-. -. __ - .. . . -.

ENCLOSURE 5 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENT ADMINISTRATIVE CH ANGES DRUNSWICK UNIT 1 PROPOSED TECHNICAL SPECIFICATION PAGES 9403200362 940325 PDR ADOCK 05000324 P PDR

2.2 LIMITING SAFETY SYSTEM SETTINGS BASES

\

2.2.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SETPOINTS The Reactor Protection System Instrumentation Setpoints specified in Table 2.2.1-1 are the values.at which the Reactor Trips are set for each ,

parameter. The Trip Setpoints have been selected to ensure that the reactor l core and reactor coolant system are prevented from exceeding their safety limits.

1. Intermediate Range Monitor, Neutron Flux - High The IRM system consists of 8 chambers, 4 in each of the reacto'r trip systems. The IRM is a 5-decade 10-range instrument. The trip setpoint of 120 divisions is active in each of the 10 ranges. Thus as the IRM is ranged up to accommodate the increase in power level, the trip setpoint is also ranged ,

up. Range 10 allows the IRM instruments to remain on scale at higher power  ;

levels to provide for additional overlap and also permits calibration at these q higher powers.

The most significant source of reactivity change during the power increase is due to control rod withdrawal. In order to ensure that the IRM  ;

provides the required protection, a range of rod withdrawal accidents have been analyzed, Section 7.5 of the FSAR. The most severe case involves an initial condition in which the reactor is just subcritical and the IRMs are not yet on scale. Additional conservatism was taken in this analysis by  ;

. assuming the IRM channel closest to the rod being withdrawn is bypassed. The results of this analysis show that the reactor is shut down and peak power is limited to 1% of RATED THERMAL POWER, thus maintaining MCPR above the Safety '

Limit MCPR of Specification 2.1.2. Based on this analysis, the IRM provides protection against local control rod errors and continuous withdrawal of control rods in sequence and provides backup protection for the APRM.

2. Average Power Range Monitor For operation at low pressure and low flow during STARTUP, the APRM scram setting of 15% of RATED THERMAL POWER provides adequate thermal margin between the setpoint and the Safety Limits. This margin accommodates the anticipated maneuvers associated with power plant startup. Effects of increasing pressure ,

at zero or low void content are minor, cold water from sources available during startup.is not much colder than that already in the system, temperature 1 coefficients are small, and control rod patterns are constrained by the asCSA-3pd"RWM. Of all the possible sources of reactivity input, uniform control rod withdrawal is the most probable cause of significant power increase. Because the flux distribution associated with uniform rod withdrawals does not involve >

high local peaks and because several rods must be moved to change power by a.

significant amount,.the rate of power rise is very slow. Generally, the heat

! flux is in near equilibrium with the fission rate. In an assumed uniform rod withdrawal approach to the trip level, the rate of power rise is'not more than 5% nf RATED THERMAL POWER per minute and the APRM system would  ;

BRUNSWICK - UNIT 1 B 2-4 Amendment No.147 *

. l

2.2 LIMITINC SAFETY SYSTEM SETTINCS BASES (Continued)

4. Reactor Vessel Water Level-Low, Level #1 The reactor water level t rip point was chosen f ar enough below the normal operating level to avoid spurious scrams but high enough above the fuel to assure that there is adequate water to account for evaporation losses and ,

displacement of cooling following the most severe transients. This setting t was also used to develop the thermal-hydraulic limits of power versus flow. l,

5. Main Steam Line Isolation Valve-Closure The low pressure isolation of the main steamline trip was provided to give protection against rapid depressurization and resulting cooldown of the reactor vessel. Advantage was taken of the shutdown feature in the run node which occurs when the main steam line isolation valves are closed, to provide for reactor shutdown so that high power operation at low pressures does not occur. Thus, the combination of the low pressure isolation and isolation valve closure reactor trip with the mode switch in the Run posit ion assures  ;

the availability of neut ron flux protection over the entire range of the Safety Limits. In addition, the isolation valve closure t rip with the mode I switch in the Run position anticipates the pressure and flux t rans ient s which i occur during normal or inadvertent isolation valve closure.

