ML20054J230
From kanterella
Jump to navigation
Jump to search
ML20054J230 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 03/27/1981 |
From: | Travers W Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20054J221 | List: |
References | |
FOIA-82-231 NUDOCS 8206280321 | |
Download: ML20054J230 (2) | |
Similar Documents at Three Mile Island | |
---|---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20211F5761999-08-26026 August 1999
[Table view]Summary of 990813 Meeting with Licensee in Rockville,Md to Discuss Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issue.List of Attendees & Meeting Handouts Encl ML20210L6541999-08-0404 August 1999 Summary of 990713 Meeting with Util in Rockville,Md Re Licensee Proposed Mods to Reactor Building Spray Sys Operation & Hpis.List of Attendees Encl ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20207B6441999-05-26026 May 1999 Summary of 990507 Meeting with Gpu Nuclear,Inc in Rockville, MD Re Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issues.List of Attendees & Copy of Licensee Handout Used at Meeting Encl ML20154F4771998-10-0505 October 1998 Summary of 980917 Meeting W/Gpu Nuclear Inc,Amergen & NRC in Rockville,Md Re Sale & License Transfer of Three Mile Island Nuclear Genrating Station,Unit 1.List of Attendees,Copy of Licensee Handout & Copy of Meeting Transcript Encl ML20236F6671998-06-30030 June 1998 Summary of 980527 Meeting W/Util Re Control Room Habitability Evaluation Related to Control Room Operator Thyroid Dose from Fission Product Releases During Postulated Design Basis Accident at Plant Unit 1 ML20249A0561998-06-10010 June 1998 Summary of 980604 Meeting W/Gpu in TMI-1 Training Center to Discuss Status of Active & Recently Completed TMI-1 Licensing Issues ML20199J7061998-02-0202 February 1998 Summary of 971212 Meeting W/Gpu Re Control Room Habitability Evaluation Concerning CR Operator Thyroid Dose from Fission Product Release During Postulated Design Basis Accident at Plant ML20211A0161997-09-16016 September 1997 Summary of 970828 Meeting W/B&Wog Re Mgt of Aging Effects for Reactor Vessel Internals & Activities Related to Baffle Bolting Integrity Issues.List of Attendees & Their Affiliation & Handouts Encl ML20217M7601997-08-21021 August 1997 Summary of 970725 Meeting W/Gpu in Rockville,Md to Discuss Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage ML20151L8201997-08-0404 August 1997 Summary of 970715 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage.List of Attendees & Handouts Encl ML20148D8531997-05-28028 May 1997 Summary of 970502 Meeting W/Util to Discuss Status of Implementation Schedule for Completion of Installation of Thermo-lag at Plants.List of Attendees Encl ML20138H5581996-12-19019 December 1996 Summary of 961126 Meeting W/Util in Rockville,Md to Discuss Two Major Issues Related to SG Tube Integrity at Facility. W/List of Attendees & Viewgraphs ML20150A2351996-02-15015 February 1996 Summary of 960205 Meeting W/Gpu at TMI-1 Site to Discuss Active & Recently Completed TMI-1 Licensing Issues.List of Participants & Copy of Handouts Encl ML20149F4911994-08-0303 August 1994 Summary of 940712 Meeting W/Util at NRC Office in Rockville,Md to Discuss Results of Control Rod Drop Testing & Subsequent Control Rod Drive Mechanism Testing During Week of 940601 ML20059J3351994-01-25025 January 1994 Notification of 940202 Meeting W/R Gary in Rockville,Md to Discuss 2.206 Petition to Shut Down TMI Unit 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062A6511990-10-0505 October 1990 Summary of 900913 Meeting W/Util in Middletown,Pa,Re Current Licensing Issues & Insp Open Items ML20055E3181990-07-0505 July 1990 Summary of 900607 Meeting W/Gpu at TMI Site Near Middletown,Pa Re Current Licensing Issues.Attendance List Encl ML20246C3331989-06-29029 June 1989 Summary of 890614 Meeting W/Util & Commonwealth of PA in Middletown,Pa Re Status & Future Actions of All Active Licensing Issues.List of Attendees & generic/multi-plant Actions Encl ML20247K5841989-05-24024 May 1989 Summary of 890512 Meeting W/Util at Site Re Status & Future Actions of Active Licensing Issues.List of Attendees & Activities Discussed Encl ML20246F4541989-05-0202 May 1989 Summary of 890410 Meeting W/Util in