ML20052B300

From kanterella
Jump to navigation Jump to search
LER 82-025/03L-0:on 820326,min Average Ice Weight of Sample Baskets from Radial Rows 8 & 9 Group 2 Found to Be Less than 1,220 Lb/Basket at 95% Level of Confidence.Caused by Migration of Ice Mass Away from Crane Wall.Ice Mass Added
ML20052B300
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/23/1982
From: Palmer R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20052B289 List:
References
LER-82-025-03L, LER-82-25-3L, NUDOCS 8204300268
Download: ML20052B300 (2)


Text

.

LICENSEE EVENT REPORT

CONTROt stOCx:

1, I I I I I p (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo Til 1 M i I I D l C l C l 2 lgl 0 l 0 l 0 l 0 l0 l 0 l0 j 0 l0 l025 l0 26lgl4 l1 l1 l1 l1 lgl$7 LAl T bdlg I $ 9 LICENSEE CODg 14 15 LICENSE NUMUER LICENSE TYPE J0 CON'T lolil 8

5 E lLl@l015l01010131116l@l0131216l8l2l@l0l412l31812l@

60 61 DOCKET NUMBER 68 69 EVENT DATE 14 75 REPORT D ATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Oto iO i2l l DURING A SCHEDULED SURVEILLANCE TEST OF THE ICE CONDENSER BASKETS, THE MINIMUM l i o i 3, i AVERAGE ICE WEIGHT OF SAMPLE BASKETS FROM RADIAL R0WS 8 AND 9 GROUP 2 WAS FOUND TO l io i ,i BE LESS THAN 1220 POUNDS / BASKET AT A 95% LEVEL OF CONFIDENCE. THIS CONDITION WAS l

[ o ,3 i l NON-CONSERVATIVE WITH RESPECT TO TECHNICAL SPECIFICATION 4.6.5.lb-2. I l o 16 I I i 10171 l l 10181I I SODE C0DE SUBCODE COMPONENT CODE SUSC DE S DE 101 > l 7 8 l Sl Al@ W@ W@ l Zl Zl Zl Zl Zl Z[@ W@ W @

9 to 11 12 13 18 19 20 LER/RO EVENT YE AR REPO TPO CODE TY N .

@ ,aEg l0l2l5l y l 0l 3l lLl l-l l 0l u

_. l21812 22 l - l---J 23 24 26 27 28 29 au 31 32 T K N A O ON PLANT MET HOURS 22 = a IT FO tb B. SUPPLIE MANUFAC URER ljLj@[ X_J@

33 34

[ Z_j@

35 lZl@

3r l0 l0 l0 lU l 3/ 40 lY 41 l@ l42 Nl@ l43Zl@ lZl9l9l9l@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS l iia l l ICE LOSS WAS CAUSED BY THE MIGRATION OF ICE MASS AWAY FROM THE CRANE WALL, WHICH l li ii i j OCCURRED DUE TO TEMPERATURE GRADIENT INDUCED AIR CURRENTS. ICE MASS WAS ADDED TO THEI

~

gl UNDERWEIGHT BASKETS TO BRING THEM WITHIN TECHNICAL SPECIFICATION LIMITS. l gl (SEE ATTACHED SUPPLEMENT) l l i i 41 1 I

'*Cjgg,Y ST  % POWE R OTHER STATUS. DIS O RY DISCOVERY DESCRIPTION IiI5llG l@ l0l0l0l@l NA l lBl@lSURVEILLANCETEST l ACTIVI TY CO TENT RELEASED OF RELEASE AVOUNT OF ACTIVITY LCCATION OF RELE ASE Z NA l l NA l I i l 68l 9[_Z_} @ 10[_Z_J@l 1 Il 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION li 1711010 l 0 l@l Z l@l N l

PERSONNE t iNau' RIES NUMBER DESCRIP TION NA l li l wUl 910 l 0 l 01@l12 J 11 80

' " ^

'D'E T ESCl^l'r'ON W lZl@l 7 8 9 10 NA 80 l

,$ SUE I .' l a l l Nl i@L'SCR,PT,0N NA @

820 4 30 @G8 NnC Use a tY lllllllllll?lj 4

l

/ 8 9 to 48 69 80 5 NAME OF PREPARER PHONE:

ATTACHMENT TO LER#82-025/03L-0 SUPPLEMENT TO CAUSE DESCRIPTION THE MIGRATION OF ICE MASS AWAY FROM THE CRANE WALL OCCURRED DUE TO TEMP-ERATURE GRADIENT INDUCED AIR CURRENTS. THESE TEMPERATURE GRADIENTS ARE DUE TO THE PROXIMITY OF THE CRANE WALL TO THE STEAM GENERATORS. AS THIS MECHANISM WAS APPARENT FROM PREVIOUS DATA, SOME MIGRATION OF ICE MASS WAS EXPECTED. HOWEVER, THE MAGNITUDE WAS HIGHER THEN PREDICTED.

PRIOR TO ICE BASKET WEIGHING, A TOTAL OF 17 AIR HANDLER UNITS WERE INOPERABLE.

9 0F THE INOPERABLE AIR HANDLERS WERE IN GROUP 2, WITH 5 ALONG THE GROUP 2 CRANE WALL AND 4 ALONG THE GROUP 2 CONTAINMENT WALL. AS A RESULT OF THE LARGE NUMBER OF IN0PERABLE AIR HANDLERS, PARTICULARLY IN THE GROUP 2 CRANE WALL AREA, THE MIGRATION LOSS WAS LARGER THEN EXPECTED IN THIS REGION. THE REASON FOR THE LARGE NUMBE0 0F INOPERABLE AIR HANDLERS WAS DUE TO THE HIGH AIRBORNE RADI0 ACTIVITY CONCENTRATION IN CONTAINMENT WHICH, AS A RESULT OF ALARA PRACTICES, PREVENTED MAINTENANCE DURING UNIT OPERATION. ALL AIR HANDLERS WERE REPAIRED AND RETURNED TO SERVICE PRIOR TO THE UNIT STARTUP.

ICE MASS WAS ADDED TO THOSE BASKETS NOT MEETING TECHNICAL SPECIFICATION MINIMUM LIMITS. ICE WAS ADDED TO BOTH THE TOP AND BOTTOM OF THE BASKETS, REQUIRING SIGNIFICANT EFFORT IN DEVELOPING THE ICE ADDITION METHOD.

l TO PREVENT RECURRENCE A PROGRAM HAS BEEN INSTITUTED TO MONITOR AIR HANDLER AND GLYCOL CHILLER PERFORMANCE DAILY. ANY DEGRADATION IN REFRIGERATION CAPACITY WILL BE IDENTIFIED AND CORRECTIVE ACTION TAKEN AS PERMITTED BY ALARA PRACTICES. FURTHERM0RE, A TASK FORCE WILL BE FORMED TO REVIEW METHODS FOR FURTHER REDUCTION OF SUBLIMATION RATES IN ALL R0WS AND SPECIFICALLY THOSE NEAREST THE CRANE WALL. THIS TASK FORCE WILL ALSO Ei!ALUATE REQUIRED ICE BASKET MINIMUM WEIGHT REQUIREMENTS AND REFINEMENT OF ICE MASS ADDITION TECHNIQUES.

- . -. . ..- .-, --, .-. - - -