AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-368 UNIT 2 DATE 7/15/81 COMPLETED BY L. S. Bramlett TELEPHONE (501) 968-2519 510Nm June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 01We Net) (MWe-Net) 1 0 17 0~

2 0 18 0 3 0 $9 0 4 0 20 __

0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0

10 0 26 0 11 0 27 0 12 0 2g o 13 0 29 0 14 0 30 0 15 0 31 N/A 16 0 INSTRUCTIONS On this format.hs the aveuge daily umi pimer leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

1 (9/77)

~

' 8211150436 810715 PDR ADOCK 05000368 PDR R

OPERATING DATA REPORT DOCKET NO. 50-368 DATE 7/15/81 COMPLETED Hy L. 5, Bramlett" TELEPflONE lbul) 966-2519 OPERATING STATUS N"

I. Unit Name:

Arkansas Nuclear One - Unit 2 June 1 - 30, 1981

2. Reporting Period:
3. Licensed Thermal Power (MWt): 2815 _

942.57

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

912 097

6. Masimi.m Dependable Capacity (Gross MWe):

858 ;__

7. Masimum Dependable Capacity (Net MWe).
8. If Changes Occur in Capacity Ratinp (Items Number 3 Through 7) Since Last Report.Give Reasons: -

NONE (Net MWe): NONE

9. Power Level To Which Restricted.N If Any/A
10. Reasom For Restrictions. If Any:

i This Month Yr.-to Date Cumularise {

720.0 4343.0 11087.0 -

l1. Ilours in Reporting Period 24.9 1992.9 7023.7

12. Number Of liours Reactor was Critical 859,5 0.0 54.9
13. Reactor Resene Shutdown llours 6868.2 0.0 1952.2
14. Ifours Generator On.Line
15. Unit Resene Shutdown liours O*C M _O.O M 7KOM_

0.0 5094885.0 16939047.0

16. Gross Thermal Energy Generated (MWii) 5506490.0 0.0 1673589.0

' 17. Gross Electrical Energy Generated (MWil) 0.0_ 1599905.0 5247102.0

18. Net Electrical Energy Generated (MWH) 61.9 0.0 45.0
19. Unit Senice Factor 45.0 0.0 62.6_
20. Unit Asailability Factor 0.0 42.9 55.2
21. Unit Capacity Factor (Using MDC Net) 51.9 O.0 40.4
22. Unit Capacity Factor (Using DER Net) 0.0 5.5 22.0
23. Unit Forced Outage Rate
24. Shutdowm Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status 1 Prior to Commercial Operation): Forecast Achiesed INITI A L CRIIICA LITY INITI A L ELECTRICITY COMMLRCI AL OPER ATION (o/77i

REFUELING INFORMATION l.. Name of facility. _ Arkansas Nuclear One - Unit 2

2. Scheduled date for next refueling shutdown. 9/1/82
3. Scheduled date for restart following refueling. 11/1/82
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

, If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions re associated with the core reload (Ref.10 CFR Section 50.59)?

Yes. Description of effects of new core loading.

5. Scheduled date(s) for submitting proposed licensing action and supporting information. 6/1/82
6. Important licensing considerations associated with refueling, e.g.,

nev or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Possible utilization of Core Protection Calculator (CPC) semi-addressable constants.

t

[

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 60 l

l 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies. -

present 486 increase size by 0

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE: 1989

_ - .- . -- - . = - . .- _

50-368- *-

UNIT SilUTDOWNS AND POWER REDUCT!ONS DOCKET NO. ANO - Unit 11 UNIT NAME DATE 7-6-81 COMPLETED BY L. S. Bramlett

.' REPORT MONTH June TELEPHONE (501) 968-2519 4,

, .5 ? 'h )Yd Licensee ,E-t, L Cause & Corrective Action to No. Date g 3g i is& Event g'? pU F yE E jgg Report a mV g Prevent Recurrence 6 ,

81-06 810328 S 720 C 4 N/A ZZ ZZZZZZ Refueling Outage i

l i

1 i

1 1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B.Mainti: nance or Test 2-Manual Scram. Entry Sheets for Licensee

. C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-l D Regulatory Restriction 4-Continuation 0161)

! E-Operator Training & License Examination 5-Load Reduction F Administrative 5 9-Other Exhibit 1 - Same Source G-Operational Error (Explain) 19/77) Il Other (Explain) i e $ ,

o ..

NRC MONTHLY OPERATING REPORT OPERATING

SUMMARY

- JUNE 1981 UNIT II The Unit continued in the Refueling Outage for most of the month. On 6-21-81 the Unit went to Mode 3 Operation and on 6-29-81 it was taken critical. The Unit operated in Mode 2 during the remainder of the month for Low Power Physics Testing.