Partially Withheld Memo Summarizing Telcon W/Former Employee Re QC Inspector Being Assaulted at Plant
ML20029C166
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/27/1979
From: Crossman W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20029C132 List:
References
FOIA-90-361 NUDOCS 9103260349
Download: ML20029C166 (1)


Text

_.

.g["%Q'o, t'ilto!#Att$

t NUCL C AH ktCULo10AY COMMib580N

'e',3,,

n t G10N IV

w I-f/1 hYAN Pt.M6 DRIVE. Sutil 1000

[

ARtlNG10N, Yt X AS 76C11 gw /

g April 27,1979 Docket No. 50-498 50-499 P,EMORANDUM FOR:, file THRU:

. C. Seidle, Chief, RC&ES Branch FROM:

W. A. Crossman, Chief, Projects Section

SUBJECT:

TELEPHONE CALL FROM A FORME 3

EMPLOYEE IN REUP0 TO A QC INSPECTOR BLING ASSAULTED AT THE SOUTH TEXAS PROJECT DN 50-498; 50-499

~

fo mployee contacted me at approximately 8:00 p.m. on to inquire if I had heard about the QC inspector at the TP site being struck by an engineer af ter he refused to sign off on a

' Pour Card because of deficiencies concerning the concrete placement.-

hstated thatMnew that the NRC was on site and' wanted to know if we

'.(the NRC) knew' about the in

t. D related the incident to me and told me:the QC inspector's name, tol'd me'the-QC inspector was struck three times and did not-fight back, he incident was witnessed by other QC per-sonnel.

The employee asked me how many more QC inspectors would have to be " punched out" or fired before the NRC could or would take any action.

I told W that if we, the NRC, could substantiate that the act was an act of thtimi-dation and it interfered with the QC _ inspector's decisjort regarding quality of. safety related. construction, we could take action. (gvoiced the. opinion-that the nurter of firings and assaults on the QC inspectors indicated to Mphat Civil QC inspectors were being intimidated.

h're investigating the problem.

eemed satisfied that there were NRC inspectors at the site and that they

.we W km

'W. A. Crossman, Chief Projects Section -

cc:- W. G. Hubacek C.:E._Wisner Infoirulba !:: th,

y g..,,

10acco:Qu m,, ; ;L J

E0lA. f g g g j _ g j J,y,, { ~

Act, exca4;;ons g P,

9103260349 910314 PDR FOIA

-KOURY90-361 PDR

,,9 f

,