ML20029C141

From kanterella
Jump to navigation Jump to search
Partially Withheld Memo Re Allegation Received Concerning Wrongdoing at Plant
ML20029C141
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/08/1980
From: Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Seyfrit S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20029C132 List:
References
FOIA-90-361 NUDOCS 9103260254
Download: ML20029C141 (2)


Text

-...

.~,

_ ~ _. -..

[ej 58%o, UNIT [D $1 AT E S

.:' Ne -

NUCLE AR REGUL ATORY COMMISSION j

i'#'

y-g -

W ASHING T ON, D. C, FM%

.(..v,/

MAY 8 1980 MEMORANDUM FOR: Karl Seyfrit Director, RIV l,

4 i

FROM:

- Dudley Thompson, Executive Of ficer for p3.'

i

,p, Operations Support, IE

SUBJECT:

ALLEGATION'RE SOUTH TEXAS PROJECT (STPh'"'

.l As you are aware, the recent investigation into the at STP was initiated as-a result 6f Our p one con-vers n with I ator Baci on April 19 mentioned t

some nfo on, which M

might e of interest to the NRC.

This infoma-tion.is being referre

. gion IV for appropriate action.

The' infonna tion discussed with Investigator Baci also relates i

to STP and has-to do w th a machine known as a par Device (Model ISI-2),

which is used for in-service inspection of-reactor pressure vessels.

It is manufactured by the Programs and Remote Systems Corporation of St. Paul :

-Minnesota.and perfonns examinations of vertical and horizontal welds within the readtor pressure vessel.

.According to" approximately one year ago, an individual s hired L

on a. consult ng-basisit evaluate the accuracy of the par Device. '

per-formed a number of-studies and reportedly detennined that the accuracy of the instrumentLwas substantially off (1/2 inch to 2 1/2 in hes). The consultant's stud'rwas st pposedly t Mand 5as never enninated wher, an i estigation called back 4

laims that the individual came

-the,hlm}Th"thisinformationand'tha is'now in possession of all to data from theLtests perfonned on he par ce.

% sta'ted that has the infonnation for'about a' year but wasn't sure wh to.do with t.-

said that shortly.after received the=infor-

mation, attempte ca Roger Mattson at:NRC bu

.t as Mattson was tied and ver< called back.

Somethi else came u and aid that:

forgot about.the ma er until now.

l' l -

CONTACT:

P. Baci In orm Hon in this record was deleted in accordance w,th the Freedom of Information 1

-49 27246 L

L Act, exemptions _f> # 76

[l F0IA-70-54/

9103260254 910314 PDR FOIA l

KOURY90-361 PDR

-~

/

MAY 8 l930 Karl Seyfrit 2-As this information was not gentane to the other investigation.M

- was told t it would be referred to the appropriate NRC office for follow up and that would be contacted at some future date.

b iIdIh

/

Y 0

Executive Of ficer for Operations _ Support. IE

. cc:

W. Ward. IE s

v.*.

j 6

e t

l l'

l

}

I