Months of Each Unit Refueling Outage ML20141J1831997-05-23023 May 1997 Order Imposing Civil Monetary Penalty.Orders That Licensee Pay Civil Penalty in Amount of $50,000 within 30 Days of Date of Order ML20136H0571997-03-17017 March 1997 Order Imposing Civil Monetary Penalty.Order Resulted from 960708-0822 Insp Which Indicated That Licensee Had Not Conducted Activities in Full Compliance W/Nrc Requirements ML20092J2551995-09-15015 September 1995 Comment Supporting Draft RG DG-1043, Nuclear Power Plant Simulation Facilities for Use in Operator License Exams ML20077M6381994-12-29029 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors ML20078N9371994-12-0808 December 1994 Exemption Granted from Requirements of 10CFR50,App J,Section III.D.3 Re Performance of Local Leak Rate Tests at Intervals No Greater than 2 Yrs.Exemption States Will Be Performed During Cycle 7 Refueling Outage ML20065A0821994-03-22022 March 1994 Comment Supporting Proposed Rule 10CFR19 & 20 Re Radiation Protection Requirements Amended Definitions & Criteria ML20058P2501993-12-16016 December 1993 Exemption for Plant,Unit 2,from Requirements of 10CFR50, App J,Sections III.D.2(a) & III.D.3 ML20046C6791993-07-23023 July 1993 Exemption from Requirements in Section III.A.6(b) of App J to 10CFR50 Re Accelerated Test Frequency ML20056C4731993-06-18018 June 1993 Exemption from Requirements of 10CFR50.60,such That in Determining Setpoint for LTOP Events,App G Curves for PT Limits Are Not Exceeded by More than 10% in Order to Be in Compliance W/Regulations ML20096A0401992-05-0101 May 1992 Comment Supporting NUMARC Comments on Proposed 10CFR,Chapter 1, Elimination of Requirements Marginal to Safety ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML20091Q8161992-01-29029 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys (10CFR50.72 & 50.73):Clarification of NRC Sys & Guidelines for Reporting ML20029B2381991-03-0404 March 1991 Transcript of 910304 Telcon in Bethesda,Md W/Intl Brotherhood of Electrical Workers Union & Util Re Tech Specs for Work Schedules.Pp 1-7 ML20029B5881991-02-28028 February 1991 Notice of Appearance.* Notice Hearby Given of Appearance of Dr Nichols,Ej Vigluicci & TC Doolan as Counsel for TVA in Proceeding 91-623-07-OLA.W/Certificate of Svc ML20070E5671991-02-27027 February 1991 Comment Opposing Petition for Rulemaking PRM-73-9 Re Threat of Radiological Sabotage ML20066J4281991-01-29029 January 1991 Exemption from Requirement in Section III.D.1(a) of App J to Allow 10-yr Inservice Insp to Be Scheduled Independently of ILRT 10-yr Svc Periods ML20028G8541990-08-27027 August 1990 Exemption Allowing Unit 2 to Continue on Normal Type a Test Frequency Having Util Conduct Third Type a Test of First 10- Yr Svc Period in Unit 2,Cycle 5 Refueling Outage in 1992 ML20056B4121990-07-23023 July 1990 Transcript of 900723 Meeting W/Util in Rockville,Md Re Plant Cable Testing Program.Pp 1-95 ML20055G5681990-07-20020 July 1990 Order Imposing Civil Monetary Penalty in Amount of $75,000, Per Notice of Violation on 900412 ML20246J8141989-06-0909 June 1989 Transcript of 890609 TVA QA Conference in Rockville,Md Re Dissolution of TVA Engineering Assurance Organization.Pp 1- 126 ML20235T8991989-02-28028 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants.Rule Would Result in Greater Operator Turnover Rate ML20207J4071988-08-0404 August 1988 Changes to Transcript of 880804 Briefing Re Status of Sequoyah-1 ML20196C1801988-06-22022 June 1988 Notice of NRC Proposal to Amend OL at Subj Plant.Amend Would Delete Organizational Charts from Administrative Controls Section of Tech Specs Per Generic Ltr 88-06 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20150E2551988-06-13013 June 1988 Transcript of 880613 Hearing in Rockville,Md Re Restart of Util from Recent Scrams.Pp 1-77 ML20154E1171988-04-22022 April 1988 Receipt of Petition for Directors Decision Under 10CFR2.206.* Petition Requests That Commission Issue Order Suspending Full Power Operation of Facility Until Remedial Action Taken ML20148K9441988-03-0909 March 1988 Transcript of 880309 Meeting in Rockville,Md Re 10CFR50,App R Issues.Supporting Documentation Encl ML20196J1151988-03-0404 March 1988 Transcript of 880304 Meeting in Washington,Dc Re Briefing on Plant Restart.Pp 1-123.Supporting Documentation Encl ML20196H2791988-02-24024 February 1988 Transcript of 880224 Public Meeting in Chattanooga,Tn Re Util Operational Readiness.Presentation Slides Also Encl ML20195J6821988-01-20020 January 1988 Transcript of 880120 Briefing on Status of Plant Restart in Washington,Dc.Pp 1-59.Viewgraphs Encl ML20237B5401987-12-14014 December 1987 Exemption from 10CFR50,App A,Gdc 55 Re RHR Supply Line Isolation Using Two Check Valves & Remote Manual Valve ML20237B4211987-12-14014 December 1987 Exemption from 10CFR50,App a Re GDC 56 for Vacuum Relief Lines.Vacuum Relief Lines Can Be Isolated Using spring- Loaded Check Valve in Series W/Butterfly Valve ML20236X5011987-11-24024 November 1987 Transcript of 871124 Meeting in Bethesda,Md Re Silicone Rubber Insulated Cable at Plant.Pp 1-122.List of Attendees & TVA Presentation Matl Encl ML20235B1491987-09-11011 September 1987 Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71 ML20235G3091987-09-10010 September 1987 Notice of Denial of Portion of Request for Licenses DPR-77 & DPR-79 & Opportunity for Hearing.Proposed Changes to Delete Requirement for Plant Operations Review Committee Review of Temporary Procedure Intent Denied ML20235B2651987-09-10010 September 1987 Transcript of 870910 NRC-TVA Meeting in Knoxville,Tn.Pp 1- 89.Supporting Documentation Encl ML20235X1171987-07-13013 July 1987 Transcript of 870713 Meeting W/Util in Bethesda,Md Re Cable Testing at Plant.Pp 1-140.Supporting Documentation Encl ML20235Y4551987-07-0808 July 1987 Transcript of NRC & TVA 870708 Meeting in Chattanooga,Tn Re Independent Design Insp.Pp 1-34.Related Info Encl ML20215F2101987-06-0808 June 1987 Transcript of 870608 Meeting W/Util in Bethesda,Md Re Idvp Insp for Plant.Pp 1-42.Related Documentation Encl ML20214R0291987-05-21021 May 1987 Transcript of 870521 Meeting W/Util in Chattanooga,Tn Re Status of Essential Elements of Plant Restart Program. Pp 1-301.Viewgraphs Encl ML20214L6001987-04-20020 April 1987 Transcript of 870420 NRC-TVA Meeting in Chattanooga,Tn.Pp 1- 286.Supporting Documentation Encl ML20214F4501987-04-10010 April 1987 Transcript of 870410 Meeting W/Util in Bethesda,Md.Pp 1-158. Supporting Documentation Encl ML20211K0991986-06-20020 June 1986 Order Scheduling Prehearing Conference on 860708 in Hauppauge,Ny.Served on 860624 ML20199D9511986-06-13013 June 1986 Transcript of ACRS Ad Hoc Subcommittee on TVA 860613 Meeting in Daisy,Tn Re Sequoyah Nuclear Performance Plan. Pp 1-85.Supporting Documentation Encl ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20136D8111985-11-20020 November 1985 Memorandum & Order Denying TVA 850927 Request for Extension of 851130 Deadline for Environ Qualification of Electrical Equipment.Licensee Failed to Demonstrate Extraordinary Circumstances to Support Extension.Served on 851120 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 1998-06-18
[Table view] Category:PUBLIC COMMENTS ON PROPOSED RULES & PETITIONS FOR
MONTHYEARML20092J2551995-09-15015 September 1995 Comment Supporting Draft RG DG-1043, Nuclear Power Plant Simulation Facilities for Use in Operator License Exams ML20077M6381994-12-29029 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors ML20065A0821994-03-22022 March 1994 Comment Supporting Proposed Rule 10CFR19 & 20 Re Radiation Protection Requirements Amended Definitions & Criteria ML20096A0401992-05-0101 May 1992 Comment Supporting NUMARC Comments on Proposed 10CFR,Chapter 1, Elimination of Requirements Marginal to Safety ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML20091Q8161992-01-29029 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys (10CFR50.72 & 50.73):Clarification of NRC Sys & Guidelines for Reporting ML20070E5671991-02-27027 February 1991 Comment Opposing Petition for Rulemaking PRM-73-9 Re Threat of Radiological Sabotage ML20235T8991989-02-28028 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants.Rule Would Result in Greater Operator Turnover Rate 1995-09-15
[Table view] |
Text
i 4-e gggq g/M
/
37ft W6 N*
nn
/f
, - n ~, -.,.,s -,n -. ; ; ;;; _,, -
-MAY 011992 3
'n 2
s
?!
M
- d l2$
Mr. Samuel J. Chilk-Secretary of the Commission.
j$
U.S. Nuclear Regulatory Commission 3
Docketing and Service Branch
]
Q g
g Washington, DC 20555 co a
2
Dear Mc. Chilk:
NUCLEAR REGULATORY COMMISSION (NRC) - REQUEST FOR COMMENT ON 10 CFR CIIAPTER 1, ELIMINATION OF REQUIREMENTS MARGINAL TO SAFETY Tennessee Valley Authority (TVA) has reviewed the subject policy statement,-which was noticed in the February 4, 1992, E.cdcral E.c.gittter.
(57FR4166-4168) and is pleased to provide the followinc comments.
TVA supports the comments made by the Nuclear Manageme.
1 Resources Council (NUMARC) on this proposal regarding the elimina if s.
requirements _ marginal to safety.
Sincerely, l'
'~
.g M. J.
Burzynski Manager Nuclear Licensing and Regulatory Affairs l
cc See page 2 l-l-
9205080037-920501 PDR PR
' MISC 57FR4166 PDR
ld T
Mr. Samuel J. Chilk Page 2 MAY 011992 cc U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suir.( 2900 Atlanta, Georgia 30323 U.S. Nuclear Regulatory Commission ATTN: Moni Dey Office of Nuclear Regulatory Research Washington, DC 20555 1
- - - -