ML20062A046
From kanterella
Jump to navigation
Jump to search
ML20062A046 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 05/10/1977 |
From: | Husain I, Obligado A DAIRYLAND POWER COOPERATIVE |
To: | |
Shared Package | |
ML20062A031 | List: |
References | |
TASK-03-06, TASK-05-04, TASK-3-6, TASK-5-4, TASK-RR NES-81A0091, NES-81A91, NUDOCS 7810100011 | |
Download: ML20062A046 (117) | |
Similar Documents at La Crosse | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20056E2631993-08-10010 August 1993
[Table view]LACBWR Containment Bldg Structural Analysis. W/One Oversize Drawing ML20056E2621993-07-31031 July 1993 Nonproprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve ML20235R0531987-09-30030 September 1987 Determination of Potential Radiological Consequences to Members of Public from Fuel Handling Accident at La Crosse Nuclear Facility ML20129H6271985-07-0808 July 1985 Addendum 1 to Rev 4 to Post-Accident Recovery Cost Study of Lacbwr ML20126L0871985-04-0909 April 1985 Rev 0 to Seismic Qualification of LACBWR Overhead Water Storage Tank for Sep ML20126L1221985-02-15015 February 1985 Seismic & Stress Analysis of HPCS Suction Line Piping Sys for Lacbwr ML20126L1181985-02-15015 February 1985 Seismic & Stress Analysis of HPCS Suction Line Piping Sys for Lacbwr ML20054K8631982-06-10010 June 1982 Potential Accident Consequence Assessment Atmospheric Dispersion Model Calculations ML20062D9421980-06-0404 June 1980 Sargent & Lundy Rept Project 6101-32 ML20062A5991978-09-26026 September 1978 Structural Analysis Rept for BWR Spent Fuel Pool Structure, Rept Presents Results of Nuclear Energy Svcs Analysis.Spent Fuel Storage Pool Design Adequate to Withstand Loadings Associated W/Normal Conditions ML20062A6081978-05-30030 May 1978 Thermal-Hydraulic Design Analysis Rept for BWR High Density Fuel Storage Racks, Presenting Nuclear Energy Svcs Test Results.Local Boiling Will Not Occur in Any Fuel Assembly W/Max Spent Fuel Storage Temp ML20062A0461977-05-10010 May 1977 Seismic & Stress Analysis of the LACBWR High Pressure Core Spray Discharge Line Piping Sys.Concludes That Combined Seismic,Dead Weight,Pressure & Thermal Expansion Stresses Would Satisfy ASME Copde W/Addl Seismic Restraints ML20062A0421976-07-0909 July 1976 Seismic & Stress Analysis of the LACBWR High Pressure Core Spray Suction Line Piping Sys.Concludes That Stresses from Seismic,Dead Weight,Pressure & Thermal Expansion Loadings Would Satisfy ASME Code W/Addition of Seismic Restraints ML20062A0511975-11-17017 November 1975 Seismic & Stress Analysis of LACBWR Recirculation Piping Sysconcludes That Stresses Due to Seismic,Deadweight, Pressure & Thermal Expansion Loadings,Combined IAW ASME Code Rules,Satisfy Code Design Reqmnts W/Addl Seismic Restraints ML20062A0371975-08-0101 August 1975 Seismic & Stress Analysis of LACBWR Main Steam Piping Sys. Concludes That Stresses from Seismic,Dead Weight,Pressure & Thermal Expansion Loadings,Combined IAW ASME Code Rules for Class 2 Components Satisfy the Code Design Requirements ML20062A0321975-06-18018 June 1975 Seismic & Stress Analysis of LACBWR Feedwater Piping Sys Concludes That Stresses from Seismic,Dead Weight Pressure & Thermal Expansion Loadings,Combined IAW ASME Code Rules for Class 2 Components Satisfy the Code Design Requirements 1993-08-10 Category:TEXT-SAFETY REPORT MONTHYEARML20210A6361999-04-30030 April 1999
[Table view]Rev 13 to Quality Assurance Program Description ML20206J3751999-04-29029 April 1999 Rev 13 to QA Program Description ML20207A9591999-01-31031 January 1999 Revised LACBWR Decommissioning Plan ML20196G0751998-12-31031 December 1998 1998 Annual Rept for Dairyland Power Cooperative ML20204D8371998-12-31031 December 1998 Annual Rept for 1998 - Rept of Changes,Tests & Experiments for Lacbwr. with ML20237E2701998-07-31031 July 1998 Rev 12 to QA Program Description ML20196A9241998-07-31031 July 1998 Rev 12 to LACBWR QA Program Description (Qapd) ML20202J0691998-01-31031 January 1998 Revised LACBWR Decommissioning Plan ML20202J0781998-01-31031 January 1998 Revised LACBWR Initial Site Characterization Survey for Safstor ML20203K0041997-12-31031 December 1997 Annual Operating Rept for 1997 - Rept of Changes,Tests & Experiments ML20249B7101997-12-31031 December 1997 Navigating for Our Future Dairyland Power 1997 Annual Rept. W/O Ltr ML20138B7771997-04-25025 April 1997 Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20137R7731997-04-11011 