ML20150A235

From kanterella
Jump to navigation Jump to search
Summary of 960205 Meeting W/Gpu at TMI-1 Site to Discuss Active & Recently Completed TMI-1 Licensing Issues.List of Participants & Copy of Handouts Encl
ML20150A235
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/15/1996
From: Hernan R
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9602220089
Download: ML20150A235 (14)


Text

  • l co-zS1 i 8

,9 **%

p -+4 UNITED STATES j

g NUCLEAR REGULATORY COMMISSION g & WASHINGTON, D.C. 30seH001

% ,, + February 15, 1996 LICENSEE: GPU Nuclear Corporation FACILITY: Three Mile Island Nuclear Station, Unit 1 (TMI-1)

SUBJECT:

SulMARY OF FEBRUARY 5, 1996, MEETING WITH GPU NUCLEAR CORPORATION REGARDING ACTIVE LICENSING ISSUES AT THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1)

On Monday, February 5,1996, a public meeting was held between the U.S.

Nuclear Regulatory Commission (NRC) and GPU Nuclear Corporation (GPUN) at the TMI-l site. The purpose of the meeting was to discuss active and recently completed TMI-I licensing issues. Attachment 1 is the list of participants at the meeting. Attachment 2 is a copy of the handouts used during the meeting.

Changes since the November 15, 1995, meeting:

Comoleted staff action:

+

TSCR No. 250 - Revision to scurce range instrument surveillance frequency - Closed out.

License Amendment 199 issued on 11/28/95.

  • TSCR No. 244 - Revision to control rod drop time limit in TS - Closed 91 Amendment no longer required because of CRDM refurbishment during IIR Outage. Staff issued a withdrawal letter and Federal Reaister Notice on 11/30/95.

+

The staff issued a denial letter in response to GPUN's 5/25/95 exemption request. GPUN has requested a meeting with the staff.

Other chanaes:

+

The final MOV modifications in response to Generic Letter 89-10 were completed during the 11R refueling outage (October 1995) and the staff is scheduled to conduct a followup inspection in April 1996.

+

GPUN submitted the 3rd 10-year Inservice Testing (IST) Interval Program for staff review on September 21, 1995. The staff is targeting completion of the review for April 1996.

+

Issuance of an amendment responding to TSCR No. 254 incorporating additional NUREG-1430 improvements has been delayed pending resolution of one issue regarding station battery surveillance testing. GPUN has been requested to submit a supplement to the TSCR to add an additional action statement.

+

GPUN discussed their intention to request amendme.;t to increase the authorized maximum reactor power to 2772 MWth, the maximum B&W NSSS 9602220099 hg9 DR ADOCK PDR I

GPU Nuclear Corporation reactor design power level. Modifications will be needed to the balance of plant to achieve that power level.

4

!

  • GPUN submitted a request on December 2, 1995, to adopt the NUMARC

! emergency action level (EAL) definitions. The staff expects to complete its review in July 1996.

+

Staff review of the TMI-1 Individual Plant Examination (IPE) Report is  ;

nearly complete. A staff evaluation report should be issued in May '

1996, d

1

+ The status of remaining action on TSCR No. 227 (incorporation of NUREG-1430 improvements) was discussed. The remaining issue involves surveillance testing of the control room emergency ventilation system.

NUREG-1430 specifies that periodic laboratory testing for charcoal

adsorber efficiency be performed in accordance with test standard ASTM i D 3803-1989. GPUN has elected to continue using a different test
standard. GPUN requested a conference call with the NRC technical reviewer in this area of expertise.

+ The staff is continuing its review of three topical reports in support i of GPUN being qualified to perform core reload analyses for TMI-1 (presently performed under contract by Babcock & Wilcox). One additional topical report is to be submitted by GPUN. The discussion of t

i this project focused on the fact that the NRC plans to issue Supplement i 1 to Generic Letter 88-11, which would drastically simplify the process for a licensee to perform its own reload analyses. The Project Manager

agreed to schedule a conference call to further discuss this issue.

Sincerely,

/Vdv ~

Ronald W. Hernan, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-289 Attachments: 1. List of Attendees

2. GPUN meeting handout j cc w/atts: See next page

- l 1

l Three Mile Island Nuclear Station, Unit No. 1 CC:

Michael Ross Robert B. Borsum Director, O&M, TMI B&W Nuclear Technologies GPU Nuclear Corporation Suite 525 P.O. Box 480 )

1700 Rockville Pike Middletown, PA 17057 Rockville, MD 20852 l John C. Fornicola William Dornsife, Acting Director Director, Planning and Bureau of Radiation Protection Regulatory Affairs Pennsylvania Department of GPU Nuclear Corporation Environmental Resotrees 100 Interpace Parkway P.O. Box 2063 Parsippany, NJ 07054 Harrisburg, PA 17120 Jack S. Wetmore Dr. Judith Johnsrud Manager, TMI Regulatory Affairs National Energy Committee GPU Nuclear Corporation Sierra Club P.O. Box 480 433 Orlando Avenue Middletown, PA 17057 State College, PA 16803 Ernest L. Blake, Jr., Esquire Mr. James Knubel, Vice President Shaw, Pittman, Potts & Trowbridge and Director - TNI 2300 N Street, NW. GPU Nuclear Corporation Washington, DC 20037 Post Office Box 480 Middletown, PA 17057 Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Michele G. Evans Senior Resident Inspector (TMI-1)

