ML20005A984
ML20005A984 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 06/26/1981 |
From: | GILBERT/COMMONWEALTH, INC. (FORMERLY GILBERT ASSOCIAT |
To: | |
Shared Package | |
ML20005A982 | List: |
References | |
RTR-NUREG-0612, RTR-NUREG-612 NUDOCS 8107060167 | |
Download: ML20005A984 (47) | |
Text
{{#Wiki_filter:., _-. .- . . . . . .___ ._. . = .- . . . . - ..- _ . -- - - - . . - _. - -- -. - i i iG 1 ( 1 1 1 i CONTROL OF HEAVY LOADS l AT VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 i l l .: O I r i PREPARED BY GILBERT ASSOCIATES, INC. READING, PENNSYLVANIA i. Gdbert /C:-- -"h l ! 8107060167 810 j PDR ADOCK 0500 5
*-*MD'F=+'Nwe*y 9Ww w- wt-W'esur--eW'm TV -S *1=W 'erweem s-em y wga wed-iew*vW Dyr4M gs- - =ymyy egww" g weOre es yeq w r gW,, pre <sp g-ww . wye te- y 3w'w e C weerW w N vgW T W'N -ma9
TABLE OF CONTENTS Section Title Page
1.0 INTRODUCTION
1-1 2.0 IDENTIFICATION AND EXCLUSION OF OVERHEAD HANDLING DEVICES 2-1 3.0 CODES AND STANDARD COMPLIANCE FOR OVERHEAD HANDLING DEVICES 3-1 3.1 Crane Design 3-1 3.2 Lifting Devices 3-1 3.3 Inspection, Testing, and Maintenance 3-1 3.4 Crane Operator Training 3-4 4.0 PROCEDURES 4-1
5.0 CONCLUSION
5-1 LIST OF FABLES Table 1 OVERHEAD HANDLING DEVICES, VIRGIL C. SUMMER 1-4 O NUCLEAR STATION LIST OF FIGURES No. Title 1 Site Pla-2 Plan at Elevations 374'-0", 388'-0", and 400'-0" 3 Plan at Elevation 412'-0" 4 Plan at Elevation 436'-0" 5 Plan at Elevation 463'-0" 6 Plan at Elevations 485'-0", 482'-0", and 552'-0" 7 General Section A-A - Looking West 8 Service Water Pump House 9 Turbine Building - Plan at Elevation 412'-0" () 10 Turbine Building - Plan at Elevation 436'-0" 11 Turbine Building - Plan at Elevation 463'-0" Gdbert/Commoneese i
1.0 INTRODUCTION
This report responds to a request by the Nuclear Regulatory Commission (NRC) to all Licensees of Operating Plants, Applicants for Operating Licenses, and Holders of Construction Permits to review their controls for the handling of heavy loads to determine the extent to which their facilities satisfy the recommendations as reported in NUREG-0612, " Control of Heavy Loads at Nuclear Power Plants." The procedures to implement the recommendations of NUREG-0612 were outlined in enclosures that accompanied a letter dated December 22, 1980, by Darrell G. Eisenhut. This letter requires a six-month report and a nine-month report. The six-month report responds to the identification of the extent of potentially hazardous load-handling operations at a site and the extent of conformance to appropriate load-handling guidance. The nine-month report will respond to the
,o requirement of demonstrating that adequate measures have been taken U to ensure that the likelihood of a load drop which might cause damage to either fuel or components necessary for safe shutdown or decay heat removal is extremely small; or that the estimated consequences of such a load drop will not exceed the limits set by the evaluation criteria of NUREG-0612.
