MONTHYEARML19270H4761979-07-23023 July 1979 Forwards Request for Addl Info to Be Sent to Licensee in Order to Complete Review of 770722 Submittal Re Technical Assistance Contract 10026.Response Required within 45 Days Project stage: RAI ML19254D1071979-09-18018 September 1979 Requests Addl Info Re Loss of Offsite Power on 770920 to Aid in Review of Offsite Power Sys Adequacy.Requests Reponse within 90 Days Project stage: Approval ML19250C3611979-10-30030 October 1979 Forwards Request for Addl Info on Degraded Grid Voltage Determined During Review of 770722 Submittal Re Second Level of Undervoltage Protection for Engineering Safety Feature Loads.Proposal for Tech Specs Change Required Project stage: RAI ML19291B9031979-12-0707 December 1979 Adequacy of Station Electric Distribution Sys Voltage Project stage: Other ML19291B9011979-12-0707 December 1979 Forwards Rept Adequacy of Station Electric Distribution Sys Voltage Project stage: Other ML19290E0331980-02-13013 February 1980 Forwards Request for Addl Info Re Loss of Offsite Power Events.Requests Response within 90 Days Project stage: RAI ML19312D3491980-02-29029 February 1980 Forwards Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltage to Complete Review of Project stage: RAI ML19309G7571980-04-28028 April 1980 Forwards Addl Info Re Adequacy of Station Electric Distribution Sys Voltages & Replacement Pages for 791207 Rept in Response to NRC 800229 Request Project stage: Other ML20004B6371981-05-21021 May 1981 Application for Amend of License DPR-57 to Revise Tech Spec for Instrumentation Which Initiates Disconnection of Offsite Power Sources Project stage: Request ML20004B6391981-05-21021 May 1981 Tech Spec 3.2-12 for Instrumentation Which Initiates Disconnection of Offsite Power Sources Project stage: Other ML20031C9801981-10-0202 October 1981 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Degraded Voltage Relays & Loss of Offsite Power Relays Project stage: Request ML20031C9911981-10-0202 October 1981 Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Degraded Voltage Relays & Loss of Offsite Power Relays Project stage: Other ML20011B2431981-12-0202 December 1981 Corrected Tech Spec 4.9.A.6 for Limiting Condition for Operation & Surveillance Requirements Re Degraded Sys Voltage Project stage: Other ML20011B2411981-12-0202 December 1981 Forwards Corrected Tech Specs Pages 3.9-4 & 3.9-4a Re Degraded Sys Voltage,Per 811002 Amend.Typing Error Corrected.No Wording Changed Project stage: Other ML20039A9831981-12-0707 December 1981 Forwards Request for Addl Info Re Adequacy of Electric Distribution Sys Voltages.Response Requested within 30 Days Project stage: RAI ML20039F1461981-12-10010 December 1981 Advises That Components,Including Relays,Potential Transformers,Associated Auxiliary Relays & Power Supplies Are safety-related Equipment.Util Should Propose Tech Spec Changes That Include Surveillance of Components Project stage: Other ML20041C1501981-12-31031 December 1981 Station Auxiliary Sys Offsite Source Voltage Study Project stage: Other ML20040A9471982-01-12012 January 1982 Responds to 811207 Request for Addl Info on Electric Distribution Sys Voltages.Info Includes Test Results or Vendor Certification Re Contactor Capability for Continuous Operation at 98.2 Volts.Drawings Encl Project stage: Request ML20040D6031982-01-26026 January 1982 Proposed Tech Spec Pages Re Emergency Power Sys Project stage: Other ML20040D5991982-01-26026 January 1982 Application for Amend to Licenses DPR-57 & NPF-5 Changing Tech Specs Re Surveillance of Undervoltage Relays & Associated Components of Emergency Power Sys.Response to NRC Encl Project stage: Request ML20041C1421982-02-18018 February 1982 Forwards Southern Co Svcs Hatch Units 1 & 2 Station Auxiliary Sys Offsite Source Voltage Study, Clarifying Emergency Power Sys Capabilities.Assumptions 15,21 & 24 Outlined Project stage: Other ML20050F8911982-04-0505 April 1982 Safety Evaluation Re Adequacy of Facility Electric Distribution Sys Voltages.Design Acceptable Project stage: Approval ML20050F8891982-04-0505 April 1982 Notifies That Electric Distribution Sys Voltages Comply W/ General Design Criterion 17 & Are Acceptable Per 791207, 0428,1009 & 820112 Responses Project stage: Other ML20052F7821982-05-0606 May 1982 Safety Evaluation Supporting Amends 88 & 27 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval ML20052F7751982-05-0606 May 1982 Amends 88 & 27 to Licenses DPR-57 & NPF-5,respectively, Amending Tech Spec Resulting from Reanalysis & Mod of Plant Sys & Components Deemed Necessary in Order to Avoid Consequences of Degraded Grid Voltage Condition Project stage: Other ML20052G8481982-05-14014 May 1982 Requests Remittance of Class III Fee for 811002 Application Re Degraded Grid Voltage Project stage: Other 1981-12-02
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
I LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREENTS 4.9.A.6 Logic Systems (Continued) 4.9.A.6 Logic Systems (Continued) a.