U.S. Nuclear Regulatory Commission P.O. Box 311 Middletown, PA 17057 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

- _ _ . . . . _ . . - _ - . . . - . . - . _ _ _ - _ - = - . ...

j LIST OF ATTENDEES

JANUARY 25, 1995 MEETING WITH GPU NUCLEAR CORPORATION I

1

)i TITLE AFFILIATION TITLE

~

Ronald W. Hernan NRC/NRR/PDI-4 Senior Project Manager

] Michelle Evans NRC/ Region I Senior Resident Inspector l Peter Eselgroth NRC/ Region I DRP Branch Chief j Jack Wetmore GPUN Licensing Manager Bob Knight GPUN Licensing Engineer

Samual Hansell NRC/ Region I Resident Inspector

! Greg Gurican GPUN Licensing Engineer Stan Miangi Pennsylvania DER Inspector 4

1 i

i i

i i

1 1

1 A

1 1

I Attachment 1

. _ _ _ _ _ . _m- . _ _ _ < . - _ _ _ _ ._ . . _ . . . . _ . _ . _ _ _ . .

~

  • t 5, 1996 PcGT *  !

'ePuM/NRC LICENSING ACTIVITIES LI$T r

LAl/LAR/ Nest CATEGORY ITEM ENGE FILE No. GPUN ACTION / STATUS Inc ACTION / STATUS Actten tur TAC No. PRIOR

........... ................ .... ........ ............................................ ........................,.................... ......... ....... ..... 7 GENERIC SeUG (USI A-46) TN 84-9249 GPUN IEESPONDED TO SER (C311- 5 -3186, DATED NRC ISSUB SER SUPPLEW NT ON 5/22/92 To GPUN/NRC N69486 C [

IRILTI PLAlli 92-9114 7/29/88), sf LETTER NOS. C311 N-2134, DATED RESOLVE PREVIOUR OPEN ITEflB. INic AeREW TO Lap a El 87-02 92-9170 10/6/88; AIIB, (C311-09-3079, DATED 3/7/89) A SINELE unamanum. NRC EVALIMTION OF SUPP 1 CAT 5 i i 94218 eUESTIONS - INTEGRATED SCNESULE IN A LETTER RESPONSE MTED 11/18/92 (C311-92-3219). NRC W

[ 95059 (C311-90-2009)..M TED 1/26/90. APPROWED WIAI IETNEWOLOST FM SEVELWIENT OF f SPUN LETTER (C311-92 2119), MTED 9/21/92 FLOOR RESP W EE SPECTRA POR RESOLUTION OF UBI f( CepetITTED TO CCIPLETION OF A-46 Am sugNITTAL OF RESULTS BY 5/22/95. SAFE A-46 IN A LETTER M TED 9/36/94 (C311 94-3247). Ist 70 IXIORDINATE REVIEus y

r SNUTDOME LIST SEVELOPED 5/93. SPUN SUENITTED OF A-46 A m IPEEE (SEINIIC PORTION) WITN

_f; PROC & CRITERIA UeED TO DEvfLIP FLOR JOINT RAI TO N 19512D IN 4/96 AIS TWE FINAL .

f RESPONSE SPECTRA ST LETTER (C311-93-2103), SER TO BE ISOMED IN 12/96. NRC 30-M T RAI iR MTS 8/19/93.10R untleCuRS lEtE CIsrLETED M TED 8/29/95 (C311-95-3371).

E AS SCNEDULED.

SINOIARY REPORT NO. 42105-002 m etITTED W -

(p 5/17/95 (C311-95-2190) IDENTIFIS 11R AND  ;

12R NODS. CLARIFICATICII 0F PROPRIETART i I.

CLAUEE IN THE SEI MIC REPORT 1848 M WIITTED l 01: 7/26/95 (C311-95-2307). ePUR RECEIVED l 5 RAI un 8/29/95. RESPONSE SUENITTED CII - f 9/27/95 (C311 95-2361).  !

11R HSS WERE IXBIPLETED PRIGIt TO 10/13/95 l

, STARTtr. l v ,

I W

  • a WNERIC Iruftwidset Plant DJD 89-9250 EPUN susIIITTED THE IPE 011 5/20/93 PER Tul-1 IRC 120 MT RAI MTS 8/3/95 (C311-95-3332). Inc NT4480 53 h-

~

IRILTI-PLAllT Evetustians INTEeltATED SCNEBULE (C31193-2948). WUN NRC TO CerLETE IEEVIEW OF IPE DT 4/96.  ;

, EL 88-20 (IPE) RECIEVED DRAFT ELESTIWf3 FRWI IIRC 011 7/24/95 i AIS FOMEAL LEYTER 011 S/3/95. SPUN SUEftITTED l RESPONSE TO RAI ON 12/6/95. j

{ i A GENERIC IPEEE DJD 91 9238 1PEEE PItoeRAN DESCRIPTICII SUINITTB 12/24/91 MIC TO REVIEW PLAII AS SCMBULE BT 3/31/92. NRC NE3685 83  :

$; IRILTI-PLAIIT 91-9239 (C311-91-2150). FIIIAL IPEEE RESULTS TO BE IRC Is amassansE TO A SINGLE 1stLEDOtm. ALL 92002 SugNITTS 12/20/94. GPUN 9U5101T75 SCRESULE PLAllTS WILL BE AMD TO RESPOIB SEFERE 6/94.

g} stSupp 8B-20 4 REASSESSIENT LETTER 9/2/92 (C311-92-2107). IETNepeLOST IS ACGPTABLE, 6/95 IS LATEST i

+

, EPUN SUNIITTED FINAL IEEE REMILTS IN A MTE ACGPTMLE. LETitt is Wts 4/29/92 I

$p. LETTER (C311-94-2332), MTED 12/29/9%. CONFINED T*IS. IMC LETTER (C311-93-3266),  !