6. Main Steam Line Radiation - High l

The Main Steam Line Radiation detectors are provided to detect a gross 1 failure of the fuel cladding. When the high radiation is detected, a scram is initiated to reduce the continued failure of fuel cladding. At the same time. l the Main Steam Line Isolation Valves are closed to limit the release of j fission products. The t rip setting is high enough above background radiation 1 level to prevent spurious scrams, yet low enough to promptly detect gross f ailures in the fuel cladding.

C H v1C)

The Main Steam Line Radiation detectors _ setpoints may be adjusted prior to placing the hydrogen water chemistry ~ W system in service. If the ,

setpoints are adjusted, the HWC system shat be placed in service or the  ! l setpoints shall be returned to the nornal full power values within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. l If the HWC system is not placed in service and the setpoints are not i readjusted within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, control rod motion shall be suspended (except for j scram or other emergency action) until the necessary adjustments are made. 1 Hydrogen injection may cause the radiation levels in the main steam lines to I increase. After shutting off the HWC system or decreasing power, the j setpoints shall be returned to the nornal full power values. j 1

The Technical Specification wording was derived using the EPRI  ;

"Cuidelines for Permanent BWR Hydrogen Water Chemistry Installations, 1987 Revision".

7. Drywell Pressure, High High pressure in the drywell could indicate a break in the nuclear process systems. The reactor is tripped in order to minimize the possibility of fuel danage and re(uce the amount of energy being added to the coolant.

The trip setting was selected as low as possible without causing spurious trips.

BRUNSWICK - UNIT 1 8 2-6 Amendment No.147 'l

9 l i

REACTIVITY CONTROL SYSTEMS 3/4 1.4 CONTROL ROD PROCRAM CONTROLS ROD WORTH MINIMIZER LIMITING CONDITION FOR OPERATION 3.1.4.1 The Rod Worth Minimizer (RWM) shall be OPERABLE when THERHAL POWER is less than 10% of RATED THERMAL POWER. l APPLICABILITY: OPERATIONAL CONDITIONS I and 2*.

ACTION:

a. With the RWM inoperable af ter the first 12 control rods have been fully withdrawn on a startup, operation may continue provided that '

control rod movement and compliance with the prescribed BPWS control rod pat tern are verified by a second licensed operator or qualified member of the plant technical staff.

b. With the RWM inoperable bef ore the first 12 control rods are withdrawn on a startup, one startup per calender year may be performed provided that control rod movement and compliance with the prescribed BPWS control rod pattern are verified by a second licensed operator or qualified member of the plc nt technical staf f.
c. With RWM inoperable on a shutdown, shutdown may continue provided that control rod movement and compliance with the prescribed BPWS control rod pattern are verified by a second licensed operator or qualified member of the plant technical staff. rcS e-f -
d. With RWM operable but individual control rod (s) declared inoperable, i operation and control rod movement below the power level of i the RWM may continue provided:
l. No more than three (3) control rods are declared inoperable in any one,BWS up, a , ggg
2. The inoperable control rod (s) is bypassed on the RWM and control I rod movement of the bypassed rod (s) is verified by a second licensed operator or qualified member of the plant technical staff.

,e. With RWM inoperable, the provisions of Specification 3.0.4 are not a ppli ca bl e . j

\

1

  • Entry into OPERATIONAL CONDITION 2 and withdrawal of selected control rods is permitted for the purpose of determining the OPERABILITY of the RWM prior to withdrawal of control rods f or the purpose of bringing the reactor to criticality.

l BRUNSWICK - UNIT 1 3/4 1-14 Amendment No. 144 l

TABLE 4.3.4-1 (Continued)

CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION

. SURVEILLANCE REOUIREMENTS NOTES (a) CHANNEL CALIBRATIONS are electronic.

(b) This calibration shall consist of the adjustment of the APRM flow biased setpoint to conform to a calibrated flow signal.

(c) Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to startup, if not performed within tha previous 7 days.

(d) When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDt? ION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> af ter entering OPERATIONAL CONDITION 2, if not performed within the previous 7 days. l (e) Placement of Reactor Mode Switch into Startup/ Hot Standby position is permitted for the purpose of performing the required surveillance prict to withdrawal of control rods for the purpose of bringing the reactor to criticality.

(f) Placement of Reactor Mode Switch into the Shutdown or Refuel position is permitted for the purpose of performing the required surveillance provided all control rods are fully inserted and the vessel head bolts are tensioned. ,

qs (g) When THERMAL POWER is greater than the preset power level of the RWMgand' RSG M t (h) With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.