i This is the six-month report which identifies any potentially hazardous load-handling operations that could cause damage to either fuel or components necessar> for safe shutdown or decay heat removal at the South Carolina Electrical and Gas Company Virgil C. Summer Nuclear Station. The review that is addressed in this report follows the guidelines as set forth in Darrell G. Eisenhut's December 22, 1980 letter, Enclosure 3, and Section 5.1.1 of NUREG-0612. The guidelines that are outlined in the above references, and followed in this report, require the evaluation of overhead handling systems that handle heavy w/ G!bert /Commonweau l-1 l
/"' loads. A heavy load is defined as a spent fuel assembly and its \~))
associated handling tool; at the Virgil C. Summer Nuclear Station, this is defined as 2500 pounds. The guidelines for this report are: a) Identify all overhead handling devices from which a load drop could cause damage to fuel or components necessary for safe shutdown or decay heat removal. b) Justify the exclusion of any overhead handling device that handles heavy loads by verifying that there is sufficient physical separation from the point of impact and any component necessary for safe shutdown, decay heat removal, or spent fuel storage and fuel in the reactor vessel. c) Define safe load psthe dnd proc; dues t<,r the handling of heavy loads to minimize the possibility of the impact of a heavy load dropped onto spent fuel storage, spent fuel in the reactor vessel, safe shutdown equipment, or decay heat removal equipment. d) Overhead lifting devices should comply with either ANSI B30.9-1971, Slings, or ANSI N14.6-1978, Standard for Special Lifting Devices for Shipping Containers Weighing 10,000 P unds or More for Nuclear Matnrial. i e) Cranes should be designed according to CMAA Specification 70 and i ANSI B30.2 1976, Overhead and Gantry Cranes, Chapter 2-1. f) The cranes should be inspected, tested, and maintained in accordance with ANSI B30.2-1976, Overhead and Gantry Cranes, Chapter 2-2. l g) Review crane operators' training, qualifications, and conduct in reference to ANSI B30.2-1976, Overhead and Gantry Cranes, Chapter 2-3. l I i Gem;a -n l 1-2 l l
. -- __ __ ~ . - _ _ _ _ _ _ _ - . , . _ - . _ . . _ _ . _ . _ _ _ . _ . - _ . . _ _ . _ _ _ . _ __.
Table 1 enumerates the vital data for each overhead handling device at the Virgil C. Summer Nuclear Station. t f 4 4 F d W _f s i i I i i r i i I i i i Geert / Common.esten i~ 1-3
- . , . , - ... - . . - ,-.,- ... , - - --...--- - ~ ... - - . .. .- .. . -_ _. _ . - - - - - . . . -
- O O O J
TABLE 1 OVERHEAD HANDLING DEVICES, VIRGIL C. SUMMER NUCLEAR STATION j Heavy Loads Handled Load Excluded From Figure Crane I.D. Crane Type and Lifting Device Weight Further Concern No. Location XCR-1 Reactor Cavity Spent and New Fuel 2500 lbs No 5,6,&7 463' el. Manipulator Crane Assembly and Handling Reactor Tool Building XCR-2 Spent Fuel Pit Spent Fuel Assembly 2500 lbs No 5&7 463' el. Fuel
& XCR-16 Bridge Crane and Handling Tool Handling Building i XCR-3, Fuel Handling a) Net Fuel Shipping 6600 lbs Yes, 5&7 463' el. Fuel
{ fXCR-45,& Building Crane Conuiner and except Handling l Vendor-Supplied XCR-49 Building
- 1 -( XCR-49 Lifting Device 1
g b) Spent Fuel (later) i g Shipping Cask and Vendor-Supplied Lifting Device l, c) Fuel Transfer 4500 lbs l Canal Gates and 2 Part Sling Cable i d) Irradiated (later) i Specimen Shipping l Cask and Vendor-
- Supplied Lifting i Device l
i
r f~ O d ()/ \._/ TABLE 1 (Cont'd) Heavy Loads Handled Load Excluded From Figure Crane I.D. Crane Type and Lifting Device Weight Further Concern No. Location XCR-4 Reactor Building a) CRDM Missile 54,000 No 5, 6, 552' el. Polar Crane Shields lbs &7 Reactor b) Upper Internals 92,000 -Building and Internals 1bs Lifting Rig c) Lower Internals 268,000 and Internals lbs Lifting Rig d) Internals Lifting 19,000 Rig lbs e) ISI Tool and 20,000 fa' Vendor-Supplied Lifting Device lbs l' f) RCP Internals 48,000 lbs y g) RCP Casing and 52,000 Lifting Beam lbs h) RCP Motor 77,140 lbs i) RV Studs, Nuts, 8500 lbs and Washer Stand j) Equipment Bridge 4000 lbs XCR-17 Turbine Building General Electric Less than Yes 7 & 11 463' el. Crane Turbine Generator and or equal to (10) Turbine Associated Power max. capacity Building Plant Equipment
- XCR-18 10-ton Electric Power Plant Equipment Less than Yes 4 436' el.