] M TB 11/18/93 APPe0WED T E SCNEBULE. NRC *

[" 70 COMIIIATE REVIEUR OF IPEEE (WIWitC) Am  !

k' SWE (UBI A-44) WITN JOINT RAI TO BE ISSIED 4/96 AIB FINAL SER IN 12/96.

l' t

k ATTACHMENT 2

i~~ *.

[

5, 1996 GPC/NRC LICENSING ACTIVITIES LIST *EtJ /

i LAI/LAR/ Next CATEGORY ITEN ENGR FILE No. GPUN ACTION / STATUS NRC ACTION / STATUS Action ly TAC No. PRIOR GENERIC RV Integrity TN 92-9055 GruN sueNITTED RESPON5E ON 7/2/92 NRC RAI M TED 7/19/93 (C311-95-3159). NRC ePUN/NRC 'N83741 C NULTI-PLANT (C311-92-2006). SUDG REPORT SUENITTED FED APPROWED TRE APPLICASILITY OF BAW-21?BP A W i GL 92-01 1992 FOR UELDS SELOW 50 FT-LDS UPPER SNELF DAW-2192P IN A LETTER 70 SWS DATED 3/29/96. t ENERGT. OPUN RESPONDED TO RAI ON 12/13/96 WRC REeUESTS ADDITIONAL INFORMATION IN SL (C311-93 2163). ePUN LETTER DATED 5/13/96 92-01, REVISION 1 (C311-M-30TT), DATED (C311-96-2075) CWetITTED TO RESPON9E 30 DAYS 4/11/96. Ist IET WITN BWB ON 5/19/96 TO .

FRW DATE LAST EWOS PUNIT REMIVES RAI. DIS (USS WWRIC EWS REWtmW. IIRC REVIEW i OWDG GENERIC RESPONSE (SAW-2222) m s OF BAW-2222 IS ON IIeLD PEWING LICENSEE '

d PROWIDED'IN JUNE.1994. EPull RESPONSE (5000-M-0030/C311-96-2097), DATED 6/24/94 RESPONSES 70 et 92-01, SUPPLE 9Elff 1.

A ,

M EWORSED TIE BIAIS REPtmi (SAW-2222) As CONFlWED APPLICAtlLITY OF SAW-217p Als i

i' t SAW-2192P TO TNI-1 FOR EGWlVALENT SIARGlu ,

AIIALYSIS OF ITS LOW IPPER SIELF WLD IETALS. I' SPIAI SISSITTED INITIAL 90 DAT RESPONSE TO SL 92-01, SUPPLEIENT 1 CN S/16/95 (C311 95-2313). THE RegnININS 100 DAT =

RESPONSE lAIICN ENDORSED SAW-2257, REV 1 ms t

SUENITTED CII 11/20/95 (C311-95-2478). BMDG

~

WILL CoprLETE EWRLUATICII 0F TWE " RATIO i PROCEDURE" WITIt REWECT TO LIISE 80 WLDS  !

Ale 5tsNIT TIIE RESULTS TO NRC DtmING TIE 35 OTR OF 1996.

GENERIC Thereo-Los 330-1 WGII/ 94-9181 GPUN RESPUISED TO GL ON 4/12/93 NRC IIEeUESTED ASDITIONAL INFORIWITION IN A GPUN sm5615 C

  • 9tETI-PLANT Fire Berriers OJD (C311-95-2015). GPUN RESPOISED TO 12/21/93 LETTER DATED 12/21/93 (C311-95-3292). BT i CL 92-08 RAI CII 2/10/94 (C311-M-2012). GPUN, LETTW DATED 9/19/96 (C311 M-3237) Inc
  • RESPONDED TO 50.54(F) REGUEST ON 12/05/94. ACICIgutspeED ePUN 2/10/94 RESPONSE TO RAI l GPUN DISOfSSED TIE PLAIINED ACTIONS WITN TIIE AW RESESTED Wim RESPtm IN 90 DAYS TO ,

PIIOJECT SIANAGER GII 11/15/96. ePUN ATTEIBED SECTient SF TIE 2/10/96 Wim RESPONSE THAT r

l PUBLIC IEEETING WITN NEI Als Inc ON 3/14/95. WAB SEEN BEFERRED W WWE INOWFLETE. 87 GPUN RESP 0eED TO NRC FOLLCIAF TO THE RAI W LETTER BATS 12/29/M, WC WeUESTS  !

l 3/29/95 (C311-95-2119). RESPONSE TO CERTAIN ABDITIONAL INFOINIATION WITNIII 90 IN A - .

i k SECTIONS TIIAT REeutRE WI AIS IIRC AMEE9ENT FOLLERAF TO TW PNVIENS RAI. BT LCTTER i WILL DE SUENITTED WITNIN 30 DAYS OF DATED 5/25/95 (C311-95-3261), Inc AEeUESTS

/ IIOTIFICATieu TIIAT AMEEIENT WS REACMD. MDITIERAL INFtWETitNI WITNIN 45 BATS

  • l i , GPUN RESPONSE TO THE 5/26/95 RESPONSE TO THE REeAWING isE 3/29/95 Wim RESPONSE TO THE l FOLLOW-tr TO TIE RAI ms 5tmIITTED 7/7/95 PREVIENS RAI. WC DENIED TW E1WFTitNI

( y\ (C311-95-2265). ePUN NAS IIEeUESTED A REGUEST Bf LETTER DATED 1/5/96, i

, IEEETIIIG WITN TIIE IIRC B4AtlNS TIIE IEEK OF 3/18 ,

"- TO CLAltlFT EXEIFTICII DENIAL ISSIES.

