MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196K5541999-06-10010 June 1999 Forwards Request for Addl Info Re 10CFR50.46(A) Annual Rept. Note to File for TACs MA5336 & MA5337 Supercedes & Closes TACs MA1597,MA1598 & MA4426 ML20206S9241999-05-19019 May 1999 Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205J5931999-04-0707 April 1999 Informs of Court Cases Pending for California Energy Co in State of California ML20205J5971999-04-0707 April 1999 Forwards SER Accepting Util 980910 Proposal to NRC, Requesting Transfer of Indirect Control of Licenses DPR-29 & DPR-30 from Midamerican Energy Holding Co to Calenergy Co, Inc ML20198N9281998-12-30030 December 1998 Notification of 990115 Meeting with Ceco in Rockville, Maryland to Discuss Progress & Actions Being Taken by Quad Cities to Resolve Fire Protection (App R) Issues & to Address Latest IPEEE Risk Evaluations ML20196J8621998-12-0404 December 1998 Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event Interest ML20206F3461998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved IA-99-134, Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved1998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved ML20155H5301998-11-0505 November 1998 Notification of 981119 Meeting with Ceco in Rockville,Md to Discuss Progress & Actions Util Taking to Resolve Fire Protection (App R) Issues Since Last Public Meeting on 980910 ML20239A0881998-09-0202 September 1998 Notification of 980910 Meeting W/Util in Rockville,Md to Discuss Progress & Actions Quad Cities Taking to Resolve Fire Protection (App R) Issues Since Closure of CAL on 980522 ML20237E4261998-08-27027 August 1998 Notification of 980909 Meeting W/Calenergy Co,Midamerican Energy Co & Commonwealth Edison Co in Rockville,Md to Discuss Proposed Merger of Midamerican Energy Holdings Co & Calenergy Co,Inc & Requirements of 10CFR50.80 for Transfer ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236V5021998-07-30030 July 1998 Notification of 980819 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Inclusion of Emergency Core Cooling System Flow Measurement Uncertainties at Quad Cities Nuclear Power Station in loss-of-coolant Accident Analyses ML20249A5991998-06-15015 June 1998 Notification of 980619 Meeting W/Util in Rockville,Md to Discuss Reliance on Containment Overpressure at Quad Cities Np Station in Net Positive Suction Head Calculations for Core Spray & Low Pressure Coolant Injection Pumps ML20248A5991998-05-27027 May 1998 Notification of 980611 Meeting W/Util in Two White Flint North to Discuss Reliance on Containment Overpressure at Quad Cities Nuclear Power Station in Net Positive Suction Head Calculations for Core Spray ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20199E9941998-01-28028 January 1998 Forwards Rev of 980127 Notice of Significant Licensee Meeting W/Location of Meeting Added ML20199F0151998-01-27027 January 1998 Revised Notification of 980206 Meeting W/Location of Meeting Added,W/Ceco in Lisle,Illinois to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50 App R Issues & Scope & Type of Issues Requiring Review by NRC ML20199E0461998-01-27027 January 1998 Notification of Significant Licensee Meeting W/Util on 980206 to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50,App R Issues & to Discuss Scope & Type of Issues Requiring Review & Approval by NRC ML20198A6311997-12-30030 December 1997 Notification of Significant Licensee Meeting W/Util on 980109 in Lisle,Il to Discuss Apparent Violations & Other Issues Identified in NRC Inspection Repts 50-254/97-27 & 50-265/97-27 ML20212B4321997-10-22022 October 1997 Notification of Significant Licensee Meeting W/Util on 971105 in Lisle,Il to Discuss Apparent Violations Described in NRC Ltr to Lw Pearce, ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20236N3851997-09-0909 September 1997 Discusses TS Clarification at Quad Cities Re Interpretation of Application of Action 3 of TS 3/4.5.A,in Event High Pressure Cooling Injection Pump Made Inoperable for Surveillance Testing Concurrent W/Inoperable LPCI Pump ML20236N2881997-08-13013 August 1997 Informs of Completed Review of Plant TS 3/4.5.A, ECCS Operating, & Provides Comments Which Addresses Inoperable HPCI Sys,Per Region III 970718 Memo ML20151L7801997-08-0404 August 1997 Notification of 970820 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Comed Response for Quad Cities IPEEE Conceptual Engineering Designs for long-term Resolution for Safe Shutdown Enhancements ML20197B9141997-07-23023 July 1997 Forwards Safety Evaluation Re Concrete Expansion Anchor Safety Factors for High Energy Line Break Restraints,In Response to Region III 960920 Request ML20148D4741997-05-28028 May 1997 Notification of Meeting W/Ce on 970602 in Rockville,Md to Discuss Concerns Addressed in Re Actions That Should Be Considered by CE for Plant,Units 1 & 2,in Response to IPEEE Fire Analysis Results ML20141F4831997-05-19019 May 1997 Notifies of 970522 Meeting W/Util in Rockville,Md to Discuss NRC Recommendations Re Action Which Should Be Considered by Commonwealth Edison for Plant,Units 1 & 2 IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20137G5911997-03-13013 March 1997 Forwards Safety Evaluation Re Proposed TS Changes to Reflect Transition of Fuel Supplier from GE to Siemens Power Corp at Plants Unit 1 & 2 ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129K4501996-11-0707 November 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20217A1841996-11-0101 November 1996 Provides Annual Update of Status of Region III Response to Staff Actions Resulting from Diagnostic Evaluation at Quad Cities Nuclear Power Station ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196K5541999-06-10010 June 1999 Forwards Request for Addl Info Re 10CFR50.46(A) Annual Rept. Note to File for TACs MA5336 & MA5337 Supercedes & Closes TACs MA1597,MA1598 & MA4426 ML20206S9241999-05-19019 May 1999 Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205J5931999-04-0707 April 1999 Informs of Court Cases Pending for California Energy Co in State of California ML20205J5971999-04-0707 April 1999 Forwards SER Accepting Util 980910 Proposal to NRC, Requesting Transfer of Indirect Control of Licenses DPR-29 & DPR-30 from Midamerican Energy Holding Co to Calenergy Co, Inc ML20198N9281998-12-30030 December 1998 Notification of 990115 Meeting with Ceco in Rockville, Maryland to Discuss Progress & Actions Being Taken by Quad Cities to Resolve Fire Protection (App R) Issues & to Address Latest IPEEE Risk Evaluations ML20196J8621998-12-0404 December 1998 Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event Interest IA-99-134, Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved1998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved ML20206F3461998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved ML20155H5301998-11-0505 November 1998 Notification of 981119 Meeting with Ceco in Rockville,Md to Discuss Progress & Actions Util Taking to Resolve Fire Protection (App R) Issues Since Last Public Meeting on 980910 ML20239A0881998-09-0202 September 1998 Notification of 980910 Meeting W/Util in Rockville,Md to Discuss Progress & Actions Quad Cities Taking to Resolve Fire Protection (App R) Issues Since Closure of CAL on 980522 ML20237E4261998-08-27027 August 1998 Notification of 980909 Meeting W/Calenergy Co,Midamerican Energy Co & Commonwealth Edison Co in Rockville,Md to Discuss Proposed Merger of Midamerican Energy Holdings Co & Calenergy Co,Inc & Requirements of 10CFR50.80 for Transfer ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237A3611998-08-12012 August 1998 Staff Requirements Memo Re Briefing on Operating Reactors & Fuel Facilities on 980729 in Rockville,Maryland.Relative to Discussion About Quad-Cities,Commission Requested Addl Info on Schedule for Permanent Fire Protection Issues ML20236V5021998-07-30030 July 1998 Notification of 980819 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Inclusion of Emergency Core Cooling System Flow Measurement Uncertainties at Quad Cities Nuclear Power Station in loss-of-coolant Accident Analyses ML20249A5991998-06-15015 June 1998 Notification of 980619 Meeting W/Util in Rockville,Md to Discuss Reliance on Containment Overpressure at Quad Cities Np Station in Net Positive Suction Head Calculations for Core Spray & Low Pressure Coolant Injection Pumps ML20248A5991998-05-27027 May 1998 Notification of 980611 Meeting W/Util in Two White Flint North to Discuss Reliance on Containment Overpressure at Quad Cities Nuclear Power Station in Net Positive Suction Head Calculations for Core Spray ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20199E9941998-01-28028 January 1998 Forwards Rev of 980127 Notice of Significant Licensee Meeting W/Location of Meeting Added ML20199F0151998-01-27027 January 1998 Revised Notification of 980206 Meeting W/Location of Meeting Added,W/Ceco in Lisle,Illinois to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50 App R Issues & Scope & Type of Issues Requiring Review by NRC ML20199E0461998-01-27027 January 1998 Notification of Significant Licensee Meeting W/Util on 980206 to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50,App R Issues & to Discuss Scope & Type of Issues Requiring Review & Approval by NRC ML20198A6311997-12-30030 December 1997 Notification of Significant Licensee Meeting W/Util on 980109 in Lisle,Il to Discuss Apparent Violations & Other Issues Identified in NRC Inspection Repts 50-254/97-27 & 50-265/97-27 ML20212B4321997-10-22022 October 1997 Notification of Significant Licensee Meeting W/Util on 971105 in Lisle,Il to Discuss Apparent Violations Described in NRC Ltr to Lw Pearce, ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20236N3851997-09-0909 September 1997 Discusses TS Clarification at Quad Cities Re Interpretation of Application of Action 3 of TS 3/4.5.A,in Event High Pressure Cooling Injection Pump Made Inoperable for Surveillance Testing Concurrent W/Inoperable LPCI Pump ML20236N2881997-08-13013 August 1997 Informs of Completed Review of Plant TS 3/4.5.A, ECCS Operating, & Provides Comments Which Addresses Inoperable HPCI Sys,Per Region III 970718 Memo ML20151L7801997-08-0404 August 1997 Notification of 970820 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Comed