Middletown,Pa Re Status & Future Actions of All Active Licensing Issues.Tmi Action Items II.K.3.31 & I.C.1 Completed Since Last Monthly Meeting & Closeout Ltrs Sent to Util on 890328 ML20235W0041989-03-0101 March 1989 Summary of 890222 Meeting Between NMSS & NRR Project Manager Re Status of Cleanup & H Thompson Concern That NRR Set Cleanup Criteria That Could Cause Problem for NRC Later on ML20235Y4221989-02-27027 February 1989 Summary of 890215 Meeting W/Util in Rockville,Md Re ATWS Implementation.List of Attendees & post-meeting Questions Encl ML20235M7051989-02-16016 February 1989 Summary of 890208 Meeting W/Bechtel & Util Re Portrayal of Bechtel & Util Auditing of Nuclear Energy Svcs in Info Notice 88-035, Inadequate Licensee Performed Vendor Audits. List of Attendees Encl ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20207E2961988-07-28028 July 1988 Summary of 880714 Meeting W/B&W Owners Group Re Industry & NRC Actions to Resolve Issues Raised in Generic Ltr 87-12. List of Attendees,Viewgraphs & B&W Design Differences Encl ML20148S3821988-03-31031 March 1988 Summary of Operating Reactors Events Meeting 88-13 on 880329.List of Attendees,Discussion of Events & Summary of Reactor Scrams Encl ML20147J1081988-02-26026 February 1988 Summary of 880218 Meeting W/Gpu in Rockville,Md to Discuss Matters Pertaining to 7R Refueling Outage Planned to Commence on 880617.Attendance List & Viewgraphs Encl ML20238A9911987-08-27027 August 1987 Summary of 870824 Meeting W/Util in Bethesda,Md Re 870728 Proposed License Amend,Revising Radiological Effluents Tech Specs ML20237K6461987-08-0606 August 1987 Summary of 870619 Meeting W/Util in King of Prussia,Pa Re Changes to Util Emergency Plan for Plants Based on Changing Plant Status & Reclassification to Post Defueling Monitored Storage ML20214W9971987-06-10010 June 1987 Summary of 870521 Meeting W/Util in Bethesda,Md Re Results from Recent Tests of Steam Generator Tubes in TMI-1.Util Plans to Request Review of Proposed Change in Tube Plugging Criteria.Attendance List & Util Presentation Encl ML20215D0521986-12-0505 December 1986 Summary of 861113 Meeting W/Util & Gilbert Commonwealth,Inc at Site Re Status of Review Effort for App R Submittal.List of Attendees,Meeting Agenda & Licensee Handout Re Emergency Lighting Exemption Request Encl ML20207B0711986-10-30030 October 1986 Summary of 861027 Meeting W/Util & Eg&G Idaho Re Discussion of Selected Issues from Second 10-yr Interval Inservice Test Program Recently Approved by NRC .List of Attendees & Meeting Agenda Encl ML20210V1091986-09-30030 September 1986 Summary of 860916 Meeting W/Util & B&W Re Cycle 6 Reload Rept & Technical Approach Utilized by B&W & Util to Identify Problem Areas in Rept.List of Attendees & Meeting Handout Encl ML20210U0521986-09-30030 September 1986 Summary of 860922 Meeting W/Util Re once-through Steam Generator Tubes to Be Pulled During Cycle 6 Outage.Util Handouts & List of Attendees Encl ML20214L1851986-08-26026 August 1986 Summary of 860822 Meeting W/Util in Bethesda,Md to Discuss Deferral of Electrical Cable Tray & Conduit Support Mods Per App R.List of Attendees Encl ML20212J9241986-07-29029 July 1986 Summary of 860721 Meeting W/Util at Plant Site Re Mods to Fuel Handling Bldg Ventilation Sys.List Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206B7861986-05-20020 May 1986 Summary of B&W Counterpart 860506-08 Meetings W/Resident Inspectors Re B&W Events,Problems & Reassessment Program. Senior Resident Inspector Comments Encl ML20155K1151986-05-19019 May 1986 Summary of 860515 Meeting W/Util in Bethesda,Md Re Steam Generator Repair Criteria as Described in Licensee Tech Spec Change Request 148.List of Attendees & Licensee Presentation Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20203E8051986-04-18018 April 1986 Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20205J7411986-02-28028 February 1986 Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20141N3971986-02-24024 February 1986 Summary of Operating Reactors Events Meeting 86-03 on 860127.Attendees,events Discussed,Significant Elements of Events & Assignments Made Listed in Encls ML20154H5941986-02-15015 February 1986 Summary of ACRS Subcommittee on Core Performance 860129 Meeting W/Util & NRC in Washington,Dc to Review Potential for Recriticality at TMI-2 During Defueling Operations. Viewgraphs Encl 1999-08-04 Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT) MONTHYEARML20211F5761999-08-26026 August 1999