> t p,

d a w  ;

.e  :

T '

s t t ,

Is

~

'S U .,

5, 1996 GPLO/NRC LICENSING ACTIVITIES LIST PAGE 3

. [

F+SENERIC ' CATEGORY MULTI-PLANT GL 95-03 ITEM CIRCUNFERENTIAL IstK 95063 CRACKIIIG OF S/G TUBES LAI/LAR/

ENGR FILE No.

GPUN ACTION / $TATUS

........................, g ...............

GPUN SugNITTED llESPONSE TO GL 95-03 ON 6/20/95 (C311-95-2258). GPUN LETTER DATB 9/26/95 (C311-95-2398) lifeUESTED EXTENSION 0F DUE DATE FOR RAI RESPONSE. IIESPONSE 70 NRC ACTION / STATUS NRC REstESTED AseITIONAL INFORMTION IN A LETTER DATO 8/30/95 (C311 95-3387). WRC SECO W RAI M S DATED 10/27/95 (C311-95-3470). NRC TO REVIEW WIN Nent Action try iAC No. PRIOR WRC M92283 C RAI WAS PROVIDED CII 10/30/95 (C311-95-2451). AESPONSES ST 4/96. NOTE: NRC ISSIMD IN }

GPUN RESPONSE TO SECO S RAI WAS PROVIDED ON 95-964 (C311-95-3429), DAT B 9/20/95 (95021) 11/21/95 (C311-95-2486). AS StFPLEIE1 ITAL INFORMATION llEGRADING GL 95-03.

k SENERIC PRESSURE LOCKING Istit 95082 ePUN SUBNITTED 60 DAY RESPONSE ON 10/13/95 NRC 70 K VIEW RESPONSE ST _Tse _. SPUN C

{ IRALTI-PLAIIT AIS THERIWIL (C311-95-2425). ePUN ATTE WED PUBLIC ,

y GL 95-07 el e ING OF SR IEETING ON 11/2/95. 180 DAY FIIIAL llESPONSE g GATE VALVES IS DUE 2/13/96. [

GENERIC . TESTING OF AUN 96033 60 DAY RESPONSE IS DUE 3/10/96. IEtt TO REVIEW RESPONSE BY _TED_. 8 PUN C l IRALTI-PLANT SAFETY-RELATED GL 96-01 LOGIC CIRCUITS PLAali 20TN-TR TENDON IEtt 95050 IN A LETTER DATED 9/26/95 (C311-95-2395) met REeUESTED ADDITIONAL NRC M92045 C SPECIFIC SURVEILLANCE GPUN REGUESTED EXTENSICII 0F file RESPONSE DUE INFOMWITIM/ CLARIFICATION IN A LETTER DATED l' REPORT DATE. RESPONSE IS IIOU DUE TO NRC 05 8/31/95 (C311-95-3393). IIRC TO REVIEW GPUN g 11/29/95. GPUN RESPONSE TO THE RAI MS RESPCBSETOTIIERAIBY[/96. j Pit 0VIDED ON 11/29/95 (C311-95-2502). y l i

PLAlli SPECIFIC IIICORPORATE IIUMARC EAL'S AUN 95005 IN A LETTER DATED 12/2/95 (C311-95-2496)

GPUN REeUESTED APP 90 VAL OF A PROPOSED CNANGE NRC 70 REVIEW BY _ N _ . p NRC C ,

i E-PLAll TO EPIP-TIll .01 WillCit IgrLEIENTS TIIE  !

ARC /IIESP-007 IETIIWOLOGY FOR EIERGENCY  !

ACTICIt LEVEL (EAL) DEVELOPikWT. NRC PPROYAL [

L ,

IS REeUESTED BY 6/96.  !

I I I

.. I v

N e

r q t G

3

~

}~

. - ~ . - ~ . - ~ . - ._ - .. ~ .. - _ _ - . . -

' dry 5 01996 GPUN/NRC LICENSIIIG ACTIVITIES LIST PQcf 6 LAI/LAR/ Neat g-CATEGORY ITEN ENGR FILE No. GPUN ACTION / STATUS NRC ACTION / STATUS Action tv TAC Wo. PRIOR

........... ................ .... ........ .......................y.................... ............................................ ......... ....... .....

