Requests Implementation of Proposed Schedule for Supplying Emergency Preparedness Exercise Info to Nrc.Schedule Includes Description of Exercise Scope & Objectives to Be Submitted 75 Days in Advance of Exercise
ML20039G802
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/13/1982
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
References
TAC-46275, NUDOCS 8201190159
Download: ML20039G802 (2)


Text

..

y m

r

?.

/.

/-

f

. ;t>

f 1

l January 13, 1982 i

l c

A M

Docket No. 50-344 g

IG O?ll 3 ;002h ~ '

ET Portland General Electric Company

~

  1. 1 4' p *~

121 S. W. Salmon Street' Portland, Oregon 97204 1

Attention: Mr. Bart O. Withers irc Vice President Nuclear Gentlemen:

SUBJECT:

EMERGENCY PREPAREDNESS EXERCISES As you are aware, the revised energency planning rule published August 19, 1980, requires that emergency preparedness be upgraded and maintained at i

and around nuclear power plants. Part of the maintenance process is a requirement in Sections IV.F.1 and 3 of Appendix E,10 CFR Part 30, for periodic exercises, some of which must include offsite participation. In addition, a fullscale exercise must be conducted before any new license can be granted. The NRC will provide observers for the onsite aspects of these exercises and will

.review the proposed scenarios.

Although we originally believed that the two weeks prior to an exercise would provide sufficient time for us to review a scenario for adequacy (1) in terms of scope (testing of major areas of response) and (2) in ter:::s of response for major portions of offsite plans; we now recognize that this anount of time is not adequate to ensure a proper review and any required coordination. Therefore, we are requesting you implement the following schedule for supplying exercise information to the NRC.

Period in Advance of Exercise Infomation to be Submitted l

75 days Description of scope of exercisa and objectives to be fulfilled 45 days Detailed description of exercise scenario and anticipated licensee actions 20 days Complete controller / prompter packages which contain the information to be supplied to the observers for the exercise along with that supplied to 8201190159 920113 the exercise players as the scenario PDR ADocK 05000344 is unfolded.

ii 3

PDR p

i i

"**!...Rv/datu

... W...... < [

..... 3//............ M..

........................, 5 )ifJ...

su=~cp "FISR%:f-WENSLAWSKI B0 K' 3 PENCER ENGELKEN" " " ~

~""""""""

" ULT /82"' T/13/52"""" ' '1/$5f""" ""Y/iy{"' g/[3[82

,4

...................g......

sac reau sie no.somacu o:4o OFFICIAL RECORD COPY "5* *-2:*42

.e=

4m e-4 4

--ieewh*

m

,--,w-

-w

Partitr4 Geraral Electric Campany.

I Since planning must occur well in advance of the exercise date so as to provide time for necessary coordinatien with State and local governmental agencies, we do not believe meeting this schedule will be an added burden.

This schedule should also provide for the maximum number of objectives being I

attained by all participating parties.

The information should be mailed to the Regional Administrator, USNRC, Region V, at the above address. A copy of the first two iter.s only should be sent to 3rian K. Grimes, Director, Division of Emergency Preparedness, Office i

of Inspection and Enforcement, U. S. Nuclear Regulatory Commission, Washington, 0.C. 20555. For those licensees whose exercise is scheduled to occur socner than the above time scale, please provide Mr. Ray Fish (415-943-3761) of this office with a schedule for submission of the requested information as soon as possible.

This request for information has been aoproved under OMB Clearance No. 0150-0011 which expires April 30, 1982.

Sincerely, LY;C2!"5'rnC!?

2. & bgelke l

R. H. Engelken Regional Adninistrator l

cc:

Tom Walt, PGE bec: DMB/ Document Control Desk (RIC3)

Distributed by RV:

00E (Godard)

Resident Inspector RHE i