(1) When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2, if not performed within the previous 92 days.

I 1

l l

1 BRUNSWICK - UNIT 1 3/4 3 52 Amendment No. 162 1

1 E

C Bi 5

gj TABLE 3.3.5.5-1

[z CONTROL ROOM EMERGENCY VENTILATION SYSTEM INSTRUMENTATION 4

~

REQUIRED NUMBER APPLICABLE OF DETECTORS OPERATIONAL ALARM / TRIP FUNCTION PER TRIP SYSTEM CONDITIONS ACTION SETPOINT CHLORINE ISOLATION:

1. a. Control Building Air Intake 4 (a) (b) 90 s 5 ppm (Local) Trip System y ,2 . Chlorine Tank Car Area (Remote) 4 (a) (b) 90 s 5 ppm Trip System h

RADIATION PROTECTION:

2 J< Control Building Air Intake 2 1, 2, 3, 4, 5, and 91 s 7mR/hr (d)

CONTROL ROOM ENVELOPE SM0KE PROTECTION:

.3 /. o, Zone 4 2 1, 2, 3, 4, 5, and 92 NA (c)

[ b Zone 5 2 1, 2, 3, 4, 5, and 92 NA (c)

( (a) Four OPERABLE detectors per trip system, consisting of two detectors per trip subsystem.

(b) With the chlorine tank car within the exclusion area.

z (c) During movement of irradiated fuel assemblies in the secondary containment.

O 1 (d) Allowable value of s 10mR/hr.

E

l TABLE 4.3.5.5-1 l CONTROL ROOM EMERGENCY VENTILATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CHANNEL FUNCTIONAL CHANNEL FUNCTION CHECK - TEST CALIBRATION CHLORINE ISOLATION:

1. O. Local Detection NA H A Trip System NA M A 2 h.RemoteDetection Trip System RADIATION PROTECTION:

j),l'7 Control Building D H R Air Intake CONTROL ROOM ENVELOPE SM0KE PROTECTION:

jf){ ct, Zone 4 NA 6 months (a)

JI b, Zone 5 NA 6 months (a)

(a) See Surveillance Requirement 4.7.2.d.2 BRUNSWICK - UNIT 1 3/4 3-64c Amendment No. 161

. ._. . _ _ . . ._ . . . _ . . ~ . _ . .

I

- - 1 INSTRUMENTATION 3/4.3.6 ATWS RECIRCULATION PUMP TRIP (RPT) SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION '

3.3.6.1 The ATWS-RPT system instrumentation trip systems shown in Table 3.3.6.1-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.6.1-2.

APPLICABILITY: OPERATIONAL CORDITION 1. f ACTION:

a. With an ATWS-RPT system instrumentation trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.6.1-2, declare the instrument channel inoperable until the channel is restored to OPERABLE status with its trip setpoint '

adjusted consistent with the Trip Setpoint value.

b. With the number of OPERABLE channels one less than required by the -

Minimum OPERABLE Channels per Trip System requirement for one or both '

trip systems, place the inoperable channel (s) in the tripped condition within one hour.

c. With the total number of OPERABLE channels less than 3 as required by  :

the Minimum OPERABLE Channels per Trip System requirement for one trip system and:

i

1. If the inoperable channels consist of one reactor vessel water- f

- level channel and one reactor vessel pressure channel, place '

both inoperable channels in the tripped condition within one hour.

2. If the inoperable channels include two reactor vessel water level channels or two reactor vessel pressure channels, declare the trip system inoperable. r
d. With one trip system inoperable, restore the inoperable trip system to OPERABLE status within 14 days or be in at least STARTUP within l the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. t
e. With both trip systems inoperable, restore at least one trip system to OPERABLE status within one hour or be in at least STARTUP within  !

the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.6.1.1 Each ATWS-RPT system instrumentatica channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, 'A and CHANNEL CALIBRATION operations at the frequencies shown in Tabl(e * ' '

4. 3. c . l - / ,

4.3.6,1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of 4

.11 channels shall be' performed at least once per 18 months and shall include calibration of time delay relays and timers necessary for proper functioning j of the trip system. ,