Response for Quad Cities IPEEE Conceptual Engineering Designs for long-term Resolution for Safe Shutdown Enhancements ML20197B9141997-07-23023 July 1997 Forwards Safety Evaluation Re Concrete Expansion Anchor Safety Factors for High Energy Line Break Restraints,In Response to Region III 960920 Request ML20148D4741997-05-28028 May 1997 Notification of Meeting W/Ce on 970602 in Rockville,Md to Discuss Concerns Addressed in Re Actions That Should Be Considered by CE for Plant,Units 1 & 2,in Response to IPEEE Fire Analysis Results ML20141F4831997-05-19019 May 1997 Notifies of 970522 Meeting W/Util in Rockville,Md to Discuss NRC Recommendations Re Action Which Should Be Considered by Commonwealth Edison for Plant,Units 1 & 2 ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20137G5911997-03-13013 March 1997 Forwards Safety Evaluation Re Proposed TS Changes to Reflect Transition of Fuel Supplier from GE to Siemens Power Corp at Plants Unit 1 & 2 ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129K4501996-11-0707 November 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20217A1841996-11-0101 November 1996 Provides Annual Update of Status of Region III Response to Staff Actions Resulting from Diagnostic Evaluation at Quad Cities Nuclear Power Station ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl 1999-09-01
[Table view] |
Text
. -- -
7, 4 Dcono/4 JUL 2 81982 Docket Nos. 50-254 and 50-265 4
MEMORANDUM FOR: E. L. Jordan, Director, Division of Engineering and Quality Assurance, IE FROM: T. R. Novak, Assistant Director for Operating Reactors, DL i
SUBJECT:
Quad Cities Station Nuclear Power Station, Units 1 and 2
- Engineered Safety Features Reset Controls
, Task Interface Agreement ROI-80-15 assigned the responsibility to the Office of Nuclear Reactor Regulation for reviewing the licensees responses to I&E Bulletin 80-06. Our review of the Comonwealth Edison Company response to the bulletin for Quad Cities Units 1 and 2 are complete. The Technical Evaluation Report (TER) prepared by our contractor EG&G and our Safety Evaluation Report (SER) are enclosed.
! The licensee completed a drawing review in 1980 to identify components
, that would not remain in their energency mode following reset of the ESF actuation signal. The licensee concluded that no equipment diverts from i its energency mode when the actuation signals are reset. However, there are ten cases identified herein where systaa level manual resets may re-turn the equipment to its normal operating status.
The licensee committed to complete design modifications to the PCIS Groups I, II, and III. EG&G reviewed these modifications and reported them tech-_
nically satisfactory. I&E should confirm the successful installation an63 testing of these modifications.
i The licensee offered justifications in lieu of corrective modifications for the renaining nine cases. We find the justifications acceptable on the basis discussed in the Safety Evaluation Report.
With this SER, we conclude that the ESF reset controls for this nuclear plant comply with NRC criteria, subject to I&E confinnation as previously noted. .
gGM 8208050066 820728 DR ADOCK 05000 Thomas M. Novak, Assistant Director for Operating Reactors, DL
' ~
Distribution: CDocket File) NRC PDR [LPDR ORB #2 Reading J. Hel temes R. Bevan ' S. Norris i S. Miner T. Novak D. Vassallo
.s gv L k .0],. JY 9RB DU:dRB#2 M htiORB#4
[ik" f:RBevan #2
"'C'>
i "DVassH170" ' ' '" S'.'"M f HW 'v g82"-
sunuut > . 7./ /82- -7/yf /84-~ .. ~7/-../82" omy . . . . . . . . . . . . . . . . . ~~ .. .- - - ~ " " * * "
enc rosu m oo-o sacu am OFFICIAL RECORD COPY usom =-*Sa
SAFETY EVALUATION REPORT QUAD CITIES NUCLEAR POWER $TATION, UNITS 1 AND 2 LICENSEE RESPONSE TO'I&E BULLETIN BO-06, ENGINEERED SAFETY FEATURES TESF) RESET CONTROLS
~
INTRODUCTION Instances have been reported at operating nuclear power plants where it has been found that following the reset of an ESF actuated signal certain equipment, e.g., ventilation dampers, motors, and valves, would return to the normal mode, which could compromise the protective actions of the af-fected systems. As a result, on liarch 13, 1980, the flRC issued IAE Bulletin 80-06 requesting certain actions to be taken by licensees for all PWR and BWR facilities with operating licenses.
EVALUATION The enclosed report (EGG 1183-4212) was prepared for us by EGAG, Inc., San Ramon, California, as part of our technical assistance contractor program.
It provides their technical evaluation of the, licensee's response to I&E Bulletin 80-06 in accordance with NRC-provided guidance.
EG&G reported the licensee's conclusion that all safety-related equipment remains in its emergency mode upon reset of the ESF actuating signals.
However, there are ten cases where system level manual resets may return the equipment to its normal operating status. -
The licensee committed to complete design modifications to PCIS Groups I, II, and III.
EG&G reviewed these modifications and reported them technically satisfactory. I&E should confirm the successful instaTTation and testing e
of these modifications.
8208050080 820728 PDR ADOCK 05000254 P PDR}