ML20062K198

From kanterella
Jump to navigation Jump to search
Forwards Balance of Documents Discoverable Pursuant to 800918 Request for Production.Privileged Communications Not Included
ML20062K198
Person / Time
Site: Bailly
Issue date: 11/20/1980
From: Goldberg S
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Vollen R
VOLLEN, R.J. & WHICHER, J.M.
Shared Package
ML19221A733 List:
References
SECY-79-344, NUDOCS 8012020695
Download: ML20062K198 (3)


Text

__________________- __

.- 1 I

pa *Ec

+ UNITED STATES

[iy .c.

f [, . .. . g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C 20555

}#' E t,- -/e l  %.....

mAf November 20, 1980 Robert J. Vollen, Esq. - ,

'-/o BPI -

109 North Dearborn Street -

Chicago, Illinois 60602 .i In the Matter of -

NORTHERN INDIANA PUBLIC SERVICE COMPANY , .r (Bailly Generating Static 4 Nuclear-1) 'r -

Ee Docket No.$0-367 ') e ~,9 M

(Construction Permit Extension) Q p E

Dear Mr. Vollen:

Enclosed please find the balance of the documents discoverable pursuant to your September 18, 1980 request for the production of documents. These documents are identified in the attached listing. This completes the Staff response to the subject request. This response does not include three documents prepared by a member of the Staff solely to assist counsel in' the formulation of a Staff position on proposed contentions advanced in this litigation. These privileaed communications are precluded from dis-covery.

Sincerely, Cn A/U-Steven C. Goldberg Counsel for NRC Staff

Enclosures:

See attachment cc w/ enc.: William H. Eichhorn, Esq.

Docketing and Service Section cc w/o enc.: Herbert Grossman, Esq.

Dr. Richard F. Cole Mr. Glenn 0. Bright Kathleen H. Shea, Esq.

Edward W. Osann, Jr., Esq.

Robert L. Graham, Esq.

Georae and Anna Grabowski Dr. George Schultz Diane B. Cohn, Esq.

John Van Vranken, Esq.

Mr. Clifford Mezo Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Panel  !

8 012020 gy h

TABLE OF DOCUMENTS

1. Letter from 0. H. Hert, State of Indiana Stream Pollution Control Board, to H. P. Lyle, NIPSCO, dated February 14, 1977.
2. Letter from R. J. Bohn, NIPSCO, to G. Knighton, NRC, dated April 3, 1978.
3. Memorandum from H. R. Denton to NRC Commissioners (SECY-79-344),

dated May 19, 1979.

4 Letter from J. R. Whitehouse, National Park Service, to Nuclear

( Regulatory Commission Staff, dated October 1,1979.

5. Memorandum from L. G. Hulman, NRC, to R. L. Ballard, NRC, dated October 17, 1979.
6. Memorandum from L. G. Hulman to R. L. Ballard, dated November 6, 1979.
7. Letter from R. J. Ballard to J. R. Whitehouse, dated December 14, 1979.
8. Letter from R. J. Bohn to R. Ballard, dated December 27, 1979.
9. Memorandum from L. G. Hulman to R. L. Ballard, dated February 8, 1980.

T _

N [ STATE a l'NDIANA-64>M g o . . .

_ ,.[l(h b !!),-=

.x.)S j s INDIANAPOLIS 46206 1sso west stichigan sinet

' N <*.**,>, / sss4ast STREAM POLLUTION CONTROL BOARD February 14, 1977 lir. h. P. Lyle, Vice-President .u t .

Electric Production and Engineering  !?

1;orthern Indiana Public Service Company 5265 tiohman Avenue * ' 1 > j:; 7

{

baumond, Indiana 46325 ,

( .t - . . . v . I'.

Dear i4r. Lyle:

P,e: The Proposed isailey i;uclear Generating Station on January 14th, my staff met with representatives of IIIPSCO to oiscuss a Tais increased proposed additional discharge flow from the referenced facilit proposed nuclear facility.

and concrete around the main builcin3. excavation mini water seeaing in. It is proposed that an initial flow of 1,000 to 2,030 gallons per minute would be pumped througn an existing outfall of the fossil fuel Tne initial flow is expected to last approxiiaately two generating facility.

weeks at which time the flow should be reduced to an intermittent discharge of Tne total discharge from the fossil fuel facility is 4:20 gallons per minute.

expected to comply witii all effluent limitations in ilPDES permit I;o. II: 00Vul3 It is the determination of this agency tnat a modification of the i;PUE5 permit is not required and we offer no objections to this proposed project.

If there are any questions, please contact this offico.

Very truly yours, q' .

(Sy tp $4'*.L e Ural it. ::crt $ p G q r ~~,"; "}

Techaical Secretaty", ,3 MLEsarcy/rr ,,__  : =,, ;,,__:

n pg cc: Jaues iicsonald - Environmental Protection Agency 3 Josepn Stalismith '{gg(,h11;i2 l iici;g,6 L

i _ - - _ _ _