Addl Response to FOIA Request for 15 Categories of Documents Re UCLA License Renewal.Forwards Documents Listed in App A. App B Documents Partially Withheld (Ref FOIA Exemption 4)
ML20054C736
Person / Time
Site: 05000000, 05000139, 07001068, 07000049, 07000115, 05000083, 07000462
Issue date: 11/10/1981
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Pollock M
COMMITTEE TO BRIDGE THE GAP
Shared Package
ML19323G049 List:
References
FOIA-81-339, FOIA-81-399 NUDOCS 8204210581
Download: ML20054C736 (3)


Text

-

fDR-ol4

, p@* 9 Coq'o UNITED STATES

! " 3.,-,(f(' g NUCLEAR REGULATORY COMMISSION E ;-

  • "fly g

WASHINGTON, D. C. 20555 gn

'o n

'8

/

dj November 10, 1981 g,4 p

4

-3

+%,0 s g

Mark Pollock, Esquire A

Counsel for Committee to Bridge the Gap s.

1724 North La Brea Avenue IN RESPONSE REFER Los Angeles, CA 90046 TO F01A-81-339 s

~

Cear Mr. Pollock:

This is in further response to your undated letter received in this office on August 21, 1981, in which you requested, pursuant to the Freedom of Information Act, copies of documents relating to 15 categories of information regarding the UCLA license renewal.

Please find enclosed the six documents listed on Appendix A.

Portions of the documents listed on Appendix B contain infomation which identifies procedures for safeguarding licensed special nuclear material at a licensed facility or plant. This information is considered commercial or financial (proprietary) information pursuant to 10 CFR 2.790(d) and is being withheld from public disclosure pursuant to Exemption (4) of the Freedom of Information Act (5 U.S.C. 552(b)(4)) and 10 CFR 9.5(a)(4) of the Commission's regulations. The non-exempt portions are enclosed.

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt fro.a production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Richard C. DeYoung, Director, Office of Inspection and Enforcement.

This denial may be appealed to the Commission's Executive Director for Operations within 30 days from the receipt of this letter. As provided l

in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, and should clearly state on the envelope and in I

the letter that it is an " Appeal from an Initial F0IA Decision."

This completes NRC's action on your request.

Sincerely,

/

l J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 9204210501 811110 PDR FOIA POLLOCKGI-399 PDR

RE: F01A-81-339 APPENDIX A 1.

I&E Inspection Report No. 50-83/77-4, July 21-22, 1977, with transmittal letter dated August 3, 1977.

i 2.

I&E Inspection Report No. 70-115/78-01 and 50-139/78-02, January 9-10, 1978, with transmittal letter dated January 30, 1978.

3.

I&E Inspection Report No. 50-83/78-05, August 16-17,1978, with transmittal letter dated September 7,1978.

4.

I&E Inspection Report No. 50-83/79-1, April 27,1979, with transmittal-letter dated May 11, 1979.

5.

I&E Inspection Report No. 50-83/79-02, October 22-25,1979, with transmittal letter dated November 20, 1979 6.

I&E Inspection Report No. 50-139/80-02 and 70-115/80-01, April 14-15, 1980, with transmittal letter dated May 5,1980 l

I

Re:

F01A-81-339 APPENDIX B 1.

I&E Inspection Report No. 50-83/75-2, March 24-26, 1975, with transmittal letter dated April 23, 1975.

2.

I&E Inspection Report No. 50-139/75-01 and 70-115/75-01, June 2-3, 1975, with transmittal letter dated June 16, 1975.

3.

I&E Inspection Report No. 50-139/75-02, June 2-3,1975, with transmittal letter dated June 25,'1975.

4.

Letter to University of Washington from R. H. Engelken, dated February 6, 1976.

5.

I&E Inspection Report No. 50-139/76-01, April 26 and 27,1976, with transmittal letter dated May 25, 1976.

6.

ILE Inspection Report.No. 50-139/77-03, September 19-20, 1977, with transmittal letter dated September 27, 1977.

7.

I&E Inspection Report No. 50-139/78-04, July 6,1978, with transmittal letter dated July 19, 1978.

8.

ISE Inspection Report No. 50-139/79-03, February 14, 1979, with transmittal letter dated February 26, 1979.

9.

I&E Inspection Report No. 50-139/79-03, October 31, 1979, with transmittal letter dated November 9,1979.

10.

I&E Inspection Report No. 50-139/80-03, June 11,1980, with transmittal letter dated July 22, 1980.

e

'