BRUNSWICK - UNIT 1 3/4 3-88 Amendment No. 1 30 ,

- , , - . . , - - v ,

REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY / RELIEF VALVES LIMITING CONDITION FOR OPERATION 3.4.2 The safety valve function of all reactor coolant system safety / relief -

valves shall be OPERABLE with lift settings within 1% of the following i values.j{} g,,

4 Safety-relief valves @ 1105 psig.  !

4 Safety-relief valves @ 1115 psig.

3 Safety-relief valves @ 1125 psig.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With the safety valve function of one safety / relief valve inoperable. l restore the inoperable safety valve function of the valve to OPERABLE status within 31 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b. With the safety valve function of two safety / relief valves  ;

inoperable, restore the inoperable safety valve function of at least i one of the valves to OPERABLE status within 7 days or be in at least i

HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c. With the safety valve function of more than two safety / relief valves inoperable, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD >

SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.2 The safety valve function of each of the above required safety / relief valves shall be demonstrated OPERABLE in accordance with the Surveillance l Requirements of Specification 4.0.5.

  • The lift setting pressure shall correspond to ambient conditions of the valves at normal operating temperature and pressure.

l 1

l l

BRUNSWICK - UNIT 1 3/4 4-4 Amendment No. 66 i

l

i ENCLOSURE 6 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENT ,

ADMINISTRATIVE CHANGES BRUNSWICK UNIT 2 PROPOSED TECHNICAL SPECIFICATION PAGES t

[

h e

i a

i 5

)

I

1 I 5. G '4 TABLE 2.2.1-1

$ N ,

E y REACTOR PROTECTION SYSTEM INSTRUMENTATION SETPOINTS K E ALLOWABLE TRIP SETPOINT VALUES

' FUNCTIONAL UNIT E Intermediate Range Monitor, Neutron Flux - liigb(a) 120 divisions of full scale $ 120 divisions G 1. of full scal'e u

2. Average Power Range Monitor s

Neutron Flux - High, 15%(b) $ 15% of RATED THERHAL POWER $ 15% of RATED

a. TilERMAL POWER Flow B'ased Simulated Thermal Power - < (0.66 W + 64%) with a ~< (0.66 W + 67%) with
b. a maximum $ _L15%-

High IC Idl -maximum $ 113.5% of RATED THERHAL POWER of HATED TilERHAL POWER 8

k Fixed Neutron Flux - High(d) $ 120% of RATED TiiERMAL POWER $ 120% of RATED

c. TIIERHAL POWER Reactor Vessel Steam Dome Pressure - liigh $ 1045 psig $ 1045 psig 3.

IE) I

4. Reactor Vessel Water Level - Low, Level 1 3 +162.5 inches 3 +162.5 incnes EI I $ 10% closed $ 10% closed
5. Main Steam Line Isolation Valve - Closure ")
6. Main Steam Line Radiation - liigh(h) $3x full power background $ 3.5 x full power g i

background N

m 1 2 psig $ 2 psig E 7. Drywell Pressure - liigh Scram Discharge Volume Water Level - High $ 109 gallons $ 109 gallons R 8.

  • $ 10% closed
9. Turbine Stop Valve-Closure (f) $ 10% closed b 10.TurbineControlValveFag) Closure, 3 500 phig 3 500 psig Control Oil Pressure-Low

a & P ,

2.2 LIMITING SAFETY SYSTEM SETTINGS BASES 2.2.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SETPOINTS The Reactor Protection System Instrumentation Setpoints specified in Table 2.2.1-1 are the values at which the Reactor Trips are set for each the reactor parameter. The Trip Setpoints have been selected to ensure that core and reactor coolant system are prevented from exceeding their safety limits.

1. Intermediate Range Monitor, Neutron Flux - High The IRM system consists of 8 chambers, 4 in each of the reactor trip systems.

The IRM is a 5-decade, 10-range instrument. The trip setpoint of 120 divisions is active in each of the 10 ranges. Thus, as the IRM is ranged is also up to accommodate the increase in power level, the trip setpoint ranged up. Range 10 allows the IRM instruments to remain on scale at higher power levels to provide for additional overlap and also permits calibratior at these higher powers.

