ML20024C276

From kanterella
Jump to navigation Jump to search
RO 83-049/0:on 830526,halon Bottle 2 in Panel P936 Discharged Until Empty.Hourly Fire Watch Established Pending Bottle Replacement.Limiting Condition for Operation to Be Maintained.Next Rept Will Be Submitted by 830731
ML20024C276
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/24/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0363, AECM-83-363, AECM83-363, RO-83-049-0, RO-83-49, NUDOCS 8307120473
Download: ML20024C276 (2)


Text

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MIS SIS SIP Pl 3 9 2 05 C

June 24, 1983 u >C H

"" .M.7dStr"*

v '" 2 x -, c Office of Inspection & Enforcement I~ x U. S. Nuclear Regulatory Commission :p

  • as Dd Region II cm 101 Marietta St., N.W., Suite 2900 '

Cn o,.

Atlanta, Georgia 30303 c:3 g-Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-049/0 -

Halon Bottle Discharges in Panel P936 AECM-83/0363 On May 26, 1983, halon bottle number 2 in halon panel P936 discharged until empty. An inspection revealed no smoke or fire in the floor panels. An hourly fire watch was established in accordance with Technical Specification 3.7.6.4 pending replacement of the bottle and a maintenance investigation.

The halon bottle has been replaced. The Limiting Condition for Operation is being maintained until the investigation is complete and retests are performed satisfactorily. This is submitted as a Special Report pursuant to Technical Specification 6.9.2 since the Limiting Condition for Operation time limit of fourteen (14) days was exceeded. An update report giving the results of the investigation is expected to be submitted by July 31, 1983.

Yours truly, i

l .

l JPM: sap [d8T0Nd'apsfJ#'

cc: (See Next Page) 8307120473 830624 PDR ADOCK 05000416 ~

Member Middle South Utilities System Y 5CYAT' COPY' WEA2 l j 0 ,

'* AECM-83/0363 MI21SSIPPI POWER Q LICHT CCMPANY Pagt 2 +

cc: Mr. J. B. Richard' Mr. R. B. McGehee Mr. T. B. Conner Mr. G. B.' Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk l U. S. Nuclear Regulatory Commission ,

Washington, D. C. 20555 f

}

I d

-