PLANT -Ten veer ISI suit 95052 GPUN SUENITTED PROGRAN DESCRIPTION W/ RELIEF NRC APPROWED FIRST INTERVAL MLIEF ON NRC 9100197 C

' SPECIFIC Progree REGUESTS 4/19/91 (C311-91-2010). GPUN 9/11/91 (C311-91-3176). NRC IIEeUESTED NO4761 ISI - 107R oeserIption and SUUNITTED ADDT't INFORMATION/CliOIFICATIGN ABSITICRAL INFOMIATIGN INI 9/19/91 pW58TT Relief Reapests 12/18/91 (C311-91-2129). ePUN SugNITTW (C311-91-3173) REeARDlWS 2W INTERVAL MeUEST TO DEFER OTSG SECOWARY SIDE NT9RO PROWNI. NRC TRAIWIITTEW SER 10/0/92 TO 11R ON 10/9/92 (C311-92-2132). ePUN (C311-92-3192). ImC APPROUED OTSS NTOIIO O SUNIITTED 3 RELIEF IEEetESTS ON 2/16/93 N FERRAL 1/5/93 (C311-95-3ee5). INtc j6 (C311-93-2006). EPUN SUUNITTED ANOTHER TRANSNITTS SER CII 9/1/93 (C311-95-32D6).

h IIELIEF REeUEST Oil 4/16/93 (C311-95-2031). TIE 19/8/92 SER REellRED EmLIFICATICII 0F AS ItteUESTS BY TWE NIIC IN A NTS ON 5/27/96, THE ALTERNATIVE EIUWIIIIATICII TECNNieUE. IN A P EMOS WILL RESPW 10 RAI IN 4-6 IEEKS TO IITS IN 5/27/94, eles tat RESESTS TO 1 SATISFY COWITIONS FOR WAllTIIIS RELIEF PROVISE W DITIINAL FRACTimE ANALYSIS FOR NRC I REeUEST 110.1 AS PROVIDED IN THE NRC'S SER TO CONCLISE THE COWITIONS IIAVE BEEN BET.

DATED 10/0/92. WWOG LETTER 08-1306, DATED SUBJECT TO SMOS IIESPONSE, TWE INIC WILL 6/8/96 CINWIITTED TO WDITIINIAL WNERIC PROWlOE A M E RIC APPROURL IN T K game SOURINE FRACTimE IECIIAIIICS AIIALYSIS. EWOS DOWET FOR MFERENE ST PROJECT IIANAERS FOR RESPOWED TO RAI 8/24/96 (08-1416). BuOS EACN OF THE PUNtf 30GETE. IRC REGIESTED ItESPOWED TO Ital CII BAW-2228 ON 10/26/96 WDITIONAL INFOMETION IN BAW-2220 SY LETTER (OG-1432) REeUESTING IIRC RESPONSE BY 11/94. DATM 10/12/96. IIRC APPROWED BAtt-2228 IN A TNI-1 IIEEDS APPit0WAL SY 4/19/2001; OTIIER DEU LETTER TO BMOS DATB 12/2/96, tRIICN PLANTS IIEED RESOLUTICII SOUNER. 12/2/94 REttESTED LIMNSEES TO IIEFERENCE Als CONFIIt91 '

LETTER. 3848 ISSUED BAW-2220 AS BAW-22284 APPLICASILITY TO BAlt-22284. NRC TO REVIEW 2/17/95 (C311-95-3140). ePUN ItESPONSE TO SAW-222ENP, IIEV 1 Am SAW-2220P, REV 1 BY ,

ImC's 12/2/96 LETTER tAIICII REeutitED _TB_.

CONFillflATION OF THE BAW-2228A ASSLNW'TIONS IS

- ON IIOLD PEWIIIG NRC REVIEW OF SAlf-222W', REV 1 Als BAti-2228MP, REV 11AIICN tIAS SUBIIITTED BY SWOG LETTER (0s,95-1536). DATED S/21/95.

Inc C b PLAlli Ten Yeer IST Iutt 95076 GPUII SIGNITTED Pit 0ERAN SESCRIPTION W/ RELIEF IRC TARET DATE FIR REVIEW OF IIELIEF 5/96.

SPECIFIC Program REeUESTS on 9/21/95 (C311-95-2305).

[! IST - 10TRDescription and $

f Relief Resposts F.R. IIOTIM 19/14/92. SINCE THE 7/1/93 SPUN 886597 C j TSCit 214 Prisery / PFC GPUN SUENITTS A TSCR TO REVISE CURItElli 0.1 Secondary futK EPN LEAIRATE TO 0.2 GP91 (PREVIOUSLY APPROYED IEETING, TIE Inc ISICATED TIE REttEST WILL *

, 5y

<N' Leekrete UN A TE95'0ItARY BASIS) 5/13/92 NOT BE APPROUED ON A PEmuMENT BASIS. e h'

4 (C311-92-2036). GPUII IET WITE IRC 011 7/1/93 TO DISCUSS APPROWRL OF A PENWIIENT CIIAIIE 70 --

h 0.2 GP91. GPUN SUPPLEIENT TO TSCR-214 ED '

!. (C311-95-2174), DATED 1/10/94 PROVIDED j

) (

{. ADDITICIIAL INF0MtATICII Fit 0N 10R TO SUPPORT A PERNAIENT CIIAIIE. AFTER 11R TURE INSPECTIONS, GPtBI WILL EVALUATE WITW RAlflNG TStit MS SUNIITTIIIG REGUEST' TO ADOPT STS LINITS,

[ ,

s

[;*[, -

$ ;3 . ,

5, 1996 CPUN/NRC LICENSING ACTIVITIES LIST PAGF

  • 1l t

LAI/LAR/ Nest CATEGORY ITEM ENGR FILE No. GPUN ACil04 / STATUS NRC ACTION / STATUS Action by TAC No. PRIOR

................ .... ........ ..................... 7 7 7 .-.............

, s TSCR 227 Improvements sett 94233 GPUN SUENITTED TSCR 227 (CM1-94-9151) NRC REGUESTED ADDITIONAL INFORMATI0It IN A IIRC 31

  1. d, free Std Tech 1/16/95 TO ADOPT CERTAIN STS IIFROVEM NTS LETTER DATED 5/16/95 (C311-95-3251).