! Cable or equal to Auxilia ry j Hoist and Trolley max. capacity (2 & 3) Building i i l. i
O O O 1 TABLE 1 (Cont'd) Heavy Loads Handled Load Excluded From Figure Crane I.D. Crane Type and Lifting Device Weight Further Concern No. Location i XCR-19 7.5-ton Electric Power Plant Equipment Less than Yes 6 485' el. Cable or equal Auxiliary Hoist and Trolley to max. (2,3,4, Building a, capacity & 5) l XCR-20A & 5-ton Hand Chain a) RHR Pumps 4400 lbs Yes 2 374' el. 1 XCR-20B Hoist and Trolley b) RHR Pump Motor 3200 lbs Auxiliary l Building
- XCR-21A 5-ton Manual Chain a) RB Spray Pumps 5400 lbs Yes 2 374' el.
- & XCR-21B Hoist and Trolley b) RB Spray Pump 5880 lbs Auxiliary Motors Building
{ [ XCR-54A, 5-ton Manual SI Charging Pumps Yes 2 388' el.
- XCR-54B & Chain Hoist and a) Pump 7500 lbs Auxiliary l ;
; XCR-54C Trolley b) Base 6000 lbs Building l c) Gear 2100 lbs
! d) Motor 6700 lbs I l XCR-23A 2-ten Manual a) RB Spray Sump Top 3000 No 3 412' el.
- & XCR-23B Chain hoist and Isolation Valve Complete Auxiliary 4
Trolley Protective 9000 lbs Building ! Chambers b) SI Recirculation Top 3000 Sumps Isolation Complete , Valves Protective 9000 lbs Chambers , XCR-24 8-ton Hand Chain Main Steam Stop Valves Less than Yes 11 463' el.
- Hoist and Trolley or equal to Turbine
! max. capacity Building 1 } i
(
- TABLE I (Cont'd) i Heavy Loads Handled Load Excluded From Figure Crane I.D. Crane Type and Lifting Device Weight Further Concern No. Location XCR-25A, 10-ton Hand Main Condenser 26,500 lbs Yes 9 412' el.
i XCR-25B, Hoist and Trolley Water Boxes (2 Cranes Turbine XCR-25C, & per Water Box) Building XCR-25D 1 XCR-26 4-ton Hand Chain Feedwater Booster Yes 9 412' el. Hoist and Trolley Pumps Turbine a) Pump 7800 lbs Building i b) Driver 8500 lbs c) Bedplate 5900 lbs , g XCR-27 5-ton Electric Power Plant Equipment Less than Yes 4 436' el. j - 3 Cable Hoist and or equal to Intermediate ). OP Trolley max. capacity Building k5 XCR-28 2-ton Electric Chemical Storage Less than Yes 1 Water Cable Hoist and Containers or equal to Treatment
; l Trolley max. capacity Building i
Xco-29A, 2-ton Hand- Generator Parts Less than Yes 4 Diesel XCR-29B Operated Hoist or equal to Generator
- and Trolley max. capacity Building XCR-31 1/2-ton Hand Under heavy load N/A Yes 4 436' el.
Chain Hoist and limit Intermediate Trolley Building
] XCR-33 2-ton Hand Chains Turbine-Driven Yes 3 412' el.
i Hoist and Trolley Emergency Intermediate Feedwater Pump Building l a) Pump 3000 lbs I b) Base 2400 lbs
! c) Driver 3260 lbs 1 ,1
r (~' \ (_ d ' j TABLE 1 (Cont'd) 1 i Heavy Loads Handled Load Excluded From Figure Crane I.D. Crane Type and Lifting Device Weight Further Concern No. Location i XCR-34 1-ton Electric Under heavy load N/A Yes 4 Reactor Cable Hoist and limit Building l Trolley Tendon { Access Gallery XCR-36 20-ton Electric Radwaste Facility Less than No 4 436' el. l Cable Hoist and Equipment or equal to Drumming Trolley max. capacity Station XCR-40A, 10-ton Hand Chain Main Steam 21,000 No 4 436' el. p XCR-40B, Hoists and Isolation Valves lbs Intermediate j 7 3 XCR-40C cc P Trolleys Building i XCR-42 10-ton Bridge Hot Machine Shop Less than Yes 4 Hot ] , Crane Applications or equal to Machine s max. capacity Shop i l XCR-43 10-ton Bridge Service Building Less than Yes 1 Service 3 Crane Applications or equal to Building l max. capacity i ) XCR-46 3-ton Bridge a) Concrete Plugs 1770 lbs No 5 463' el.
