LER 81-038/03L-0:on 811030,following Reactor Startup,Drywell Oxygen Concentration Not Reduced to Less than 4% within 24-h of Mode Switch Being Placed in Run.Caused by Inoperable Auxiliary Boiler Feed Pumps
ML20038C189
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/25/1981
From: Schmich A
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20038C187 List:
References
LER-81-038-03L, LER-81-38-3L, NUDOCS 8112100238
Download: ML20038C189 (2)


Text

_. _ . . _ _ _. ._ _ _ --

NaC acam ses u.s.muctan ResuLarzy commissoa mm.

,' LICENSEE EVENT 7EPORT cCNTROL SLOCIC: l i

l l 1 ] I Ih (PtgAsg PalNT OR TY*d ALL REQulRED INPQRMATIONI lolil 4i IIA 7 9 loUCENSEE IA lcCOCE 11 I@l 0101 -l 0101 is is a l muuSEM uC4pss4 alal 101 c l@l20 4 l uc1%34 2S i 111111 TYPt 40 l@l37 GAT l se l@

CON'T IoIi! E' "c' LLj@l0 15 10 f0 1013 I 311 64@l GG110 lEVENT 310I 81 11@l1 OATE 78 75 11 12 I 5 I 8 l 140l@

mEPORT QAf t i 8 60 El CCCKET NL Sem EVENT DESCRIPTION ANO pmC8ASLE CONsECUENCES h io i 21 l During normal operation following reactor startup the drywell oxygen con l io ,2 # I centration was not reduced to less than 4 percent within 24 hrs of the m  ;

ici4i tode switch being placed in run as required by T.S. 3.7.A.5 and the prope I ta#siir D/W to sup. chamber D/P was not established per T.S. 3.7.A.7. Inerting  ;

Io !6 l l Was in progress at the tine with D/W oxy. con. at 11 percent. A 24 hr. L 1  ;

l a i 71 i CO was entered. Proper oxy. con. and D/P established within subsequent 5 I i o s a i I hrs which ended L.CO. Repet tive for oxy. con. (See RO 79-3 and 77-38). I

'7 g g 80 t ca sb C E COMPCNENT CODE sLSCCC'E su OE lo191 l SI El@ [,,1]@ l Bl@ l Pl Ul Ml Pl Xl Xl@ IB l@ l Z l@

7 8 9 io in 12 i3 is is 20 SECUG4TiAL OC ummtscs merent nevrsics tgermo (VENTVEAR AtPQAT 40. COCE TvPt NO.

O" yy aE 1811 l l-l l Of 31 81 l/l 1013 l lL l [,,_J l 01 v n n 2 n v a a 2a 2 n

== a's va~ .oe.s wismir ,;; =.. T,e,r ..e,r.cz.,

LO.j@l.l.J@

n 2 LBj@

23 la7 l@ v lo lo lo @10 .a l Yl l@ lNl@ l Al@ lI101715l@

.i o .,

2 2 causE cEsenisticN ANo c RatemvE AcTicNs @

ii io l l D/W was not inerted in tirre due to the aux boiler feed numos beino inop. I litiIiThe auv boiler is used to haat the nitronen vaporizer used durino cont. I t i i 2 I I inertino. D/W to sun, chamber D/P cannot be established while inertino is i tii3i i in orooress. Aux boiler F/P renaired. Cont. inertino subsequently comple i li64 il ted and 0/W to sun. chamber 0/P established. No add. cor, action planned. I 7 a 2 ea

$rA %PowfR CTwemSTATus cas my CisCcVemy ogscmiPTicN l' i s l l C l@ l 01 I l 4 '*l@l "NA l l A l@l 0perator Observation l

' .jriviry ce'Er~r

aet:4se tocArien e, met:A @

. oumr ee .criviry @ l l NA W l NA l li ie I W @o esaetsise' w ueen tv c cesemiericu@

.s.scu~'d e.@esi lies l i I 7 l l OI OI Ol@[2.,J@l NA l es a scu~ e't .~;u'a'is s

~uue<= casemieric~@

l'idlI0101Ol@lNA 7 e 9 is i ,,

l

'M*: ' " i s'c".'"r'e'~ ' " @

l ' l 3 I [, Zj@l NA l 7 e $ io 8112100238 811125 ,

'v e t ic'"

PDR ADOCK 05000331 NRc USE CNLY issuno casemieriomQ.5 3 PDR .

12 i o f l Uj@l NA l l ll t!lll l ltiIi?

7 8 9 10 48 89 84. h NAME CF PaEPAAER Arnold W. Schmich awCNE: 319-851-5611 *

, DUANE ARNOLD ENERGY CENTER Iowa Electric Light and Power Company Licensee Event Report - Supplemental Data Docket No. 050-0331 Licensee Event Report Date: 11-25-81 Reportable Occurrence No: 81-038 EVENT DESCRIPTION During normal operation following reactor startup, the drywell oxygen concentration was not reduced to less than 4 percent within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the mode switch being placed in run as required by technical specification 3.7.A.5 and the proper drywell to suppression chamber differential pressure was not established per technical specification 3.7.A.7. Inerting was in progress at the time with drywell oxygen concentration at 11 percent. A 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LCO was entered. Prior to entering the LCO, the reactor power level was reduced and the reactor mode switch was taken from run to startup with the intension of proceeding to cold shutdown if proper oxygen concentration could not be established. Proper oxygen concentration and differential pressure were established within the following 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, ending the LCO. There have been 2 previous similar occurrences of not meeting the oxygen concentration requirement (See RO 79-3 and 77-38).

CAUSE DESCRIPTION The drywell was not inerted in time due to the auxilliary boiler feed pumps being inoperative. The auxilliary boiler is used to heat the nitrogen vaporizer used during containment inerting. The drywell to suppression chamber differential pressure cannot be established while inerting is in progress.

CORRECTIVE ACTION An auxilliary boiler feed pump was repaired. Containment inerting was subsequently completed and the drywell to suppression chamber differential pressure was established. No additional corrective action is planned.

Page 1 of 1 J