Specs INCLUDING: CONTAIINENT AIRLOCK REGUIREMENTS, AIEle8ENT 198 (C311-95-3442), DATED 10/10/95 1p DELETE R5 ANNUAL INSPECTION, DELETE RCS , ADDRESSED ALL BUT TWE FORTICII 0F TSCR-227 g,'

k-PRESSURE TESTS NDT REGUIRED BY STS OR ASIE CODE, NYDROGEN RECOMBIIIER SURVEILLAIICE PER UNICN DEALT vlTN CONTROL BUILDING VENTILATICII SURVEILLANCE RLAI fife WillCil IS, r GL93-05, 50.59 REVIEW OF TSCRS, BS N0Z2LE TO DE ADDRESSED BY A SEPARATE AMEIONENT -

7# INSPECTICII 10-YR FREE, stS$v'S FRES, PCSV'S TARGET DATE _TED _ .

FREE & BASIS CNAME, CR AIR TREATIENT STSTEll

- TEST DURATICII FOR SYSTEMS W/0 NTRS. GPUlf RESPOWED TO IIRC RAI IN SUPPLEIENT 1 DATED

$; 6/22/95 (C311-95-2245). ePUN SusMITTED F

SUPPLEfEENT 2 (C311-95-2391), DATED 9/20/95 70 INCORPORATE REFERENCE TO 10CFR50, APP J U REGUIRE9ENT FOR CollTAllpENT IllSPECTICII Am h WIT WRAW TIIE PCSV SASES CHANEES. GPUN NAS N REGUESTED A CONFEllEllCE cal'. TO DISCUSS TIIE ,

b HERITS OF CNANGES TO TIIE TS REeutRElkNTS Folt -

LA80RATORY CHARCOAL TESTIIIG STAISANDS.

s .

I '

TSCR 243 24 NONTN GnG GPUII TO SusMIT A TSCR BY MID-FE91tuARY,1996 WRC AMEISHENT TARET DATE _TOD_. GPUIs al

.. SURVEILLANCE TO EXTElm SEVEN (7) SURVEILLANCES (WITN FREQUEIICY NOTATICII "F") TO ACCCBItDATE TIE 24

{ II0lITN FUEL CTCLE. TIIESE REFUELIIIG INTERVAL f3,

  • ' SURVEILLANCES lERE IIOT COWERED BY AfEISBNENT
s. 175 (TSCR 206). THE TSCR WILL ALSO CORRECT

% GIISSICII FROM TSCR 252/JutleIENT 1M.

a -

Q TSCR 248 REMOTE SIIUTDOWN DPK ACTICII TRANSFERED FRGE GEIIERIC 3RILTI-PtAIIT NRC AfflepENT TARGET DATE _TED_. GPUN C I

h TECW SPECS GL 86-10. GPUN TO SUBMIT REMOTE SNUTDOWN

[g TECM SPECS SY 3/31/96.

. TSCR 249 CONTAleqENT IstK GPUN TO SUOMIT TSCR SY _TED_ ALLOWIIIG AIR NRC AIEIENENT TARGET DATE _TS_. GPUN 81 REGUIREIENTS LOCK DOORS TO BE OPEN DUltING FUEL MOWEDENT .

DUltING REFUELING BASED 010 0FFSITE DOSE CONSEeUEIICES OF A FUEL MANDLIllG ACCIDENT USIIIG TIIE IIEW SCRRCE TEfBIS 1 (IIUltEG-1465). 6 k TSCR 253 Improvements frem RSTS

  1. Wtt GPUN TO SugMIT TSCR SY TO REeUEST CNAiIGES TO INCORPORATE IIWit0WUENTS FRtf8 TIIE NRC JWEISSENT TARGET DATE _th.

a GPUN C

('*

(Grew 2 of 4) REVISED STASARD TECNIIICAL SPECIFICATIONS (NUREG-1430).

i 5

__.....m.m. . . - - . . . . . . _ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ . _ . _

. tQ& n ;y p*> T .

' " ' * ~ ~

f' PCTA r 50 1996 GPUN/NRC LICENSING ACTIVITIES LIST LAI/LAR/ Nent.

. CATEGORT ITEN ENGR FILE No. GPUN ACTION / STATUS NRC ACTION / STATUS Action IV TAC Wo. PRIOR' 7.....................

g TSCR 254 Ingrovements Alsi 9'5072 GPUNSimMITTEDTSCR-254M1N NRC TARET AIEmIENT MTE 14/Es795. eruN C from RSTS (C311-95-227F) RENUESTED CNAMEES TO 7 (Grong 4 of 4) INCORPORATE INFRO M NTS FRENI THE REVISED

  • STAISARD TECINIICAL SPECIFICATItNIS (IRsIEG-1430). ertsi StatITim TSCR-254,

~ .h* , REVISICII ON 12/21/95 (C311-95-2531) 10 .

REFLECT RAISIIIS TWE LOW VOLTAE ACTIGIl LEVEL TO 105 VDC F0LLtaflIIS CGIFERENCE CALL WITA WRC ON 12/13/95.. eruu TO SUBIIIT TSCR-254 REVISICII BT 2/S/96 (67T0-96-2064) TO REFLECT ADDITICIIAL ACTICII IF PILOT CELLS ARE OUT OF SPEC.