- Crane b) Filters and Negligible Auxiliary 1 Cartridges Building c) Storage Casks 2590 lbs j XCR-47 10-ton Bridge Hot Machine Shop and Less than No 4 436' & 447' Crane Low Level Waste or equal to el. Drumming j Storage max. capacity Station l
1 l i D 9
O O O TABLE 1 (Cont'd) 1 Heavy Loads Handled Load Excluded From Figure Crane I.D. Crane Type and Lifting Device Weight Further Concern No. Location XCR-48 1-1/2-ton Hand Instrument and Less than Yes 9 412' el. Chain Hoist and Service Air or equal to Turbine Trolley Compressors max. capacity Building XCR-51 & 10-ton Bridge a) Service Water 27,939 No 8 436' el. XCR-50 Crane and Hoist Traveling Screen 1bs Service Water b) Service Water 14,000 Intake Screen 4 Pump lbs and Pumphouse { c) Service Water 15,650 i , Pump Motor lbs
- I
{XCR-53A, 2-ton Twin Hook CRDM Cable Support N/A Yes 5 475' el.
~ XCR-53B, Extension Hoists Structures Reactor 'i' P XCR-53C Building i
- j"; XRW-11 1-ton Jib Crane Under heavy load N/A Yes 4 436' el.
1 limit Drumming Station XRW-13 3-ton Jib Crane a) Concrete Plugs 1770 lbs No 4 436' el. I b) Spent Filters Negligible Drumming and Cartridges Station
; c) Storage Casks 2590 lbs i d) Lifting Beam 1350 lbs Reactor Building Equipment N/A Yes 5 463' el.
Equipment Access Hatch Reactor j Hatch Door Building i l f 4 i
q 2.0 IDENTIFICATION AND EXCLUSION OF OVERHEAD HANDLING DEVICES v This study documents the review of overhead handling devices at the Virgil C. Summer Nuclear Station that can handle a heavy load, defined as an item equal in weight to a spent fuel assembly and its handling tool. The following sections are descriptions of the overhead handling device, crane, and hoist at the Virgil C. Summer Nuclear Station. Each overhead handling device has been reviewed, and each individual description includes the type of crane or hoist being reviewed, the type of handling device being employed, and the items that the device was designed and designated to handle. The Virgil C. Summer Nuclear Station was then reviewed, in reference to the overload handling devices, by a physical inspection of the plant and by studying the up-to-date layout drawings. The various overhead handling devices are shown on Figures 1 through 11. The figures indicate each handling device's proximity to any components necessary for safe ('-)
- shutdown or decay heat removal, and to any area were an inadvertent drop of a heavy load may cause a radioactive release, such as the spent fuel pit or reactor vessel. The safe shutdown and decay heat removal components considered in this study do not include piping, valves, and cable.
A safe load path for every overhead handling device is defined where physically possible to do so. When a crane or hoist is operated within the confines of its defined safe load path, it would be l unlikely that an inadvertent drop of a heavy load would cause damage l to any component necessary for the safe shutdown of the plant, decay heat removal, or fall into an area that could cause a radioactive release. The safe load path is then defined as an area within the crane's or hoist's range where none of the above components are located. The only exceptions are those necessary components serviced uniquely by a crane or hoist for maintenance. The overhead handling device will not be operated until after these components have been O.- 2-1
()
<x. isolated from their system and after their function has been assumed by a redundant component. In areas where the only separation between
- a dropped heavy load and an item that needs to be protected is a structural floor, a preliminary study was conducted to indicate whether further study was necessary. The results indicating the necessity of any in-depth structural studies will be presented in the nine month report.