[Table view]Summary of 990813 Meeting with Licensee in Rockville,Md to Discuss Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issue.List of Attendees & Meeting Handouts Encl ML20210L6541999-08-0404 August 1999 Summary of 990713 Meeting with Util in Rockville,Md Re Licensee Proposed Mods to Reactor Building Spray Sys Operation & Hpis.List of Attendees Encl ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20207B6441999-05-26026 May 1999 Summary of 990507 Meeting with Gpu Nuclear,Inc in Rockville, MD Re Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issues.List of Attendees & Copy of Licensee Handout Used at Meeting Encl ML20154F4771998-10-0505 October 1998 Summary of 980917 Meeting W/Gpu Nuclear Inc,Amergen & NRC in Rockville,Md Re Sale & License Transfer of Three Mile Island Nuclear Genrating Station,Unit 1.List of Attendees,Copy of Licensee Handout & Copy of Meeting Transcript Encl ML20236F6671998-06-30030 June 1998 Summary of 980527 Meeting W/Util Re Control Room Habitability Evaluation Related to Control Room Operator Thyroid Dose from Fission Product Releases During Postulated Design Basis Accident at Plant Unit 1 ML20249A0561998-06-10010 June 1998 Summary of 980604 Meeting W/Gpu in TMI-1 Training Center to Discuss Status of Active & Recently Completed TMI-1 Licensing Issues ML20199J7061998-02-0202 February 1998 Summary of 971212 Meeting W/Gpu Re Control Room Habitability Evaluation Concerning CR Operator Thyroid Dose from Fission Product Release During Postulated Design Basis Accident at Plant ML20211A0161997-09-16016 September 1997 Summary of 970828 Meeting W/B&Wog Re Mgt of Aging Effects for Reactor Vessel Internals & Activities Related to Baffle Bolting Integrity Issues.List of Attendees & Their Affiliation & Handouts Encl ML20217M7601997-08-21021 August 1997 Summary of 970725 Meeting W/Gpu in Rockville,Md to Discuss Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage ML20151L8201997-08-0404 August 1997 Summary of 970715 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage.List of Attendees & Handouts Encl ML20148D8531997-05-28028 May 1997 Summary of 970502 Meeting W/Util to Discuss Status of Implementation Schedule for Completion of Installation of Thermo-lag at Plants.List of Attendees Encl ML20138H5581996-12-19019 December 1996 Summary of 961126 Meeting W/Util in Rockville,Md to Discuss Two Major Issues Related to SG Tube Integrity at Facility. W/List of Attendees & Viewgraphs ML20150A2351996-02-15015 February 1996 Summary of 960205 Meeting W/Gpu at TMI-1 Site to Discuss Active & Recently Completed TMI-1 Licensing Issues.List of Participants & Copy of Handouts Encl ML20149F4911994-08-0303 August 1994 Summary of 940712 Meeting W/Util at NRC Office in Rockville,Md to Discuss Results of Control Rod Drop Testing & Subsequent Control Rod Drive Mechanism Testing During Week of 940601 ML20059J3351994-01-25025 January 1994 Notification of 940202 Meeting W/R Gary in Rockville,Md to Discuss 2.206 Petition to Shut Down TMI Unit 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062A6511990-10-0505 October 1990 Summary of 900913 Meeting W/Util in Middletown,Pa,Re Current Licensing Issues & Insp Open Items ML20055E3181990-07-0505 July 1990 Summary of 900607 Meeting W/Gpu at TMI Site Near Middletown,Pa Re Current Licensing Issues.Attendance List Encl ML20246C3331989-06-29029 June 1989 Summary of 890614 Meeting W/Util & Commonwealth of PA in Middletown,Pa Re Status & Future Actions of All Active Licensing Issues.List of Attendees & generic/multi-plant Actions Encl ML20247K5841989-05-24024 May 1989 Summary of 890512 Meeting W/Util at Site Re Status & Future Actions of Active Licensing Issues.List of Attendees & Activities Discussed Encl ML20246F4541989-05-0202 May 1989 Summary of 890410 Meeting W/Util in Middletown,Pa Re Status & Future Actions of All Active Licensing Issues.Tmi Action Items II.K.3.31 & I.C.1 Completed Since Last Monthly Meeting & Closeout Ltrs Sent to Util on 890328 ML20235W0041989-03-0101 March 