Ip TSCR 255 Improvements wen 95077 OPUN TO SUEstit TSCR-255 ST 70 REeutST INic TAREET AIWWIIElli MTE _TED_. GPUN C -

E from RSTS CIIANES TO INtXMPORATE 19FROWEIWITS FRtst TIE N (Grote 3 of 4) REVISED STAMAN TECNIIICAL SPECIFICATIONS

(NUREG-1430). ,

p ~

ESAS Alat EPtAI TO StatIT TSCR ST _TED_ TO ENTEM Imc TARET AlmeIENT DATE _TW_. WIRI C

[: TSCR 256

t. Surveittance SURVEILLANCE INTERVAL FatNI ENISTING IIENTIILY f Intervel INTERVAL Felt ESAS TESTIIIG.

y Entension

.Y f TSCR 257 Improvements JSS ePUN TO SUgIIIT TSCR sf 3/96 70 REeIEST Imc TARGET AIWWIENT NTE _Tm_. SPUIl ,C frem RSTS CIIAIIES TO IIICORPtmATE IIFROWEIENTS FRENI TIE

[!

{ (Grony 1 of 4)

REVISED STAleARD TECIIIIICAL SPECIFICATIONS p (IRREG-1430). ,

TSCR 258 ESF Ventilation IWK EPUII TO St24tf TSCR ST 2/96 TO DELETE WRC YARET JNEmIENT RATE 2TS_. arts C ItEGUIIIEIENT FOR FIEL IIAIBLING BLDG ESF VENTILATICIt SYSTE91 AIS MIDIFT MSIS Felt i

Ault&FIS VENTIILATICII TS TO PRIOR WinDINS.

1 f

I ,

.. t 2 l

?

e e

6 8

9

,% $)
  • M ". * *

' 5,1996 GPUN/NRC LICENSING ACTIVITIES LIST PacF LAI/LAR/ Cat

) CATEGORY ITEN ENER FILE No. GPUN ACTION / STATUS NRC ACTIDW / STATUS Action Iyy TAC Wo. PRIOR

..................... , p .............

TSCR XXI In-Nouse Retoed. DJD 95037 GPUN TO SURNIT A TSCR AIS REeUEST FOR IIRC RAI DATED 8/23/95 (C311-95-3366) WRC GPUN M92166 C Methodology TOPICAL REPORT REVIEW AIS APPROVAL TO REGWSTED A00lfl0NAL INFORMATION REGARDIllG PERFORM ItELOAD AIIALYSES USING IN-NOUSE TR-091. NRC AfEISIENT TARGET DATE _TED_.

J. METNODOLOGY AND CRITERIA SEGlWNING WITN CTCLE 12. TOPICAL REPORT TR-091 MS

p. SUBNITTED ON 3/6/95 (C311 95-2063). TR-078 7 M S sUeMITTED ON 3/17/95 (C311-95-2064). ,

TR-087 MS sulNIITTED ON 4/25/95

. (C311-95-2178). THE REMAINING TOPICAL I REPORT TO SE SUBMITTED IN FES. 1996. NRC 8 RAI ON TR-091 ISSUED S/23/95. TELEten IIELD Y 9/20/95 TO CLARIFY SESTIONS. RESPONSE TO RAI ON TR-091, REV 0 MS SUOMITTED ON z

10/05/95 (C511-95-2406). NRC APPROVAL WILL SE REGUESTED BY 4/96. GPUN IS MONITORING THE STATUS OF POTENTIAL CL 83-11 sWPLEIENT WIIICN IIAT ALLOW IN-IIOUSE REtoms VITIIGJT PRIOR IIRC APPROWAL OF UTILITT TWICAL REPORTS. A CONFERENCE CALL MS REMESTED OF

{y. ,

IIRC TO DISCUSS THE NRC REVIEW CYCLE AIS TIIE CYCLE 12 RELOAD ANALYSIS SCHEDULE.

P-T LIMITS GPUN TO SUBMlf TSCR ST 9/96 TO PROVIDE P-T GPUN A

$ TSCR XX2 TN NRC TARGET ABIEW MENT DATE _T8D _.

E - LIMITS 3ETOND 15 EPPT, UNICN IS EXPECTED 70 t SE REACNED AT 517 EFPD INTO CTCLE 12 UlIICN SEGINS 9/97.

h TSCR XX3 PERFORMANCE Mitt 95022 GPUN TO SusMIT TSCR INCORPORATING TN'E IIRC TARGET AIEINNENT DATE _TOD_. GPUN 81

{r BASED 9/26/95 APPE R IX J FINAL RULE (60FR49495) BY -

  1. f

't

( CONTAlWMENT LEAK TESTING 4/30/96 WITN AIEWIENT REGUESTED BT 9/96.-

9 f ELIMlHATION OF IRC BASED W 12/95 sueMITTAL, mRC IIAS AMEED TO GPUN 81

[ TSCR XX4 EPUII TO SUBMIT TSCR T[ELIMIIIATE RCP y' RCP FLYWuEEL FLYWNEEL EXAMIIIATICIIS80LLOWIIIS IIRC APPROWAL GIVE A STATUS IN 2/96 AN A FOLLOW-tr T. EXAlllllATION OF WESTINGIIOUSE (531ERS GRG P TOPICAL REPORT IEETIIIS IF IENSSARY REGANIIIS WERIC fy (REF: WCAP-14535 12/95 DRAFT) WNICN IS APPROVAL. .