Safe load paths for some cranes and hoists could not be defined. In those cases procedures will be drawn up and design modifications will be made where necessary to minimize the chances and the consequences of an inadvertent load drop. Procedures for overhead handling devices are being developed to dictate the operation and use of the device. It should be recognized that because of the construction stage of the Virgil C. Summer Nuclear Station, procedures are not generally available at this time. O I s-mg ; - - , . 2-2 l i
. . , _ . _ - - _ . . _ _ . - . - _ . . _ _ . - _ . . , , _ _ _ . . _ . . .__ _ ~ .. _ . . _ - . . . _ _ _ _ . .
rw 2.1 Reactor Cavity Manipulator Crane (_) Reactor Cavity Manipulator Crane XCR-1 is located on elevation 463' directly above the reactor vessel cavity. There is no safe load path that can be defined for this crane. The Reactor Cavity Manipulator Crane is shown on Figures 5, 6, and 7. The Reactor Cavity Manipulator Crane is supplied by the Stearns and Rogers Corporation for Westinghouse Electric Corporation. The bridge crane is supplied by Dwight Foote, Inc. and the hoist by P&H Harnischieser Company. The hoist and crane have a 2 ton capacity and utilize a handling tool to handle the new and spent fuel assemblies. The crane is an electric motorized bridge crane, and the hoist is an electric cable hoist. Both the crane and hoist are operated from a remote station. The crane and hoist are both designed in accordance with CMAA Specification 70 and ANSI B30.2, Chapter 2-1. 7-s The Reactor Cavity Manipulator Crane is designated solely for the
\l handling of fuel assemblies during refueling of the reactor. As I
stated above, no safe load path can be defined for the crane and l operation is governed by Westinghouse Refueling Procedures which are being put into an approved standardized format at this time. l l l v CAertIC .- --"- 2-3
2.2 Spent Fuel Pit Bridge Crane The Spent Fuel Pit Bridge Crane is XCR-2. Attached to it is the Protex Cable Reel XCR-16, which is excluded from further study since its maximum capacity is well under the heavy load criteria. This crane is located on elevation 463' of the Fuel Handling Building at column lines Q.5 to R.5 and 2.5 to 6.5 directly over the Spent Fuel Pit. The crane is shown on Figure 5 and 7. No safe load path is defined for this crane. Crane XCR-2 is supplied by Dwight Foote, Inc. through Westinghouse Electric Corporation. The crane's hoist is supplied by the P&H Harnischfeger Company. The crane and hoist are rated for a 2 ton capacity and has a maximum 25 foot lift.I The hoist is an electric cable hoist on a hand geared trolley with a safety hook that attaches to a fuel handling tool when handling spent fuel assemblies. '1he crane and hoist are controlled by a hand-held pushbutton station. A The crane and hoist design adheres to CHAA Specification 70 and ANSI U B30.2, Chapter 2-1. The Spent Fuel Pit Crane is designated for the handling of spent fuel j assemblics in the Spent Fuel Pit. Since it operates over the Speut Fuel Pit, there is no safe load path defined for this crane. The operation of this crane and hoist are governed by the Westinghouse Refueling Procedures which are currently being reviewed and placed into a standard format. I
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
O GdbertICommonwealth l 2-4 l
2.3 Fuel Handling Building Crane
)
Fuel Handling Building Crane XCR-3 hos associated with it Fuel Transfer Canal Gate Hoist XCR-49 and the New Fuel Elevator Winch, XCR-45. The New Fuel Elevator Winch is not considered further since by definition it is not an overhead handling device. All three items are located in the Fuel Handling Building on elevation 463' at column lines Q.5 to S and 2.5 to 4.91. The three items are shown on Figures 5 and 7, along with the safe load path which includes the New Fuel Laydown Area, New Fuel Storage Area, the Decontaminction Area, and the Cask Loading Pit and surrounding area. The Fuel Handling Building Crane's safe load path does not include any area within 15 feet of the spent Fuel Pit. rne Fuel Handling Building Crane is supplied by the Whiting Corporation and the Fuel Transfer Canal Gate Hoist is supplied by the American Chain and Cable Company. The Fuel Handling Building Crane