The most significant source of reactivity change during the power increase is due to control rod withdrawal. In order to ensure that the IRM provides the required protection, a range of rod withdrawal accidents have been analyzed in Section 7.5 of the FSAR. The most severe case involves an initial condition in which the reactor is just suberitical and the IRMs are not yet on scale. Additional conservatism was taken in this analysis by assuming the IRM channel closest to the rod being withdrawn is bypassed. The results of this analysis show that the reactor is shut down and peak power is limited to 1% of RATED THERMAL POWER, thus maintaining MCPR above the Safety Limit MCPR of Specification 2.1.2. Based on this analysis, the IRM provides protection against local control rod errors and continuous withdrawal of control rods in sequence and provides backup protection for the APRM.

2. Average Power Range Monitor For operation at low pressure ar.d low flow during STARTUP, the APRM scram setting of 15% of RATED THERMAL POWER provides an adequate thermal This margin accommodates margin between the setpoint and the Safety Limits.

the anticipated maneuvers associated with power plant startup. Effects of increasing pressure at zero or low void content are minori cold water from sources available during startup is not much colder than that already in the system, temperature coefficiente are small, and control rod patterns are constrained by the .RSG#p' 81tWM. Of all the possible sources of reactivity input, uniform control rod withdrawai is the most probable cause of I significant power increase. Because involve the flux distribution associated with high local peaks and because several uniform rod withdrawals does not rods must be moved to change power by a significant amount, the rate of power rise is very slow. Generally, the heat flux is in near equilibrium with the fission rate. In an assumed uniform rod withdrawal approach to the trip level, the rate of power rise is not more than 5% of RATED THERMAL POWER per B 2-4 Amendment No.168 BRUNSWICK - UNIT 2

. ~ - -

s 1

1 l

LlHITING SAFETY SYSTEM SETTING l I

BASES (Continued) l I

l

7. Drywell Pressure-High j High pressure in the drywell could indicate a break in the nuclear ,

process systems. The reactor is tripped in order to minimize the possibility l of fuel damage and reduce the amount of energy being added to the coolant.

The trip setting was selected as low as possible without causing spurious trips.

8. Scram Discharge Volume Water Level-High The scram discharge tank receives the water displaced by the motion of 1 the control rod drive pistons during a reactor scram. Should this t ank fill l up to a point where there is insufficient volume to accept the displaced '

water, control rod movement would be hindered. The reactor is therefore tripped when the water level has reached a point high enough to indicate that it is indeed filling up, but the volume is still great enough to accommodate the water from the movement of the rods when they are tripped. -

l

9. Turbine Stop Valve-Closure 1

The turbine stop valve closure trip anticipates the pressure, neutron i flux, and heat flux increases that would result from closure of .the stop valves. With a trip setting of 10% of valve closure f rom full open, the resultant increase in heat flux is such that adequate thermal margins are j maintained even during the worst case transient that assumes the turbine l bypass valves renuin closed. This scram is bypassed when the turbine steam flow is below that corresponding to 30% of RATED THERMAL POWER, as measured by the turbine first-stage pressure.

l

10. Turbine control Valve Fast Closure, Control Oil Pressure - Low I

Low turbine control valve hydraulic pressure will initiate the Select Rod  !

Insert f unction and the preselected group of control rods will be fully inserted. Select Rod Insert is an operational aid designed to insert a  ;

predetermined group of control rods immediately following either a generator l load rejection, loss of turbine control valve hydraulic pressure, or by manual f )

operator action using a switch on the R-T-C board. The assignment of control J rods to the Select Rod Insert function is based on the start up and fuel .

warranty service associated with each control rod pattern, on JWAP- RK/4j l considerations, and on a dynamic function of both time and core patterns.

I Approximately ten percent of the control rods in the reactor will be assigned to the Select Rod Insert function by the operator._ This selection will be accomplished by moving the rod scram test switch for those rods from the Normal position to the Select Rod Insert position.

i BRUNWICK - UNIT 2 B 2-7 Ame ndme nt No. 171 i

, -o m .m

- ~ ~ -

l

LIMITING S AFETY SYSTEM SETTINGS BASES (Continued)

10. Turbine Control Valve Fast Closure. Control Oil Pressure - Low (Continued)

Any rod selected for Select Rodthe Ins shall also have other rods in its 6fWI RS S criteria 6fpKs-midus 06e n6tch) h group selected to ensure thatwhen(tiidro~d/patyern N/eate/ thvh 9% Rf/D DF/JSI_TJ)

