Partially Withheld Memo Summarizing 790113 Telcon W/Former Employee Re Malpractice in QC Organization
ML20029C161
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/24/1979
From: Crossman W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20029C132 List:
References
FOIA-90-361 NUDOCS 9103260336
Download: ML20029C161 (2)


Text

'w t'ait D v1 A1( $

/ p *.e NUCL E Ah ktGUL A10RY COVW$$!ON

[.

'e-R E GION IV

lA4,

$.37, G11 AYAN PL A Z A DRivt,5Ulf f 1000 1

,A f

ARLING1 CN,1( X AS 76011

%;p y

e p

06nt,a ry 24,19 79 Docket N. 50-498 482 MEMORANDUM FOR:

File THRU:

W. C. Seidle, Chief, RC&ES Branch FROM:

W. A. Crossman, Chief. Projects Section-

- TELEPliONE CONVERSATION WITH A f

SUBJECT:

EMPLOYEE IN REGARD TO QC PRACTICES AT TH AND SOUTH TEXAS PROJECTS 1 received a telephone call from a fome at 9:00 p.m..on January 13, 1979, regarding malpractice in the QC organization.

(See investigation Report No. 50-498;50-499/78-12)

M'e same as they had done at Sout'n Texas, alleged that' they were falsifying Cadwel "as-builts" at Wolf Creek

-th said that when the Cadweld numbers were identified on the "as-bujlt",

ey were not sure that the numbers were in-the-proper location. Sfurther stated that the as-built drawings were filled-in after concrete w'as placed and there was no way of 1anyone checking-the validity of the Cadweld locations.

In regard to Cadweld inspection at Wolf Creek,M said one man was re-sponsibk for identifying the Cadwelds as to their location and when that.

Iran was-sick, no one paid the requirement any attention. - Consequently, 1

-when it came time to locate and identify the specific Cadwelds on the as-built drawings, they were " pencil. whipped" in, heent 'on to also allege that wher preplacement inspectors found things i

out of tolerence and wouldn't sign the pour card, the superintendent would sign the card and the placement-would proceed. Mould pinpoint this activity somewhere around the second week of October 1978 and said a re-view of the preplacement records signatures should show this.

IDI0rr03U00inhj;r;__y;,yj

}l In 2CCGTd:Tf; \\;L b [,c;;;g d yg Act, cxernyG:ns _ 4 1 - y /s)g;,.-- ~

u.

E0l k Y o - % )

~'

9103260336 910314 PDR FOIA KOURY90-361 PDR

file - DN 50-L98; 50-499 51N 50-482

-2 January 24,l{79 In regard to the South Texas Project.hotated that rany of the Civil QC inspectors would tell of rolpractices 3t the site if they had pro-tection. /

said that the inspectors kncw that the NRC had no authority to protect them, so therefore they would not talk to the NRC inspectors /

investigators.

Walso stated that the South Texas Civil inspection checklists were stacking up and there had been no as-built drawing entries since October 1978.

The alleger stated that Mwas no longer working at the Wolf Creek Pioject.

M w.+ovn e ~

W. A. Crossman, Chief Projects Section cc:

W. C. Seidle W. G. Hubacek C. R. Oberg C. E. Wisner E