The common accident signal a.
Each division of tne common logic system is operable.
accident signal logic system shall be
-tested every scheduled refueling outage to demonstrate that it will function on actuation of the core spray system.to provide.an automatic start signal to all 3 diesel generators.
b.
The undervoltage relays and b.
Once every scheduled refueling supporting system are operable.
outage, the conditions under which the undervoltage logic system is required shall 'be simulated with an undervoltage on each start bus to demonstrate that the diesel i
generators will start.
The testing of the undervoltage logic-shall demonstrate the operability of the 4160 volt load shedding and 1
auto bus transfer circuits.
The simulations shall test both the degraded voltage and the loss of off-site power relays.
c.
The common accident signal logic c.
Once per operating cycle each system, and undervoltage relays diesel generator shall be de-and supporting system are operable.
monstrated operable by simulating both a loss of off-site power and i
a degraded vc3tage condition in conjunctiun with an accident test j
sical and verifying:
~de-energization of the emergency buses and load shedding from the emergency buses; the diesel starts from ambient condition on the auto-start signal, energizes the emergency buses and sequentially closes all safety load breakers 4
(load breakers in test position):
and that on diesel generator. trip that safety load breakers on the emergency bus open, and that with an auto-start signal the diesel restarts and energizes the emergency buses and sequentially l
closes all safety load breakers (load breakers in test position).
The undervoltage relays for the start buses shall be calibrated annually for trip and reset voltages and the measurements recorded.
3.9-4
( 8112000100 811202 PDR ADOCK 05000321 P
PDR l
LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREKNIS 4.9.A.6 Logic Systems (Continued) 4.9.A.6 Logic Systems (Continued) e.
The 600-volt load shedding e.
Once every scheduled refueling logic system is operable, outage, the condition under which the 600-volt load shedding logic system is required shall be simulated to demonstrate that the load shedding logic system will initiate lo?d shedding on the diesel auxiliary boards, react MOV boards, and the 600-volt shutdown boards.
f.
600 volt swing bus transfer f.
Every two months the swing buses circuitry for MCC S018A and supplying power to the Low Pres-S0188.
sure Coolant Injection System valves shall be tested to assure that the transfer circuits operate as designed.
B.
Requirements for Continued Operation B.
Requirements for Continued Operation With Inoperable Comoonents With Inoperable Components Whenever the reactor is in the Start Continued reactor operation is
& Hot Standby or Run Mode and the pennissible with inoperable com-reactor water temperature is greater ponents in accordance with Speci-than 2120F, the availability of aux-fication 3.9.B provided that the iliary electrical power shall be as following increased Surveillance specified in 3.9. A, except as speci-Requirements are satisfied, fled herein.
If the requirements of this Specification cannot be met, an orderly shutdown shall be ini-tlated and the reactor shall be placed in the Cold Shutdown Condi-tion within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.9-4a