(fo;/ttp6nAqugli/y)ismet It is possible that a rod Rod Insert function QaptT) THERMAL POWER (</2A%pf RATED THERMAL POW operates. g In order to reduce the number of reactor scrams, a 200 millisecond time delay, referenced from the low turbine control incorporated to valve hydraulic determine pressure turbine bypass and valve Select Rod Insert signals, was If the turbine status via limit switches prior to initiating the a reactor scrau.was bypassed.

reactor scram bypass valves opened in < 200 milliseconds,It was found that d; during ce with this time delay were more penalizing than the number of scrams save "0" in therefore, CP6L requested and received NRC approval to set Select Rod this and Insert timeRPS at trip "0",

Amendment No. 14. With the timer set at will be initiated simultaneously.

for The control valve closure time is approximately twice as long as that i ilar, are less the stop valves which means that resulting transients, while s m No l'uel. damage occurs, and reactor system severe than for stop valve closure.

pressure does not exceed the safety relief valve setpoint. This is an in reactor shutdown before any significant anticipatory scram and results This scram is bypassed when increase in pressure or neutron flux occurs. of RATED THERMAL l turbine steam flow is below that corresponding to 30 percent POWER, as measured by turbine first-stage pressure.

/

I l

Amendment No. 171 B 2-3 BRUNWICK - llNIT 2

. .~ .

. I

{

REACTIVITY CONTROL SYSTEMS 3/4 1.4 CONTROL ROD PROCRAM CONTROLS ROD WORTH HINIMIZER LIMITING CONDITION FOR OPERATION 3.1.4.1 The Rod Worth Minimizer (RWM) shall be OPERABLE when THERMAL POWER is less than 10% of RATED THERMAL POWER.

APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2*.

l ACTION:

a. With the RWM inoperable after the first 12 control rods have been  ;

f ully withdrawn on a startup, operation may continue provided that control rod movement and compliance with the prescribed BPWS control '

rod pattern are verified by a second licensed operator or qualified member of the plant technical staff.

b. With the RWH inoperable before the first 12 control rods are i wit hdrawn on a startup, one startup per calender year may be performed provided that control rod movement and compliance with the prescribed BPWS control rod pattern are verified by a second licensed operator or qualified member of the plant technical staf f.
c. With RWM inoperable on a shutdown, shutdown may continue provided that control rod movement and compliance with the prescribed BPWS .

control rod pattern are verified by a second licensed operator or qualified member of the plant technical staff.

d. With RWH operable but individual control rod (s) declared inoperable, operation and control rod movement below the preset power level of ,

the RWH may continue provided:

1. No more than three (3) control rods are declared inoperable in an'y one BWfr group, and, L_.J3Pvd_5
2. The inoperable control rod (s) is bypassed on the RWM and control rod movement of the bypassed rod (s) is verified by a second licensed operator or qualified member of the plant technical staff.
e. With RWH inoperable, the provisions of Specification 3.0.4 are not a ppli ca bl e.
  • Entry into OPERATIONAL CONDITION 2 and withdrawal of selected control rods is permitted for the purpose of determiniag the OPERABILITY of the RWM prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

BRUNSWICK - UNIT 2 3/4 1-14 Amendme nt No. 175 i

^ " ' ' " ' '

TABLE 4.3.1-1 (Continoed)

REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILIANCE REOUIREMENTS NOTES (a) Neutron detectors may be excluded from CHANNEL CALIBRATION.

(b) Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to startup, if not performed within the previous 7 days.

(c) The IRM channels shall be compared to the APRM channels and the SRM instruments for overlap during each startup, if not performed within the previous 7 days.

(d) When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2, if not performed within the previous 7 days. l (e) This calibration shall consist of the adjustment of the APRM readout to conform to the power values calculated by a heat balance during OPERATIONAL CONDITION 1 when THERMAL POWER greater than or equal to 25% of RATED THERMAL POWER.

(f) This calibration shall consist of the adjustment of the APRM flow-biased setpoint to conform to a calibrated flow signal.

(g) The LPRMs shall be calibrated at least once per effective full power month (EFPM) using the TIP system.

(h) This calibration shall consist of a physical inspection and actuation of these position switches.

(i) Instrument alignment using a standard current source.

(j ) Calibration using a standard radiation source.

(k) The transmitter channel check is satisfied by the trip unit channel check.