, 4 ,

SCHEDULED TO BE SUOMITTED BEFORE TIIE E2 0F e

, . 1995. WE UWERSTAND TNAT A LEAD PLANT j

f' SugMITTED TNIER TSCR IN JAIIUART WITN THE ~J

i P s WESTIIIGNOUSE TOPICAL Als TIIAT TIIE TOPICAL .-

/

3 i

( i, REPORT IIICERPORATED RESPONSE TO RAI 011 AN EARLIER SUOMITTAL. ,

! a

! 9 l k.

i d i

, a t ,.

t:

~"v *w Ql .Lf.X QL Ql '

e S, 1996 ePUN/NRC LICENSIIIG ACTIVITIES LIST PAGE 8 L

LAI/LAR/ Next ITER ENER FILE No. GPUN ACTION / STATUS NRC ACTION / STATUS Action ty TAC No. PitIOR

f. CATEGORY '

TSCR XM5 Pouer Uprote DJD -- N ST FOR GPUN TO SUNIIT LICENSE'.......................tr hAC TARET NElefENT DATE _TW_.

WUN A1

.- POWER UPRATE 70.2TF2 IRff BY 9/96. SUBNITTAL SCNEDULE ALLOWS A 1-TR NRC REVIEW FOR h

ISSUANCE ST 9/97 (PRIOR TO 12R). A

' ? CONFEltENCE CALL /IEETINS lets RESESTED OF NRC TO DISQlSS A LIGIESE CNAIIW APPROADI FER CYCLES 12/13.

CONTIt0L lI00 gacP DJD LATER Erns 1 TO SUBIIIT A TSCR TO ALLOW CWITROL RW NRC TARWT NEIBIENT DATE_TW_ Wim N/A B1

.fi. TSCR XM6 TIIE Datr TIIES tr To 3.0 SEttNWS. TARGET SimftITTAL DATE: 3/31/96 i,

6 .

Y o

s A

o

e .

2 .  !

g.

i

  • l

. t t

\

- - . _ . - _ _ - - _ _ _ _ - - - . - - - , _ _ _ . _ - _ - _ _ _ __ ___ -- - - - - _ - - - - - - _ , - - - - _ - - - - - - - - _ - - - ~ n r

'~

s

  • . ,f'f- * -.W s, g , w...,

)

F. A y , 6 6 ,

r}

&  ; ~4 ,

-, qo ]

- ; t, , ,

e

~

MEETING SUPMARY  :. ' e c .

., 1 E-Mail -

,i i , - .. '

I WRussell/FMiraglia * *

~7 4

I

)

~

RZimmerman . ; ,

-SVarga s '

JZwolinski JStolz , ,

SNorris '

OGC l ACRS WDean  :

EJordan,D/AEOD {j HARD COPY

'DocketiFilej l PUBLIC ,

PDI-3 Reading RHernan PEselgroth, RI l i

I l .

i l

1 4

I i

t s t

  • i s #>

c '{

i' ~ ,' , _

y , *, ,

  • . t

. +,~ n,' 'n. ~ <

,e,  ;

P j s' o .-

,. , . , y

'I f.' _ j , e g

.c +e--> *

? Os 3

- 5 *~

9 { , u .9 -

. , , e. , .

4

  • f

) _

, \ .O l-(

4._s A

  • i
  • j s 3 b

g ', 5 #

.a y

  • s i 1
  • c

, a t

-4,

GPU Nuclear Corporation .

February 15, 1996

. reactor design power level. Modifications will be needed to the balance  ;

of plant to achieve that power level. '

e' GPUN submitted a request on December 2, 1995, to adopt the NUMARC emergency action level.(EAL) definitions. The staff expects to complete its review in July 1996.

e Staff review of the TMI-l Individual Plant Examination (IPE) Report is nearly complete. A staff evaluation report should be issued in May 1996.

e The status of remaining action on TSCR No. 227 (incorporation of NUREG-1430 improvements) was discussed. The remaining issue involves surveillance testing of the control room emergency ventilation system.

NUREG-1430 specifies that periodic laboratory testing for charcoal adsorber efficiency be performed in accordance with test standard ASTM D 3803-1989. GPUN has elected to continue using a different test standard. GPUN requested a conference call with the NRC technical reviewer in this area of expertise.

~

e The staff is continuing its review of three topical reports in support of GPUN being qualified to perform core reload analyses for TMI-1 (presently performed under contract by Babcock & Wilcox)~. . One additional topical. report is to be submitted by GPUN., The: discussion of this 9roject focused on the fact that the NRC plans to issue Supplement I to Generic. Letter 88-11, which would drastically simplify the process for a licensee to perform its own reload analyses. The. Project Manager i agreed to schedule a conference call to further discuss this issue. .o ,

its review in July 1996.' , w i

. p> '

1 Sincerely,.. ,.

Original qigned,by: -

Ronald W. Hernan,' Ssnior! Project Manager '

Project Directorate I-2.. . , i Division of Reactor Projects - I/II M '

Office of Nuclear Reactor Regulation Docket No. 50-289 4 )

Attachments: 1. List of Attendees

2. GPUN meeting handout cc w/atts: See r.30 page Document Name: G:\HERNAN\2-5-96. SUN o m es LA: POI-3 PM: POI-2 O D:PQi-2 NE '

SNofr RHernan:dt3[JStolb me 4//5/96 Ilfjff96 k/(/96 / / / /

'0FFICIAL RECOR1 00PY j