Monthly Operating Rept for June 1982
ML20055A402
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/12/1982
From: Hill K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20055A399 List:
References
NUDOCS 8207160257
Download: ML20055A402 (7)


Text

-

OPERATING DATA REPORT DOCKET NO. 050-0331 DATE Julv 12.1982 COSIPLETED BY K mnal I - Hill TELEP!IONE 3L9-851-5611 OPERATING STATUS Duane Arnold Energy Center Notes

1. Unit Name:
2. Reporting Period: June 1982
3. Licensed Thermal Power (MWt): 16 %
  • 4. Nameplate Rating (Gross SIWE): M6 (Turbina Ratind '
5. Design Electrical Rating (Net SIWE): 538
6. Sf aximum Dependable Capacity (Gross Siwe): 545
7. Maximum Dependable Capacity (Net 51We): 515
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

. s

9. Power Level To which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Mom Yr..to-Date Cumulatise

11. 1; .a In Reporting Period 720 4,343.0_. 64,967.0
12. N amber Of liours kcactor Was Critical 46.5 3,141.3 46.620.0
13. Reactor Reserve Shutdown flours 0 0.0 '

O.0

14. Ilours Generator On.Line 44.4 3,078.5 '45,467.9
15. Unit Reserve Shutdown flours 0 0.0 0.0
16. Gross Thermal Energy Generated (SIWH) 52,084.8 4,117,853.2 57,171,251.2
17. Gross Electrical Energy Generated (MWII) 17.910.0__. 1.392.338.0 19.167.378.0 IS. Net Electrical Energy Generated (MWil) 16,579.8 1,310,008.1 17,941,593.4
19. Unit Service Factor 6.2 70.9 70.0
20. Ur.it Availability Factor 6.2 70.9 70.0
21. Unit Capacity Factor (U3ing MDC Net) 4.5 58.6 53.6
22. Unit Capacity Factor (Using DER Net) 4.3 56.1 51.3

! 23. Unit Forced Outage Rate 93.8 22.5 17.5

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachi:

Refueling, September 7, 1982, 8 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup: July M.1982
  • lurbine Ratin9: 565.7 MWe

. Generator Rating: 663.5 (MVA) x .90 (Power Factor) = 597 MWe 8207160257 820712 (4/771 PDR ADOCK 05000331 R PDR

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0331 vuane Arnoia UNIT Fnorgv Center DATE July 12, 1982 4 COMPLETED BY TELEPilONE 319-851-5611

~~ ~

MONDI June 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL -

(MWe Net) (MWe-Net) i 431 37 0 2 315 18 0 3 0 19 0 4 -

0 o 0 0 0 5 21 6 __.- 0 22 0 7 0 23 0 0 0 8 24 9 0 25 0 10 0 26 0 Il n 27 0 12 0 28 0 13 0 29 0 0 0 '

14 ~ 30 15 0 33 16 0 INSTRUCTIONS On this format, list the aserage daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) ,

O

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0331 ,

UNIT NAME Duane-Arnold Energy"Cente7 DATE July 12. 19R2 COMPLETED BY Kimup1 1 Hill REPORT MONTil June, 1982 TELEPIIONE 319-851-5611

e. <

-_ E c No. Date Q

.{ g 3g 3

d 4Y5

.3 s $

Licensee Event

,E-to gg K Cause & Corrective Action to pO H 5 Report a mV f jig 3 Prevent Recurrence

. 6 9 820602 F 675.6 A 1 82-034 CD C Procedure violation on MSIV opening sequence resulted in pressure tran--

sient that cracked two hydraulic speed co.ntrol cylinders. Plant procedures and operating instructions to be reviewed and revised as necessa ry. A program will also be established for additional operator training.

I 2 3 4 ,

F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-  :

D. Regulatory Restriction 4-Other ( Explain) 0161)

E-Operator Training & License Examination F Administratise 5

' G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) Il-Other (Explain)

(

(

Unit Duane Arnold Energy Center {

Date July 12. 1982  %

RETUELING INFORMATION Completed by Kimuel L. Hill /

~

Telephone _319-851-5611 ,

Name of facility.