A saparate transmitter check is not required.

(1) Transmitters are exempted from the monthly channel calibration.

(m) Placement of Reactor Mode Switch into the Startup/ Hot Standby position is permitted for the purpose of performing the required surveillance prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

(n) Placement of Reactor Mode Switch into the Shutdown or Refuel position is permitted for the purpose of performing the required surveillance provided all control rods are fully inserted and the vessel head bolts are tensioned.

(o) Surveillance is not required when THERMAL POWER is less than 30% of RATED  ;

THERMAL POWER. l BRUNSWICK - UNIT 2 3/4 3-9 Amendment No. 193

TABLE 4.3.4-1 (Continued)

CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION

- SURVEILIANCE REOUTREMENTS NOTES (a) CRANNEL CALIBRATIONS are electronic.

(b) This calibration shall consist of the adjustment of the APRM flow biased setpoint to conform to a calibrated flow signal.

(c) Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to startup, if not performed within the previous 7 days.

(d) When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2,'if not performed within the previous 7 days. l (e) Placement of Reactor Mode Switch into Startup/ Hot Standby position is permitted for the purpose of performing the required surveillance prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

(f) Placement of Reactor Mode Switch into the Shutdown or Refuel position is permitted for the purpose of performing the required surveillance provided all control rods are fully inserted and the vessel head bolts are tensioned.

(g) When THERMAL POWER is greater than the preset power level of the Rk R6GG,A (h) With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.

(i) When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2, if not performed within the previous 92 days.

~

BRUNSWICK - UNIT 2 3/4 3-52 Amendment No. 193 l

5 E

E

TABLE 3.3.5.5-1 x

CONTROL ROOM EMERGENCY VENTILATION SYSTEM INSTRUMENTATION E

a '

" APPLICABLE REQUIRED NUMBER 0F DETECTORS OPERATIONAL ALARM / TRIP FUNCTION PER TRIP SYSTEM CONDITIONS ACTION SETPOINT CHLORINE ISOLATION:

1. a. Control Room Air Intake (Local) 4 (a) (b) 90 s 5 ppm y Trip System

, Jb. Chlorine Tank Car Area (Remote) 4 (a) (b) 90 s Sppm

) Trip System y RADIATION PROTECTION:

h 2,K Control Room Air Intake 2 1, 2, 3, 4, 5, and 91 s 7mR/hr (d)

(c)

CONTROL ROOM ENVELOPE SMOKE PROTECTION:

3 g o. Zone 4 2 1, 2, 3, 4, 5, and 92 NA (c) 2 b. Zone 5 2 1, 2, 3, 4, 5, and 92 NA (c)

F

& (a) Four OPERABLE detectors per trip system, consisting of two detectors per trip subsystem.

(b) With the chlorine tank car within the exclusion area.

5 (c) During movement of irradiated fuel assemblies in the secondary containment.

G (d) Allowable value of s 10mR/hr.

TABl.E 4.3.5.5-1 CONTROL ROOM EMERGENCY VENTILATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CHANNEL FUNCTIONAL CHANNEL FUNCTION CHECK TEST cal!BRATION CHLORINE ISOLATION:

1. a. Local Detection NA M A Trip System
b. Remote Detection NA M A Trip System RADIATION PROTECTION:

2,K Control Room Air D M R Intake CONTROL ROOM ENVELOPE SM0KE PROTECTION:

3g. a. Zone 4 NA 6 months (a)

[ b. Zone 5 NA 6 months (a)

(a) See Surveillance Requirement 4.7.2.d.2

)

1 4

i l

l l

BRUNSWICK - UNIT 2 3/4 3-64c Amendment No. 192 i

?

i INSTRUMENTATION END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION LIMITINC CONDITION FOR OPERATION 3.3.6.2 The end-of-cycle recirculation pump trip (EOC-RPT) system .

instrumentation channels shown in Table 3.3.6.2-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint '

column of Table 3.3.6.2-2 and with the END-OF-CYCLE RECIRCULATION PUMP TRIP -

SYSTEM RESPONSE TIME as shown in Table 3.3.6.2-3.

