Forwards Draft of Revised 791204 Radiological Emergency Plan, Incorporating Corrections & Additions
ML19256G027
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/19/1979
From: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
To: Harold Denton, Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19256G028 List:
References
TAC-46275, NUDOCS 7912270269
Download: ML19256G027 (2)


Text

-

J,,r-, Po:U: d Genaml Electric Ccawny i

. E::

Laua r,

}.-

3,,, e

'~-,.e December 19, 1979 Trojan Nuclear Plant Dceket 50-344 License NPF-1 Radiological Emergency Plan Director of Nuclear Reactor Regulation ATTN:

Mr. A-Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

On December 4,1979, we forwarded to you a draf t copy of the revised Trojan Radiological Emergency Plan. As the result of further review of t'.iis document, a number of corrections and additions have been made.

These corrections are hereby forwarded to you as replacement pages for insertion in the Plan.

In addition, in the December 4 letter we stated that a letter from the State of Washington discussing plans for future revisions and updating of their emergency plan would be forwarded by separate correspondence. A copy of this letter is included in this submittal for insertion at the front of Chapter 3 of the Plan.

In addition to the above corrections, the following items contained in the PGE Radiological Emergency Response Plan for the Trojan Nuclear Plant need further clarification:

1.

Plant ceteorological instrumentation is not currently on a vital power bus, as stated on Page 7.3-1.

A design change to this effect has been approved and we anticipate that it will be implemented by the end of the first quarter, 1980.

2.

The dedicated telephone communications link between the Trojan ECC and the State and local EOCs described in Section 7.2 is not currently in place; the equipment is being ordered and we anticipate that it will be installed by the end of the first quarter, 1980.

1643 047 AoM h

h 7012270 g

,j,

~

Podbad Ganual Bedric Ccapr/

Mr. A. Schwencer December 19, 1979 Page two 3.

The common radio communications link between the FGE, Oregon and Washington field monitoring teams shown in Figure 7.2-1 is not currently in place; we anticipate that this will be accomplished by the end of the first quarter, 1980.

We will inform you of any changes in the above schedules.

Sincerely, C. Goodwin, Jr.

Assistant Vice President Thermal Plant Operation and Maintenance CG/TDW/SGG/4mg10A4 Attachments c:

Mr. Lynn Frank, Director w/ attach State of Oregon Department of Energy Ms. Betty McClelland, Director w/ attach State of Washington Department of Emergency Services Harold H. Denton, Director w/ attach Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comnission Tom McKenna (5) w/ attach Emergency Preparedness Task Force Arthur Desrosiers w/ attach Battelle Pacific Northwest Labs 1643 048

.