MONTHYEARML19270H4761979-07-23023 July 1979 Forwards Request for Addl Info to Be Sent to Licensee in Order to Complete Review of 770722 Submittal Re Technical Assistance Contract 10026.Response Required within 45 Days Project stage: RAI ML19254D1071979-09-18018 September 1979 Requests Addl Info Re Loss of Offsite Power on 770920 to Aid in Review of Offsite Power Sys Adequacy.Requests Reponse within 90 Days Project stage: Approval ML19250C3611979-10-30030 October 1979 Forwards Request for Addl Info on Degraded Grid Voltage Determined During Review of 770722 Submittal Re Second Level of Undervoltage Protection for Engineering Safety Feature Loads.Proposal for Tech Specs Change Required Project stage: RAI ML19291B9031979-12-0707 December 1979 Adequacy of Station Electric Distribution Sys Voltage Project stage: Other ML19291B9011979-12-0707 December 1979 Forwards Rept Adequacy of Station Electric Distribution Sys Voltage Project stage: Other ML19290E0331980-02-13013 February 1980 Forwards Request for Addl Info Re Loss of Offsite Power Events.Requests Response within 90 Days Project stage: RAI ML19312D3491980-02-29029 February 1980 Forwards Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltage to Complete Review of Project stage: RAI ML19309G7571980-04-28028 April 1980 Forwards Addl Info Re Adequacy of Station Electric Distribution Sys Voltages & Replacement Pages for 791207 Rept in Response to NRC 800229 Request Project stage: Other ML20004B6371981-05-21021 May 1981 Application for Amend of License DPR-57 to Revise Tech Spec for Instrumentation Which Initiates Disconnection of Offsite Power Sources Project stage: Request ML20004B6391981-05-21021 May 1981 Tech Spec 3.2-12 for Instrumentation Which Initiates Disconnection of Offsite Power Sources Project stage: Other ML20031C9801981-10-0202 October 1981 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Degraded Voltage Relays & Loss of Offsite Power Relays Project stage: Request ML20031C9911981-10-0202 October 1981 Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Degraded Voltage Relays & Loss of Offsite Power Relays Project stage: Other ML20011B2431981-12-0202 December 1981 Corrected Tech Spec 4.9.A.6 for Limiting Condition for Operation & Surveillance Requirements Re Degraded Sys Voltage Project stage: Other ML20011B2411981-12-0202 December 1981 Forwards Corrected Tech Specs Pages 3.9-4 & 3.9-4a Re Degraded Sys Voltage,Per 811002 Amend.Typing Error Corrected.No Wording Changed Project stage: Other ML20039A9831981-12-0707 December 1981 Forwards Request for Addl Info Re Adequacy of Electric Distribution Sys Voltages.Response Requested within 30 Days Project stage: RAI ML20039F1461981-12-10010 December 1981 Advises That Components,Including Relays,Potential Transformers,Associated Auxiliary Relays & Power Supplies Are safety-related Equipment.Util Should Propose Tech Spec Changes That Include Surveillance of Components Project stage: Other ML20041C1501981-12-31031 December 1981 Station Auxiliary Sys Offsite Source Voltage Study Project stage: Other ML20040A9471982-01-12012 January 1982 Responds to 811207 Request for Addl Info on Electric Distribution Sys Voltages.Info Includes Test Results or Vendor Certification Re Contactor Capability for Continuous Operation at 98.2 Volts.Drawings Encl Project stage: Request ML20040D6031982-01-26026 January 1982 Proposed Tech Spec Pages Re Emergency Power Sys Project stage: Other ML20040D5991982-01-26026 January 1982 Application for Amend to Licenses DPR-57 & NPF-5 Changing Tech Specs Re Surveillance of Undervoltage Relays & Associated Components of Emergency Power Sys.Response to NRC Encl Project stage: Request ML20041C1421982-02-18018 February 1982 Forwards Southern Co Svcs Hatch Units 1 & 2 Station Auxiliary Sys Offsite Source Voltage Study, Clarifying Emergency Power Sys Capabilities.Assumptions 15,21 & 24 Outlined Project stage: Other ML20050F8911982-04-0505 April 1982 Safety Evaluation Re Adequacy of Facility Electric Distribution Sys Voltages.Design Acceptable Project stage: Approval ML20050F8891982-04-0505 April 1982 Notifies That Electric Distribution Sys Voltages Comply W/ General Design Criterion 17 & Are Acceptable Per 791207, 0428,1009 & 820112 Responses Project stage: Other ML20052F7821982-05-0606 May 1982 Safety Evaluation Supporting Amends 88 & 27 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval ML20052F7751982-05-0606 May 1982 Amends 88 & 27 to Licenses DPR-57 & NPF-5,respectively, Amending Tech Spec Resulting from Reanalysis & Mod of Plant Sys & Components Deemed Necessary in Order to Avoid Consequences of Degraded Grid Voltage Condition Project stage: Other ML20052G8481982-05-14014 May 1982 Requests Remittance of Class III Fee for 811002 Application Re Degraded Grid Voltage Project stage: Other 1981-12-02
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
ma ae%
a j
WTED STATES 2,$
.~v y
MMISSION 5
WI SH No oN c.
