ML20039H243

From kanterella
Jump to navigation Jump to search
Forwards Outstanding Issues list-BSAR-205
ML20039H243
Person / Time
Site: 05000561
Issue date: 06/06/1971
From: Cox T
Office of Nuclear Reactor Regulation
To: Happell J
BABCOCK & WILCOX CO.
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8201190761
Download: ML20039H243 (3)


Text

< -....,

~'

u=n. n.n.

IfuCLEAR CEGULATORY CO.edlSSH)N

....u..v.... c.

301-492-7000 FACSINILE SDtV1CE REQUEST d-4 2)

\\

NA!-/d7ppezL e TO:

Fofs3P4 -7773 ucarr suMRER:

mimes g

so dog-381-67// v a74L unCAT1am seen i

8 W FAGES P FIRS 1RFIRUCT10lt EZET A. 2.fAlC8/3df 6,

' ATE & CITYW Ps II FRCH:

/Gr I L dX i

301 4 92-8110 RAPIFAx ADTcNATIC

  • LEcoFY smsER 301 4 92-7617 3g ygg 4pycug72c 301 4 92-7371 ERIFICATICs suMBER 71 2 P

OFFICE F501E M243 NAIL STOP

/17 I

i i

4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 2 hour IASS OF SERY1CE:

Overnight Y. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Ismediate

{

AL INSTRDCTIONS:

)

I r

l Transmitted / Time Dste l

Received / Time-Date i

I i

l i

[0.*

g..

(

'G l

'~

.m:;-?,i_ ;,, ;.

l

' = ' ~ ~' -

l l

l l

l I

8201190761 810403 PDR FOIA MADDEN 80-515 PDR l

f 0

cnufoof 17

$keet / r2%

~

OUTSTANDING ISSUES LIST - BSAR-205 Section in Report to ACRS Issue 3.2.1 Quality Group classification and seismic category of certain boron recovery system components 3.6.1.2 Seismic qualification of mechanical equipment - compli-ance with Pegulatory Guide 1.100, March 1976.

4.2.2 Structural materials welds - our reauirement that delta /

4.2.3.2

{errite content of weld metal be measured by magnetic

\\

devices.

Pass / energy release data, for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after break, for 6.2.1 LOCA breaks, for containment shell design.

Includes sensitivity study on effect of different ultimate contain-ment pressures.

Mass / energy releases for containment subcompartment design; and noding study to justify method of ' calculation.

Small steam line break analyses and justification for same.

6.2.2 Environmental qualification program - must commit to conservative qualification test temperature or commit to qualify to temperature determined by an applicant.

7.1 Comoliance with IEEE-323-197_4_- confirming test results for some componenets used to isolate Class IE from non-IE equipment - we require commitment to document test data one year prior to FSAB from any applicant referencing BSAR-205.

7.8 Compliance with IEFE-323-1974 - for makeup pump and decay heat removal pump motors - we require that B&W specify, as interface data, that B&W has elected the " ongoing qualifi-cation" option and that compliance with Std 323-1974 will require periodic testing, including seismic qualification testing.

6.3.4 6CCS - we require demonstration that worst case break has been used in analysis.

6.3.4 HPI line break - we require that B&W analyze consequences and necessary operator actions.

os/o./77 su a.o

_2_

15.4.1 Anticipated transients - Moderate Frecuency Events - B&W must demonstrate that non-safety grade eculpment action is not necessary to meet applicable limits on system pressure and to prevent fuel damage.

15.4.2 Turbine Trip Analvsis - B&W must perform analysis at 3876 mwt and demonstrate that applicable pressure limits are not exceeded.

15.4.7 Baron Dilutien Event - Additional information is required to show that current analysis accounts for presence of makeup tank bypass line.