Ro:On 900412,groundwater Level Reading Taken from Dewatering Well 8 Exceeded 109 Ft Mean Sea Level Design Basis.Caused by Incorrect Level Sensor Probe Setting.Probe Adjusted Using New Setpoint Data to Cycle Dewatering Well at 108.4 Ft
ML20042G871
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/08/1990
From: Cottle W
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AECM-90-0083, AECM-90-83, NUDOCS 9005160208
Download: ML20042G871 (2)


Text

  • t y-

.i' lA

t . .

0 , u i f A? " '~!1

/SWem. Energy:':-

s v.i - ca.,ov

.PO Box 750 .

nori oeso,. us saiso ,

. , .  : lol cot 437 6809 ili William T, cottle' we nose ,

g 'May 8,71990- **>= owees <

j. : ' '

f .U.S.' ' Nuclear- Regulatory Connission 'g Mail-Station P1-13e

,WashingtonE D.C. .~20555;  ;

Attentionse Document Control Desk i' q

'1 Gentlemen: ' N

SUBJECT:

. Grand-Gulf Nuclear Station

' Unit 1-DocketINo. 50-416:

License No.'NPF-29: 4

.High. Groundwater Elevation : '

AECM-90/0083-On April 12,E1990, a groundwater l level reading takenlfrom-dewatering; we'll-8 ' indicated 109.4 feet Mean . Sea ;I.evel1(MSL): which exceeded the 109.0 feet MSL design basis ( ' The' level-. increase was; apparently1 due' to an' incorrect ll level' sensor probe' setting'.. The probe has been properly-adjusted:using new- J

-setpoint data to cycle the dewatering well pump on at'108.4 feet MSL:and off'

~

)

at 106.5 MSL.  :

A previous occurrence of:high groundwater level: elevation reported by O letter. dated April 16, 1990/(AECM 90/0062) required' temporary replacement ofi d I

a level sensor cable.- The temporary cable was replacedJon April-.20,L 1990-with an original equipment-type cable and the.well was restored 1to normal;

]j service. The. occurrence of high= groundwater elevation 11s. reported as- j

l. requested by your letter dated August'19, 1985 (MAEC 85/0284). l.

l 'An engineering study was performed'.in'1985 to-determine thel sensitivity of Grand Gulf Nuclear Station (GGNS)' Unit'l buildings to'a. maximum i

groundwater elevation of 114.5 feet MSL. The study. concluded that the 'l i

i- structural integrity of the Unit 1 buildings would not be: impaired. :This:

information was previously submitted by letter dated February 14, 1985-(AECM-85/0035). . - - -

7 i j Yours truly,-

I, d i, WTC:cg ep Q l 1f i

i l ' r}

-l GRDWATEL/SCMPFLR I  ;

900516D208 900508- 3 -

PDR S

ADOCK 05000416 PDC:~

' M =- -

-g j

y.;

eV

  • .g x- ,

- 'E

> m .

AECM-90/0083i

~

', c: Pagv2 i s

j. ..

cci- Mr. D. C.Lilintr.

J

'Mr. T.'H.=Cloninger' r

-Mr..R. B. McGehoo, I '

Hr. N._S. Reynolds-L M r. 11. - In Thomas-l.

Mr. II. ;0. ' : Christensen- <

1 L

v, lHreStewartD.Ebneter.

  • RegionaliAdministrator:

U.S. Nuclear. Regulatory Commission-l-- .Reglon~II  ; s. -

l 4

, ;101 Marietta St.,-N.E ,7 Suite-2900'-

1

" Atlanta, Georgia 30.323:

..r

  • Hr. L. L. Kintner, Project Manager

' Office'of Nuclear-Reactor Regulation

~

U.S. Nuclear Regulatory Commission _

Mail Stol i14B20-L Washington',;D.C, 20555 l.

L-1;

, j e:

(-

' y I

I s..

3,c t-e

. .n l ls

1 E

GRDWATEL/SCMPFLR - 2 i

,1 4 ,

- 5) t l'

-' ' l ,  :. i + m