,r s3 has a main electric motor cable hoist with a 125 ton capacity, a i /
sister hook with eye, and a potential for a 60 foot lift. The auxiliary electric motor cable hoist has a 25 ton capacity, a single hook, and a potential lift of 60 feet 6 inches.1 The Fuel Transfer Canal Gate Hoist is physically attached to the bridge of the Fuel Handling Building Crane and is a 3 ton capacity electric cable hoist. The assembly as a whole is designed in accordance with CMAA Specification 70 and ANSI B30.2, Chapter 2-1. l i 1
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
(" s l l Gdbert/Commonwea!th 2-5 i _ . _ . - . _ . _ _ . _ . _ _ - . __.._,. _ _ __ _ ___... , .~.__
The Fuel Handling Building Crane is designated to handle New Fuel v Shipping Containers, Spent Fuel Shipping Casks and Irradiated Specimen Shipping Casks with vendor-supplied lifting devices. The Fuel Transfer Canal Gate Hoist is designated to handle the Fuel Transfer Canal Gates with a two-point sling cable. Procedures are being developed (See Section 4.0) along with design studies to minimize the risk of a dropped heavy load in the Fuel Handling Building. Special procedures are also being developed for the Fuel Transfer Canal Gate Hoist since it is necessary to operate within 15 feet of the Spent Fuel Pit. O LJ O (Whert / Commonwealth 2-6
2.4 Reactor Building Polar Crane Reactor Building Polar Crane XCR-4 is located in the Reactor Building at elevation 552'. The Reactor Building Polar Crane and safe load paths are shown on Figures 5, 6, and 7. The Reactor Building Polar Crane is supplied by the Whiting Corporation and has a main electric motor cable hoist rated at 360 ton with a sister hook with eye. The auxiliary electric motor cable hoist has a 25 ton capacity with a single hook. The hoists, bridge, and trolleys all have seperate Whiting Telemotive radio control with redundant pushbutton station. The Reactor Building Polar Crane is designed in accordance with CMAA Specification 70 and ANSI B30.2, Chapter 2-1. The Reactor Building Polar Crane is designed to handle the loads with the lifting devices as listed in Table 1. As stated above in Figure 5, safe load paths are identified where the Reactor Building k Polar Crane can be operated without fear of damage to vital components due to inad"trtani load drop. However, there are areas where the crane must operate where = .sfe load path could not be defined. Procedures are being developed to protect components necessary for safe shutdown of the plant, decay heat removal, or areas where an inadvertant load drop could cause a radioactive release. The items that could be affected by an inadvertant load drop include the reactor vessel, the steam generators, the pressurizer, and the reactor building cooling units, XAA-1A and B, 3 XAA-2A and B, XFN-64A and B, XFN-65A and B, XCE-8A and B, and XCE-9A and B. O Gibert/ Commonwealth 2-7
-. - ~. . .
2.5 Turbine Building Crane
. :O 4
Turbine Building Crane XCR-17 is located on elevation 463' of the Turbine Building. The crane is shown on Figure 7 along with its safe load path. The safe load path encompasses the entire 463' elevation of the Turbine Building between column lines 1 and 12, and A and F, as well as those areas on elevation 463' open to hatches from the 463' elevation as shown in Figure 10. The Turbine Building Crane is' supplied by P&H Harnischfeger Corporation, and is a 220 ton, five motor overhead traveling crane with a-30 ton, 6 inch auxiliary hoist. The main hoist has a 95 foot lift and the auxiliary hoist a 111 foot lift.I The crane is operated through an operator's cab or pendant control and has a festoon i
- conductor on the' trolley. The crane's main hoist employs'a sister hook and the auxiliary hoist employs a fish hook rated as stated above. The crane and associated hoists are designed in accordance with CMAA Specification 70 for Class A indoor service and ANSI B30.2, Chapter 2-1.