April 1997 Safety Evaluation Approving Changes to QAP Description ML20149K2071996-12-31031 December 1996 Conquering New Frontiers,Dairyland Power Cooperative 1996 Annual Rept ML20135C3901996-12-31031 December 1996 Annual Rept for 1996 - Rept of Changes,Tests & Experiments ML20132F8721996-10-31031 October 1996 Revised LACBWR Decommissioning Plan ML20134M2531996-02-20020 February 1996 Revised Rev 11 to QA Program Description ML18012A9001995-12-31031 December 1995 Annual Rept - 1995 of Changes,Tests & Experiments. W/ 960220 Ltr ML18011B1461995-04-20020 April 1995 LER 95-001-00:on 950417,noted That HPSW to Containment Building Isolated.Caused by Momentary LOP Due to Operational Test of 1A Edg.Procedures for Test Being Modified to Include Instructions to Verify Value Being open.W/950420 Ltr ML20056E2631993-08-10010 August 1993 LACBWR Containment Bldg Structural Analysis. W/One Oversize Drawing ML20056E2621993-07-31031 July 1993 Nonproprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve ML20127D3901993-01-13013 January 1993 SE Supporting Amend 67 to License DPR-45 ML20128K6011992-12-31031 December 1992 Corrected App a Re Std Format for Reporting Number of Personnel & man-rem by Work & Job Function,To Annual Rept for 1992 - Rept of Changes,Tests & Experiments ML20128D3421992-12-31031 December 1992 LACBWR Annual Rept 1992 ML20062B4761990-09-30030 September 1990 Monthly Operating Rept for Sept 1990 for LACBWR ML20248D0941989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for LACBWR ML20245G6571989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for LACBWR ML20245F9681989-06-30030 June 1989 Monthly Operating Rept for June 1989 for LACBWR ML20245J7351989-04-26026 April 1989 Safety Evaluation Supporting Amend 65 to License DPR-45 ML20245F8241989-02-28028 February 1989 Monthly Operating Rept for Feb 1989 for La Crosse Bwr.W/ ML20235S2441989-02-16016 February 1989 Suppl to 880104 Special Rept Re Inoperability of High Pressure Svc Water Diesel 1B.Fuel Supplu Sys Was Source of Problem.Fuel Supply Sys Will Be Replaced W/Above Ground Tanks for Both Diesels ML20245F7771989-01-31031 January 1989 Monthly Operating Rept for Jan 1989 for LACBWR ML20246H8771988-12-31031 December 1988 1988 Dairyland Power Cooperative Annual Rept ML20205T1271988-10-31031 October 1988 Monthly Operating Rept for Oct 1988 for La Crosse Bwr.W/ ML20151T0991988-08-0808 August 1988 Safety Evaluation Supporting Approval of Util Rev 10 to Emergency Plan ML20150D7051988-07-0808 July 1988 Safety Evaluation Supporting Rev 10 to Emergency Plan ML20155F9161988-05-31031 May 1988 Safety Evaluation Supporting Amend 62 to License DPR-45 ML20151G0591988-04-11011 April 1988 Safety Evaluation Supporting Amend 60 to Provisional License DPR-45 ML20148C3941988-03-15015 March 1988 Safety Evaluation Supporting Amend 59 to License DPR-45 ML20149G0711988-01-0404 January 1988 Safety Evaluation Supporting Amend 58 to License DPR-45 ML20147A9731987-12-31031 December 1987 Decommissioning Plan ML20149J3441987-12-31031 December 1987 LACBWR Annual Rept 1987 ML20195D7811987-12-31031 December 1987 1987 Dairyland Power Cooperative Annual Rept ML20237C6781987-11-30030 November 1987 Special Rept:On 871118,internal Portion of Fire Suppression Water Sys Removed from Svc to Replace Section of Piping.On 871120,piping Successfully Hydrostatically Tested & Fire Suppression Sys Returned to Svc ML20236W2731987-11-23023 November 1987 Special Rept:On 871028,following Initiation of 24 H Run for 18-month Diesel Generator Test,Emergency Diesel Generator 1B Stopped Running.No Cause for Trip Determined.Procedure Will Be Revised So Alarm Conditions Tested Before Run ML20236X0081987-11-18018 November 1987 Special Rept Re Inoperability of Fire Suppression Water Sys. Internal Portion of Sys Removed from Svc on 871118 to Replace Section of Piping.Initially Reported on 871118.Plant Permanently Shut Down & Reactor Defueled ML20234C3931987-10-20020 October 1987 Rev 5 to QA Program Description ML20151B2351987-10-20020 October 1987 Revised Rev 5 to QA Program Description ML20235R0531987-09-30030 September 1987 Determination of Potential Radiological Consequences to Members of Public from Fuel Handling Accident at La Crosse Nuclear Facility ML20235B5711987-09-15015 September 1987 Safety Evaluation Supporting Amend 57 to License DPR-45 1999-04-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20062A046&oldid=3556851"