05000315/LER-1983-040-03, /03L-0:on 830504,primary & Secondary Temp Instrument Trains for Meteorological Instrumentation Found Out of Spec.Caused by Inability to Calibr Temp Processor for Secondary Instrument Train.Train Recalibr

From kanterella
(Redirected from ML20023D942)
Jump to navigation Jump to search
/03L-0:on 830504,primary & Secondary Temp Instrument Trains for Meteorological Instrumentation Found Out of Spec.Caused by Inability to Calibr Temp Processor for Secondary Instrument Train.Train Recalibr
ML20023D942
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/27/1983
From: Palmer R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20023D938 List:
References
LER-83-040-03L-01, LER-83-40-3L-1, NUDOCS 8306060186
Download: ML20023D942 (1)


LER-1983-040, /03L-0:on 830504,primary & Secondary Temp Instrument Trains for Meteorological Instrumentation Found Out of Spec.Caused by Inability to Calibr Temp Processor for Secondary Instrument Train.Train Recalibr
Event date:
Report date:
3151983040R03 - NRC Website

text

LICENSEE EVENT REPORT

,, CO?lTROL BLOCK: l

}

l 1

l l

l IPLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI i

6 o lil l MI Il D I C ! C l l l@l 0 ! 011 - 1010101010 l- (010 l@l411 11 Il 11 l

lg 8

8 9 UCENsEE COOE 14 IS LICENSh NuveEM 25 26 L4 CENSE TYPE 40 5 7 LA T bd CcN T

% "C[ l L l@l 015 l 010 l 01311 16 l@l 015 10 14 18 13 I@lo is 12 1 to!i1 S

60 68 DOCKET NuA*BER tW 63 EVENT DATE J4 75 REPORT DATE o0 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h t o 6 211 DURING SURVEILLANCE TESTING ON MAY 2,1983, BOTH THE PRIMARY AND SECONDA lo431 1 INSTRUMENT TRAINS FOR THE METEOROLOGICAL INSTRUMENTATION W l

! o t a l 1 TION.

THE PRIMARY TRAIN WAS IMMEDIATELY RECALIBRATED TO WITHIN SPECIFICAT ON I

' o i s 1 I MAY 4.1983. THE METEOROLOGICAL INSTRUMENTATION WAS REMO C ! SECONDARY TEMPERATURE TRAIN. THIS EVFNT WAS NON-CONSFRVATTVF WITH RESPECT TO TECH 7 i SPECIFICATION 3.3.3.4.

THE REQUIREMENTS OF THE ACTION ITEM WERE MET.

THE PUBLIC I

e a 6 81 1 HEALTH AND SAFETY WERE NOT AFFECTED.

THIS IS THE FIRST OCCURRENCE OF THIS TYPE.

I SCI [E [c"[E ssc"c5E

^

cOveONENT cOCE susc7eE I I l O l@ [Ej@ [G_.j@ l I l NI S I T l R I U l@ [Ej@ $cECElZl@

a!91 s

9 10 Il 12 13 18 13 20

@,a('gqing TVENT vEAR RE OR O

COOE TY 18 13 I l-l l o 1410 I l/l 1013l lL i ll [0_j

" a' N

us E

_ 21 22 23 24 26 27 23 23 30 31 32 KEN ACTO ON PL NT TETH Hours s BA iT FOR1 B.

PPLIE MAN FA TuRER L!LJ@J4LZ_J@

LZJ@

Iz l@

l 010 10 10 I I Nl@

lYl@

lAl@

l T l 1 l 010 l@

33 36 36 31 40 en CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 42 43 44 47

  • o!lINVESTIGATION REVEALED THAT THE TEMPERATURE PROCESSOR AND THE l

1 1THE SECONDARY INSTRUMENT TRAIN WERE UNABLE TO BE CALIBRATED TO 1

> # -i i REPLACEMENT OF THESE PARTS WERE PERFORMED ON MAY 4,1983. THE SECONDARY INSTRUMEN I

M i TRAIN WAS RECALIBRATED, VERIFIED TO BE OPERATING CORRECTLY AND RETURNED TO SERVIC I

t4i l NO FURTHER ACTION IS PLANNED.

l

's Ou'Y C

OTwER status @ Es'c"a0ifv' seOwER

' i s 1 LE,j@ l1 l010 j@l NA l

l8l@l SURVEILLANCE TEST DISCOVERY OEsCRIPTION l

A!TiviTv

' RENT cO ItELEAsED O* RELEASE AMOUNT OF ACTIVITY

!s I LZJ @ I z l@l NA l

l NA LOCATION OF RELEASE

,ERscNN[L ExrOsOEs l

cEscRieficN@

NuveER rveE l 71 l 0101 O l@LIJ@l NA l

i n RsONNE L iN;u' lies cEsenierios@

NuveEa

!"Il0101Ol@l NA I

a9 11 12

'N*E ' " [c7, YON ""' " '" @

80 T

E i 9 J [Zj@l NA I

d 9 10 8306060186 B30527 OEscR+TeON@

[ ADEK 05000315 is lollSsuE8t NAC USE ONLY PDR 8 9 to g

[;;;;ll l:

[7 G8 69 80* 3 NAME OF PREPARER R. A. pal _MER Puo.,e 1 16)_465-5901

?M