ML20042A343

From kanterella
Jump to navigation Jump to search
LER 82-013/01T-0:on 820220,RHR Sys B Snubber GBB-3-SS-235 Removed from Svc for Testing.Caused by Snubber Pipe Clamp Rotated Out of Position & Bent Snubber Extension.Pipe Clamp Repositioned,Extension Straightened & Snubber Replaced
ML20042A343
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/11/1982
From: Van Sickel J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20042A336 List:
References
LER-82-013-01T, LER-82-13-1T, NUDOCS 8203230343
Download: ML20042A343 (2)


Text

- . _ _ -

Nac ponna saa u. s. > .aAn carutArenv coamaission G 771 LICENSEE EVENT REPORT ccNTact stocc: l l l 1 1 l l@ tet:Asa en:NT on Tv d ALL mEcuimEo inroRMATIONI lotil l IIA 10IA Ic 11 l@l0101-101010lolol_lolcl@laltlililil@l 7 4 3 UCENSEC CQCg 14 15 uCanst ~wem 29 2e uCarest rypt JG I

l@

57 car Se c0N'T lolsi $',"C[l l @l0 15 l0 !0 l 01313 l 1 @l 0 EVENr l2 ;2QArgl0 l8 l2 g p l3 l1 l1 l8 l240] g i 8 40 48 CCLX4r N6 Meta 64 .9 le 71 mePOmr QArt EVENT QESCniPTION AND PROSASLE CCNSECUENCES bio io ,,, ; During normal operation, snubber GbT-3-SS-235 on the "B" RHR system was  ;

removed from service for testing. The "B" RHR system was declared inoper  ;

io,,,,able while this snubber was out of service. With the "B" RHR system inop l

,o,3, i erable, the "B" containment spray sys. was also effectively made inop. D  ;

io psi l ue to the "A" RHR (LPCI) sys. having previously been declared inop see ( l loirj l R0 82-014). A 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LC0 was entered per T.S. 3.5.A.6. This event was f I io is i i irst classified a 30 day R0 but was reevaluated as a 14 day RO on 3/1/82. I

. , a OE CE SL C E COMPCNENr CCOS SuSCCOE Su E iot,i lS lB l @ g @ l Z l g lS lUl P j 0l Rl Tj g [D lg lZ lg

, io ,, i ,2 i. i. 2.

ta mi.0 EVENrfEAR mtPCar NC. E O /'ug" I3 12 l t

21 22 l_;

23 l0l1l3l 24 26 lA 27 l0l1l 25 29 lTI 34 g

31 l0l 22

.ou.s S ^ SOS.""I'o' ,c'"t'.. "'#.t WA' '?Cri!,! o!#6*!r 5"Te c*o" ofA",'f!#lo

[A l 0 l 0 l 0 ft l lY lg lN [g l A lg l B j 2 l 1l 0lg n gl2 Z lg lsZ lg 2 l2.Zl@ v .a .. ., 2 . .,

caust cEscarpricN ANo cenaECTIVE ACTICNS

,,;oi(The snubber was removed for testing after the pipe clamp to which is att  ;

,,,,,i ached was found rotated approx. 30 degrees from its proper position and ,

,, ,,[; the snubber extension bent slightly. The pipe clamp was repositioned and  ;

i,;3i j secured, the extension piece straightened, and the snubber replaced with l tii.i i a spare. The original snubber was tested with satisfactory results. i

, e , a s  % crwemSrAruS AV . OtSC ERY OSSCRIPDON li is i l l@ l0 lTemj6lglN/A l O'S6[gjSpecialInspecion

[ l

.Cm viry Cc'fr~r astiase

.uov~r e, *Criviry @ l l N/A toCAricN ca metaAss h lZ j l l' i i s ] lZ l @o

.c.a .,on astaase'....,c~J.,.glN/A - - "

svu.a. tv c eesCmric~@

l 8 l 7 I [0 ] O l 0 l@l Z l@l N/A l

,,,,c R l0 l 5..~.~,t' ~m

~ a .,

i0igio.,f0,A.mo~e l 7 a s i. 12 84 r G O(SCA pr C~

li I * .,

I l Z l@l ioN/A l

""' U C'?.Y.... .. h N AC USE CNLY ,

g PDR ADOCK8203230343 05000331 820311 I II;;;II,I,;,l: '

' S n "

pyg "5 NAVE os ,aEPAaEn u. .m., alcke1 awCNE: 319-851-5611

{

g DUANE ARNOLD ENERGY CENTER Iowa Electric' Light and Power Company Licensee Event Report - Supplemental Data Docket No. 050-0331 Licensee Event Report Date: 3-11-82 Reportable Occurrence No: 82-013 Event

Description:

During normal operation, snubber GBB-3-SS-235 on the "B" RHR system was removed from service for testing. The "B" RHR system was declared inoperable while this snubber was out of service. With the "B" RHR system inoperable, the "B" containment spray system was also effectively made inoperable. Due to the "A" RHR (LPCI) syttem having previously been declared inoperable (see R0 82-014), a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LC0 was entered per Technical Specification 3.5.A.6.

This event was initially classified as a 30 Day Reportable 0ccurrence but was reevaluated as a 14 Day Reportable Occurrence on March 1, 1982.

Cause

Description:

The snubber was removed for testing after the pipe clamp to which it is attached was found rotated approximately 30 degrees from its proper position and the snubber extension was found bent slightly. The cause for these two problems is unknown. These problems in themselves did not effect the system operability. The snubber was removed to verify that it was operable. The snubber is a Bergan Patterson Model HSSA-10 hydraulic snubber.

Corrective Action:

The pipe clamp was repositioned and secured, the extension piece was r

straightened, and the snubber replaced with a like-for-like spare. The snubber was out of service for approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The original snubber was tested with satisfactory results.

l l

l l

l Page 1 of 1 l

l

. . .