s Al 2 31979 s
MEMORANDUM FOR:
T. Ippolito, Chief, Operating Reactors Branch #3, Division of Operating Reactors FROM:
G. Lainas, Chief, Plant Systems Branch, Division of Operating Reactors
SUBJECT:
EDWIN I. HATCH UNIT 1, REQUEST FOR ADDITIONAL INFORMATION DEGRADED GRID VOLTAGE (TAC 10026)
Plant Name:
Edwin I. Hatch, Unit 1 Docket No.:
50-321 Responsible Branch: ORB #3 Project Manager:
D. Verre111 Reviewing Branch:
Plant Systems Branch Status: Awaiting Information In response to technical assistance request TAC 10026, the Plant Systems Branch has reviewed the licensee's submittal of July 22, 1977 and found that additional information is required in order to complete our review.
The attached request for additional infonnation should be forwarded to the licensee as soon as possible with a request for response within 45 days.
dc v G'. L'ainas, Chief Plant Systems Branch Division of Operating Reactors
Contact:
S. Rhow, X28077 C. Cleveland, EG&G
Enclosure:
As rtated 7908 2 704 W
nacAC)e
. cc w/ enclosure:
D. Eisenhut W. Gamill B. Grimes D. Verrelli G. Lainas D. Tondi M. Chiramal P. Shemanski S. Rhow C. Cleveland, EG&G
9 REQUEST FOR ADDITIONAL INFORMATION EDWIN I. HATCH NUCLEAR PLANT UNIT 1 DEGRADED GRID VOLTAGE (TAC 10026) 1.
The NRC letter of June 2,1977, position (1)(f) called for surveillance requirements for second level undervoltage monitors.
Enclousre 2 of that letter orovided Model Technical Specifications (MTS) to be followed as closely as possible. Modify your pro-posal to include a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> channel check for these monitors.
2.
In your submitted proposal for surveillance requirement 4.9. A.6.C, the load breakers are in test position.
Your proposal also does not mention the > 5 minute requirement of the MTS.
It is the staff's position 7 as shown in Enclosure 2, 4.8.1.1.X.C, that the time requirement and actual loading of the buses should be performed.
These tests will confirm that the voltage transients from starting large motors will not trip the emergency buses spuriously.
Comply with this criteria or provide additional justification to support your present submittal.
3.
Provide sufficient information (voltage drop analyses) to allow our independent verification that the undervoltage protection voltage setpoint and time delay selected will not cause spurious separation of safety buses from offsite power during all modes of plant operation (start-up, shutdown, power operation and accident condition) due to automatic or manual starting of large motors, bulk or sequential loading or automatic transfer of electrical loads.
The analyses should include conditions when the safety buses are supplied power from the Unit Auxiliary Transformer, the start-up/ reserve transformer or other available offsite connections and assuming the need for electrical power is initiated by an anticipated transient (e.g., unit trip) or an accident, whichever presents the largest load demand.
.-