ML20024C261

From kanterella
Jump to navigation Jump to search
Updated RO 83-027/1:on 830321,during Seismic Monitoring Sys Functional Test,Operation of Chart Recorders & Spectrum Analyzers Unacceptable.Caused by Faulty Circuit Card.Card Replaced.Sys Restored on 830519
ML20024C261
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/27/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0368, AECM-83-368, RO-83-027-1, RO-83-27-1, NUDOCS 8307120459
Download: ML20024C261 (2)


Text

"

i h MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 1640, J AC K S ON, MIS SIS SIP PI 3 9 2 05 June 27, 1983

      • v5 UMS7 '" 8 >

HC r-(n Office of Inspection & Enforcement ,

73' U. S. Nuclear Regulatory Commission --i O Region II ?m 101 Marietta St., N.W., Suite 2900 32 ajr Atlanta, Georgia 30303 m ai

++ CO Attention: Mr. J. P. O'Reilly, Regional Administrator y .

Dear Mr. O'Reilly:

SUBJECT. Gramd Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-027/1 -

Update Report - Results of Seismic Monitoring System Functional Test Determined Unacceptable AECM-83/0368 This is an update to a previous report submitted on April 29, 1983. The event for which the report was submitted occurred on March 21, 1983, when during performance of a Seismic Monitoring System Functional Test (06-0P-C85-M-0001) operation of the chart recorders and Spectrum Analyzers was determined to be unacceptable. The system was declared inoperable and a Limiting Condition for Operation (LCO) was entered in accordance with Technical Specification 3.3.7.2. This was submitted as a Special Report pursuant to Technical Specification 6.9.2 as the 30 day LCO time limit was exceeded.

Maintenance Work Authorizations (MW0s) were issued for investigation and correction. The cause of the malfunction was determined to be a faulty circuit card. The card was replaced and the surveillance was perforted satisfactorily. The system was restored on May 19, 1983. This is a final report.

Yours truly.

JPM: sap cc: (See Next Page) r307120459 830627 PDR ADOCK 05000416 ~ _ _ . , _ _

S PDR OFFICIAL COP?

Member Middle South Utilities System b

)

( . s.

  • - - AECM-83/0368 MISSISSIPPI POWER O LICHT COMPANY Paga 2 cc: Mr. J. B.' Richard Mr. R. B. McGehee Mr. T. B. Conner -

Mr. G. E. Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U, S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 6

i 4

h l

f s

  • y+ v-m re gt ,y s,. msg. pye,yg,..,eg---,, --e<* r -* r*v-evw--+- - - vt = --m-a aw-9v-~'" =- -y- e <*-i-*T*--evr7e---*i* -

w