1989 Summary of 890222 Meeting Between NMSS & NRR Project Manager Re Status of Cleanup & H Thompson Concern That NRR Set Cleanup Criteria That Could Cause Problem for NRC Later on ML20235Y4221989-02-27027 February 1989 Summary of 890215 Meeting W/Util in Rockville,Md Re ATWS Implementation.List of Attendees & post-meeting Questions Encl ML20235M7051989-02-16016 February 1989 Summary of 890208 Meeting W/Bechtel & Util Re Portrayal of Bechtel & Util Auditing of Nuclear Energy Svcs in Info Notice 88-035, Inadequate Licensee Performed Vendor Audits. List of Attendees Encl ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20207E2961988-07-28028 July 1988 Summary of 880714 Meeting W/B&W Owners Group Re Industry & NRC Actions to Resolve Issues Raised in Generic Ltr 87-12. List of Attendees,Viewgraphs & B&W Design Differences Encl ML20148S3821988-03-31031 March 1988 Summary of Operating Reactors Events Meeting 88-13 on 880329.List of Attendees,Discussion of Events & Summary of Reactor Scrams Encl ML20147J1081988-02-26026 February 1988 Summary of 880218 Meeting W/Gpu in Rockville,Md to Discuss Matters Pertaining to 7R Refueling Outage Planned to Commence on 880617.Attendance List & Viewgraphs Encl ML20238A9911987-08-27027 August 1987 Summary of 870824 Meeting W/Util in Bethesda,Md Re 870728 Proposed License Amend,Revising Radiological Effluents Tech Specs ML20237K6461987-08-0606 August 1987 Summary of 870619 Meeting W/Util in King of Prussia,Pa Re Changes to Util Emergency Plan for Plants Based on Changing Plant Status & Reclassification to Post Defueling Monitored Storage ML20214W9971987-06-10010 June 1987 Summary of 870521 Meeting W/Util in Bethesda,Md Re Results from Recent Tests of Steam Generator Tubes in TMI-1.Util Plans to Request Review of Proposed Change in Tube Plugging Criteria.Attendance List & Util Presentation Encl ML20215D0521986-12-0505 December 1986 Summary of 861113 Meeting W/Util & Gilbert Commonwealth,Inc at Site Re Status of Review Effort for App R Submittal.List of Attendees,Meeting Agenda & Licensee Handout Re Emergency Lighting Exemption Request Encl ML20207B0711986-10-30030 October 1986 Summary of 861027 Meeting W/Util & Eg&G Idaho Re Discussion of Selected Issues from Second 10-yr Interval Inservice Test Program Recently Approved by NRC .List of Attendees & Meeting Agenda Encl ML20210V1091986-09-30030 September 1986 Summary of 860916 Meeting W/Util & B&W Re Cycle 6 Reload Rept & Technical Approach Utilized by B&W & Util to Identify Problem Areas in Rept.List of Attendees & Meeting Handout Encl ML20210U0521986-09-30030 September 1986 Summary of 860922 Meeting W/Util Re once-through Steam Generator Tubes to Be Pulled During Cycle 6 Outage.Util Handouts & List of Attendees Encl ML20214L1851986-08-26026 August 1986 Summary of 860822 Meeting W/Util in Bethesda,Md to Discuss Deferral of Electrical Cable Tray & Conduit Support Mods Per App R.List of Attendees Encl ML20212J9241986-07-29029 July 1986 Summary of 860721 Meeting W/Util at Plant Site Re Mods to Fuel Handling Bldg Ventilation Sys.List Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206B7861986-05-20020 May 1986 Summary of B&W Counterpart 860506-08 Meetings W/Resident Inspectors Re B&W Events,Problems & Reassessment Program. Senior Resident Inspector Comments Encl ML20155K1151986-05-19019 May 1986 Summary of 860515 Meeting W/Util in Bethesda,Md Re Steam Generator Repair Criteria as Described in Licensee Tech Spec Change Request 148.List of Attendees & Licensee Presentation Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20203E8051986-04-18018 April 1986 Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20205J7411986-02-28028 February 1986 Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20141N3971986-02-24024 February 1986 Summary of Operating Reactors Events Meeting 86-03 on 860127.Attendees,events Discussed,Significant Elements of Events & Assignments Made Listed in Encls ML20154H5941986-02-15015 February 1986 Summary of ACRS Subcommittee on Core Performance 860129 Meeting W/Util & NRC in Washington,Dc to Review Potential for Recriticality at TMI-2 During Defueling Operations. Viewgraphs Encl 1999-08-04 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20054J230&oldid=3640641"