i h
a OCAN039807 CORRECTION TO JANUARY 1998 NRC MONTIILY OPERATING REPORT I
OPERATING
SUMMARY
UNIT 1 9803250386 980316 i
PDR ADOCK 05000313 R
- PDR, 1
NRC. MONTHLY OPERATING REPORT OPERATING
SUMMARY
JANUARY 1998 UNIT ONE Corrected Copy The unit began the month of January operating at 100% power.
At 2042 hours0.0236 days <br />0.567 hours <br />0.00338 weeks <br />7.76981e-4 months <br /> on the fiAh, a power reduction was initiated due to excessive debris at the intake structure. At 2150 hours0.0249 days <br />0.597 hours <br />0.00355 weeks <br />8.18075e-4 months <br /> on the fiRh, the unit was taken offline and maintained in a hot shutdown condition for removal of the debris and repairs to the in*ake structure. The forced outage was further extended at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> on the ninth due to problems with a control rod assembly. Following a resolution to the control rod problem, oppsoach to criticality was commenced at 1355 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.155775e-4 months <br /> on the twelfth. The reactor reached criticality at 0151 hours0.00175 days <br />0.0419 hours <br />2.496693e-4 weeks <br />5.74555e-5 months <br /> on the thirteenth and was placed on line at 1532 hours0.0177 days <br />0.426 hours <br />0.00253 weeks <br />5.82926e-4 months <br /> that same day. The unit attained 100% power at 0508 hours0.00588 days <br />0.141 hours <br />8.399471e-4 weeks <br />1.93294e-4 months <br /> on the fourteenth. The unit operated the remainder of the month et 100% power.
There were no challenges to the primary system code safetics nor automatic actuations of the electromatic relief valve during this reporting period.
\\
<