APPLICABILITY: OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or equal to 30% of RATED THERMAL POWE .*

a~A +L<. MC PR. I,', Hs s &,%ek {r,m ga C 6 LR Ar j ACTION: Mc. c A S p c,aQ%4 g, r, 2, , 4 g g , py.

a. With an end-of-cycle recirculation pump trip system instrumentation channel trip setpoint less conservative than the value shown in the ,

Allowable Values Column of Table 3.3.6.2-2, declare'the channel '

inoperable until the channel is restored to OPERABLE status with the  ;

channel setpoint adjusted consistent with the Trip Setpoint value.

b. With the number of OPERABLE channels one less than required by the

" Minimum OPERABLE Channels per Trip $ystem requirement for'one or both s trip systems, place the inoperable chanael(s) in the tripped  ;

condition within one hour.' ]

c. With the number of OPERABLE channels two or more less than required l by the Minimum OPERABLE Channels per Trip System requirement for one trip system and:
1. If the operable channels consist of one turbine control valve channel and one turbine stop valve channel, place both i inoperable channels in the tripped condition within one hour.

f

2. If the inoperable channels include two turbine control valve channels or two turbine stop valve channels, declare the trip '

system operable.

d. With one trip system inoperable, restore the inoperable trip system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or take the ACTION required by specification 3.2.3.-
e. With both trip systems inoperable, restore at least one trip system ,

to OPERABLE status within one hour or take the ACTION required by <

Specification 3.2.3.

- ., -. _M *

  • ingAhec rent c he e -

clefecirefatp4n p rp EOC RPT) s stem w'1,ycle opep tion, (ma all be ipoperabi sdd); tKerefore p .tficarton 3. .2 _ a bo#_e _does p1 The provist o j

./ opecification T'.0. are not applicable.

i BRUNSWICK - UNIT 2 3/4 3-93 Amendment No. 160 l

r s.

.. e

,? \

REACTIVITY CONTROL SYSTEM l

BASES CONTROL ROD PROCRAM CONTROLS (Continued) l l The RWH as a backup to procedural control provides an automatic control I rod pattern monitoring function to ensur'e adherence to the BPWS control movement sequences f rom 100% control rod density to 10% RATED THERHAL POWER and, thus, eliminates the postulated control rod drop accident from resulting in a peakfuelenthalpygreaterthan280 cal /gm(Reference /1.N._ - b The requirement that RWH be operable for the withdrawal of the first 12 l control rods on a startup is to ensure that the RWH system maintains a high

! degree of availability.

1 Deviation from the BPWS control rod pattern may be allowed f or the performance of Shutdown Margin Demonstration tests.

The analysis of the rod drop accident is presented in Section 15.4.6 of the Updated FSAR and the techniques of the analysis are presented in a topical l report (Reference 1) and two supplements (References 2 and 3).

l The RBH is designed to automatically prevent f uel damage in the event of erroneous rod withdrawal f rom locations of high power density during high power operation. The RBH is only required to be operable when the limiting condit ion described in Specification 3.1.4.3 exist s. Two channels are provided. Tripping one of the channels will block erroneous rod withdrawal l soon enough to prevent fuel danage. This system backs up the written sequence used by the operator f or withdrawal of control rods. Further discussion of

( the RBH system is provided in Reference 5.

1 3/4.1.5 STANDPY LIQUID CONTROL SYSTEM The standby liquid control system provides a eackup capability f or maintaining the reactor suberitical in the event that insufficient rods are inserted in the core when a scram is called for. The volume and weight percent of poison material in solution is based on being able to bring the reactor to the suberitical condition as the plant cools to ambient i

l condition. The temperature requirement is necessary to keep the sodium i I pentaborate in solution. Checking the volume and temperature once each 24 )

hours assures that the solution is available for use.

l With redundant pumps and a highly reliable control rod scram system, operation of the reactor is permitted to continue for short periods of time with the system inoperable or for longer periods of time with one of the redundant components inoperable. l Surveillance requirements are established on a frequency that assures a I high reliability of the system. Once the solution is established, boron I

concentration will not vary unless more boron or water is added, thus a check on the temperature and volume once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> assures that the solution is available for use.

reg Re pl ac that will assure ementhese t of the explosive valves will charges not in the valves atf ail because oration of ofdeter the [ular intervals charges.

l BRUNSWICK - UNIT 2 B 3/4 1-4 Amendment No. 175 l

I I i

- - - ~~ - , , , . - - - . -.. . . - - , .