1.

h A. Duane Arnold Energy Center *

2. Scheduled date for next refueling shutdown. -

A. September 7, 1982 4

3. Scheduled date for restart following refueling.

A. Unknown

]

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

4 A. Yes. New MAPLHGR tables will have to be included in Technical Specifications.

1

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

A. Unknown at this time.

6. Important licensing considerations associated with lefueling, e.g.,

new or different fuel design or supplier, unreviewed design or per-formance analysis methods, significant changes in fuel design, new operating procedures.

A. New fuel assemblies to be placed in the reactor will be more highly enriched

  • than those currently in use~.
7. The number of fuel assemblics (a) in the core and (b) in the spent i fuel storage pool. -

i A. a) 368 b) 448 l D. The present licensed spent fuel pool storage c.apacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

A. 2050

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

A. 1998 0

1 * . .

4 i

Docket No. 050-0331 Unit Duane Arnoldd Energy Center

,_ Date _ July 12, 1982 Completed by _Kimuel L. Hill .

j Telephone 319-851-5611 i

j NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE 6-1 Normal plant operation at 431 MWe.

6-2 During normal operation surveillance testing, MSIV position switch ZS 4415 did not provide a closure signal to the RPS within the Technical Specification limit of < 10% closure.

R0 Report 82-34 6-3 MSIV inspection revealed broken cap screws on the speed control manifold assembly for CV 4415 and cracked speed control hydraulic cylinders on CV 4415 and CV 4412.

R0 Report 82-34 _

6-5 Reactor in cold shutdown.

i 6-7 During cold shutdown surveillance testing drywell to torus vacuum breaker CV-4327D was opened and failed to close completely.

i f

R0 Report 82-38 During cold shutdown surveillance testing. RCIC steam line high flow pressure differential indicating switches PDIS 2441 and pDIS 2442 tripped at a setpoint outside the range of Technical Specifications.

R0 Report 82-35 i

i 6-10 During cold shutdown surveillance testing, standby diesel generator 1G-21 l failed to start using the normal air start solenoid.

i R0 Report 82-39 i'

During cold shutdown surveillance testing a leak was noticed in the jacket I cooling system for standby diesel generator IG-21.

R0 Report 82-40 6-16 During cold shutdown surveillance testing electricians discovered manual heater for the "A" standby gas treatment system open.

R0 Report 82-42 6-20 t Repair and leak rate testing of MSIVs undemay.

6-21 During cold shutdown, the NRC Resident Inspector found isolation valve, V-18-07, for SDV level scram switch, LS-1861A, to be open' as required, but not properly locked open.

R0 Report 82-41 l

Docket flo. 050-0331 Unit Duane Arnold Energy Center

. Date July 12, 1962-~

Completed by Kimuel L. Hill Telephone 319-851-5611 f!ARRATIVE

SUMMARY

OF OPERATIfiG EXPERIEi!CE 6-24 During cold shutdown surveillance testing reactor building to suppression chamber pressure differential switches PDS 4304 and PDS 4305 tripped at a value outside Technical Specification limits .

R0 Report Pending 6-29 During cold shutdown surveillance testing the "B" standby filter unit would not control its discharge value or clear its low flow alram.

R0 Report Pending 6-30 Reactor in cold shutdown.

m, wm Unit Duane Arnold Enc py contet

. Date July 12, 1982 MAJOR SAFETY RELATED MAINTENANCE Completed by Kimuel LCHiQ,

. Telephone 319-851-5611 DATE SYSTEM COMPONENT DESCRIPTION 6-10-82 Standby Diesel Generator Pipe nipple to PI 3265B 1G-21 Broken pipe nipple replaced and piping shortened.

6-12-82 Standby Diesel Generators Air start solenoid valves 1G-21, 1G-31 Solenoid val 0es cleaned and lubed.

6-18-82 Containment Atmosphere Drywell radiation monitor IC-219A Flow indicator replaced.

Dilution ,

6-23-82 Intake Structure Air compressor 1K168 -

New bearing installed in motor.

6-25-82 Containment Atmosphere Drywell to torus vacuum breaker CV-43270 Dilution Actuator rebuilt.

e b

I f

1 e

e g #I .r d .

- * '~'

i