ML20029C162
| ML20029C162 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 01/24/1979 |
| From: | Crossman W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20029C132 | List:
|
| References | |
| FOIA-90-361 NUDOCS 9103260340 | |
| Download: ML20029C162 (2) | |
Text
_ [, u c q"#o v
U%t)( D $1 A115 NUClt AR hlCULA10HY COMMIS$10N
['
) -. $
P/
Rf oloN IV 4
}
611 RYAN Pt A2A DRIVE.5Ulit 1N0
[o
/
ARLING10N,1(X AS 4011
/
Janua ry 24, 1979 Docket No. 50-498 50-499 4
l MEMORANDUM FOR: file TliRU:
W. C. Seidle, Chief, RC&ES Branch FROM:
W. A. Crossman, Chief Projects Section
SUBJECT:
IELEPHONE CONVERSATION WITH A FORMER EMPLOYEE REGARDlhG ALLEGED FORGERY AND FALSlfl AI ON Of QC RECORDS Al THE SOUTH TEXAS PROJECT 1 received a telephone call from a formerhh employee at approximately 7:50 p.m. on Monday, Januar 22, 1979, ' ntended to provide more detailed infonration concerning
. previous allegation of forgery and falsification of-QC records a the South Texas Project.M The-formc6 initially stated that individual "A" and indi-vidual "B" had been assigned to the document storage vault to " straighten out" QC records. gsaid that the Cadwcld records-are "all screwed up" and there. is much whiting out" and signing off of Examination Checksheets (ES) and as-built drawings, statedihat individual "A" probably has the folder rnentioned al n
all 'of January 19. 1979 or it may be in the Cadweld field shack-
.on e south side of the f uel Handling Building, Unit No.~ ~ 2.
The former B&R employee gave the.following specific information in regard t_o malpractice in-documentation of Cadweld inspection:
.Cadweld 51V181-This Cadweld was inspected by individual "C."
There was N0 prep-aration inspection performed but the EC was initialed sometime later by individual "D" with individual "C's" initials to reflect--
. preparation inspection.as being " satis factory. "
.T/ Memoranda f'or file dated January 24. T19T9 in regard to telephone
- conversations with same alleger on January 13 and 19,1979.
hiformatbn b tP re:cd we Mtg
_ q.
[
r
_.g y., " g-F--
s.
Filc - DN 50 498;:50-499 January 24. 1979 4
7
_4.
--(QC :inspec%orsl stay so far behind in Cadweld inspection t The foni.e employee said that individual "C" stated that they
=
- are-only able to inspect the Cadwelding operation during firing and final inspection.
Individual "0" then goes through the ECs, enters ad"S" for satisfactory in some of 5e Cadweld preparation inspection
- columns and initials with the applicable inspector's initials.
32H687through32H698(sameCadwelder)
, Individual "C" did the ins the-exception of-a couple p_ection on all of these Cadwelds - and with -
g.did not perform the preparation in-spection.- Initials appearing in t F preparation inspection column
- of the EC should be compared with individual "C's" initials to-verify
-authenticity.
Y =w~
W. A. Crossman, Chief Projects Section cc:
W. C..Seidle
-W. G.' Hubacek:
-C. E. Wisner f
I
+ +. jr..