LER 82-022/03L-0:on 820305,HPCI Declared Inoperable When Preliminary Design Review Did Not Confirm Loose Mounting Plate on Spring Can Hanger EBB-14-H8.Caused by Degraded Condition of Red Head Concrete Expansion Bolts
ML20050D554
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/02/1982
From: Varner D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20050D550 List:
References
LER-82-022-03L, LER-82-22-3L, NUDOCS 8204120311
Download: ML20050D554 (2)


Text

u. s. Nuct.sAs nacutArony CommissacN N:c Porm :ss mm LICENSEE EVENT REPORT ccNTRoi. accCx: I l l  ! I l I Pt.rAsa paint on Tv 4 ALL nEcuisEn iNPo: MAT 1oNi i e@

,lo lil l IIA 10 lA lC l1 l@lO!Ol-l010]Ol0l01

  • , 4 , ucausas coca i4 is ucanu mwna lol0I@l4lilil!lil@l a a uctua rves a l

si ca r s. @

l CCN'T lolil 7 8 7m"c'60IL @Sil0 15 l0 l0 101313111@l cocCET Nuuegn 64 69 01310151 EVENTQATE 81 3.2'@l 014101 7s P EPOAT QATEPl 8121@ 4.

EVENT oESCRIPTION AND PROSA8t.E CCNSECUENCi$

lo 121 l During normal operation, llPCI was declared inoperable when a preliminary I go,3, l design review did not confirm that a loose mounting plate on sprino can I rot 6 1 I hanger EBB-14-H8 would not adversely affect the operability of HPCI. HPC I

g i I steam supply valves closed and system depressurized. 7-dy LCO was ent I 10 la 1 l ered per TS 3.5.0.2. Desion review resnitod from previonsiv identified n I la i 7 I I onconformance. Further review revealed that EBB-14-H8 was not required f I g o ,s i l or safe operation of HPCI. Not repetitive occurrence. 80 I

7 8 9 '

SoTe" *le'c" sSc5: ccunoneMrcoes su ai"c'e's sMEU.

loi91 lC I F l@ l E l@ ! B l@ ! S l U l P l 0 l R l T l@ LAJ@ LZj 20 r . 9 to ii 2 3 is is sScuG~TIAt CCCUAAENCE mtPCRT 80V8siCN tt nimo (VENTVEAR REPCmf MO. Cees rvP* NO.

O ,ag _vI812lu u

l_I n

I of 21 21 2 a Ld n

IoI3I n n IL!

u l-I v

[0j n

f2'f' ?cW# e!!!U,ir '""#%*o' , ou.s G 's?.T"G' ,c'l3'.. "s!",k?.7 of "l?!4"le.

IX!@lDl@ IZ IZ l@ 101010i41 L.YJ@ l N i@ ! Al@ l. B l 210 l 91@ l n 2. n l@ a v 2 2 CausE oEsCRIPTICN ANO CCARECTIVE ACTICNS h li t a l i The loose mountino plate on FB4-14-H8 caused bv daaraded condition of "R I li t i l l ed Head" concrete exnansion bnits. A tomnorary Mnerex inctallod noar 1 i e i 2 [l EBB-14-H8 using "Hilti" concrete expansion bol ts. After this installatio I gil31 l n, HPCI was functionally tested satisfactorily and declared operable. ER I t i t i l B-14-HR will be repaired. Desian review of anchor bolts olanned.  !

' 00 i 3 a 1

$ A$ %PCwfR CTwem s?ATVs 5 A Ot CCVERV Q4semiPT10N

[TTi1 U@ l II 01 Ol@l NA l [Cj@lSpecialInspection [

" " a

'.! noir, ce'f res, i.ocnicse,.:trise@

. eta.seo on .etaase ".uousr e, cnvery @ " ,

l l NA I I NA i l

l li 181

' . .. 17. s o~~'.1 su,,.. .

l@ , . .c. l 71@ Sis ev.,

l W *10 10 10 '

so~~.'t ,wu'.', e s l@l"l NA Z l@o.sc...nc~@ "

l l ,i

~vu.e. casenetto~@ '

i

i. I i 4 101010l@lNA ,, n n l 'O'. " " . s'"'.Vo'~ '"" @

l l

t 9 d@l NA i.

j 8204120311 820402 N AC USE CNtv g 000 ,

,,,,,,,,,,,,g}

David M* varner PwCNE: 319-251-5611 I*

I N AVE OF PR(P A AER l

DUAllE ARil0LD EllEP,GY CEllTER Iowa Electric Light and Power Company

' Licensee Event Report -Supplemental Data Docket flo. 050-0331 Licensee Event Report Date: 4-2-82 Reportable Occurrence flo.: 82-022

~

Event

Description:

During normal operation, the high pressure coolant injection (HPCI) system was-declared inoperable when a preliminary design review did not confirm that a loose mounting plate on spring can hanger EBB-14-H8 would not adversely affect the operability of the HPCI system. The HPCI steam supply valves were closed and the system depressurized. A 7-day limiting condition for operation (LCO) was entered as required by Technical Specification 3.5.D.2 for an inoperable

- HPCI. The hanger is located on the HPCI steam supply line. The design review was being conducted as a result of the hanger mounting plate problem having previously been identified in a nonconformance report.

Further review of the design of the HPCI system revealed that failure of spring can hanger EBB-14-H8 would not have adversely affected the operability of the HPCI. This design review concluded that in the event of the ultimate failure of hanger EBB-14-H8, the HPCI system has sufficient capacity to absorb the additional load without excess stress or unacceptable deflections. As a result of this conclusion, HPCI was declared operable again after approximately 1.4 days, concurrent with the installation of a temporary hanger near EBB-14-H8.

There have been no previous similar occurrences.

Cause

Description:

- The loose mounting plate on EBB-14-H8 was caused by the degraded condition of the " Red Head" concrete expansion bolts.

l' Corrective Action:

i A temporary hanger was installed on the HPCI steam supply line near EBB-14-H8 using "Hilti" concrete expansion bolts. After this installation, HPCI was functionally tested satisfactorily and declared operable. EBB-14-H8 will be ,

repaired and the temporary hanger then removed.

A design review will be initiated to determine if the problem with mounting '

plate EBB-14-H8 has generic implications.