Nevmber 15, 1979
Docket No. 50-498/79-19
50-499/79-19
>tlMORANDUM FOR: File
,
IliRU :
W. C. Seidle, Chief, RC6ES Branch
FROM:
W. A. Crossman, Chief, Projects Section
Sl? BJ EC~ :
AlIICA~ ION $ OF l'.11HIDAT1CN OF C1YIL QC INSPEC70RS
AT SOUnl TEUS PROJECT (sip) DS 50-498; 50-499
-The SIF Fasident Reacto'r Inspector (RRI)-called me at my home on Novenber 2,
1979, at approximately 6:30 p.m. to report alleged intimidation of five Brown
and Root (B&R) Civil QC inspectors.
Two B6R Civil QC inspectors entered the RRI's of fice at about 4 : 4 '.
shif t) on Friday, Novecber 2,1979, and one, the spokesman, stated $p.m. . (af ter
was
changing jobs and wanted to tell the RRI that he and four o'her Civil QC
inspectors had been threatened and raceived extrece intimidativa f rom S&R
f orecen and general foremen. The majority of the threats were made during
the course of concrete place: rent activities including meetings, preplacement
and placement inspections. The spokesman further stated that
was threatened'
with words like, "I'm gonna hit you with a vibrator."
-
The spokesman alco related an incident during a t;ecting where a foreman " chewed.
. out" two QC inspectors in f ront of , the QC supervisors and the QC supervisors did
not even -try to defend the QC inspectors, g said in ef fect .thet none of the
QC supervisors nor QA managers had any " guts and would not stand up to the
B&R construct. ten managment.
(lle didn' t use the word " guts".)
Iso told the FAI that his of fice was in a poor location, hsaid none of
the peopic would 'come see him during working hours becausegwas "right under
the nose" of Ilouston leighitng 6 Power. Company personnel.
The RRI voiced concern that such r.onditions exist on site.
(There have been
too man like allegatiens.) gatatedthat the QC inspectors are an extension
of
if forts and is of the opinion that any interference with their inspection
is a hinderance to NRC objectives.
The spokesman lef t the names of the four other QC inspectors who are villing
-
to teake statenents to the NRC.
+
,
,(
,:
-
-'
in a; Z ,, . .n.) M NLM N I]iU=0
if
Ac{, CMmpliMS ___
exp. fo -BA /
=r
9103260362 910314
l
'
KOURY90-361
.. ..
- ..
- _
_ _ _ _ - _ _ _ _ _
-
-
-
..
.
._
.-f
-
- . ;c
wile - Docket No. 50-498
50-499
-2-
Sc'v mber 15. 1979
-
,
t
,
The yC inspector who accompanied the spokesman would not identify himself.
The spokesman identified a concrece superintendent who made several of the
threats ar4 in'.imidations,
b
W. A. Crossman, Chief
Projects Section
P
'
ces
11. S. Phillips
W. G, llubacek
R. K. llerr
.
C. E. Wisner