l The Turbine Building Crane is designed to ' service t'ae General Electric Turbine Generator and Associated Power Plant Equipment. Since there is no equipment in the Turbine Building required for safe shutdown or decay heat removal, this crane can be excluded from further study or concerns. t l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
O
, .=
2-8 L , _ _.. _ . . , _ . . _ . . _ - . . _ , . _ . - - - _ . . . _ , - _ _ - . . _ . - . . _ - _ . _ _ . - - - .- _ . - _
( 2.6 10-Ton Electric Cable Hoist and Motor Operated Trolley i. The 10-t.on electric cable hoist and motor operated trolley XCR-18 is located on elevation 463' of the Auxiliary Building at column lines 9.5 and L. .The hoist is shown on Figure 4 and its safe load path is the equipment hatch and surrounding area through elevations 436', 412', 397', 388', and 374' of the Auxiliary Building. The safe load path is shown of Figures 2, 3, and 4. Hoist XCR-18 is supplied by the American Chain and Cable Company and is a 10-ton capacity electric cable hoist with a motor driven trolley. The hoist has a 90 foot lift and is controlled with a single speed hand held controller.I The hoist's lifting device is a forged steel shank hook. The hoist and trolley are designed in accordance with CMAA Specification 70 for Class A and C indoor service, and ANSI B30.2, Chapter 2-1 to the extent to which they apply. A
'd The 10-ton electric cable hoist is designated to lift power plant equipment through the equipment hatch from elevations 372' to 436' of the Auxiliary Building. Inside the safeload path and in the nearby surrounding area there is no equipment necessary for safe shutdown or decay heat removal. Therefore, the hoist is excluded from further study and concerns.
l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this l
maximum. O Gdbert /Cemonwulth 2-9
2.7 7.5-Ton Electric Cable Hoist with Motor Operated Trolley
. .O-The 7.5-ton electric cable hoist and motor operated trolley XCR-19 is located on elevation 485' of the Auxiliary Building at columns P and 6.6. The hoist is shown on Figure 6, and its safe load path is the equipment hatch through elevations 388', 397', 412', 436', 463', and 485' of the Auxiliary Building as shown on Figures 2, 3, 4, 5, and 6.
Hoist XCR-19 is supplied by the American Chain and Cable Company and is a 7.5-ton capacity electric cable hoist with a motor driven trolley. The hoist has 126 foot lift and is controlled by a hand-held controller.I The hoist's lifting device is a forged steel shan'. hook. The hoist and trolley are designed in accordance with
'CMAA Specification 70 for Class A and C indoor service, and ANSI B30.2, Chapter 2-1 to the extent to which they apply.
The 7.5-ton electric cable hoist is designated to lift general power
- plant equipment through the equipment hatch from elevations 388' to
> 485' of the Auxiliary Building. Inside the safeload path and in the nearby surrounding area there is no equipment necessary for safe shutdown or decay heat removal. The hoist is excluded from further j study or concerns.
f
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this
- maximum.
Glhert /Connonwealth 2-10
l p_ 2.8 5-Ton Hand Chain Hoist and Plain Trolley U The 5-ton chain hoists and trolleys XCR-20A and XCR-20B are located in Auxiliary Building on elevation 374' at the column lines K and 8.8 above the Residual Heat Removal Pumps. The hoists are shown on Figure 2 along with their safe load paths. Hoists XCR-20A and XCR-20B are supplied by the American Chain and Cable Company and are 5-ton capacity hand operated chain hoists with a plain trolley. The hoists have 20 foot lifts and forged steel shank hooks.I The hoists and trolleys are designed in accordance with CMAA Specification 70 for Class A and C indoor service, and ANSI B30.2, Chapter 2-1 to the extent to which they apply. The 5 ton hand chain hoists and plain trolleys XCR-20A and XCR-20B are designated to service the RHR pumps and notors, XPP-38A and XPP-38B, respectively. The RHR pumps necessary for the removal of > decay heat are located within the safe load paths of hoists and
' trolleys XCR-20A and XCR-20B. While a heavy load drop from the I hoists could cause damage to the RHR pumps the only time this would i occur is when the pump in question would have maintenance being performed on it. During maintenance periods on an RHR pump, the pump would be isolated from its systems and on this basis can be excluded l from further study or concern.
l l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
Gdbert / Commonwealth 2-11
O 2.9 5-Ton Manual Chain Hoist with Geared Trolley V The 5-ton manual chain hoists and geared trolleys XCR-21A and XCR-21B are located in the Auxiliary Building on elevation 374' near column lines K and 8.8 above the Reactor Building Spray Pumps. The hoists and trolleys are shown on Figure 2 along with their safe load paths. Hoists XCR-21A and XCR-21B are supplied by the American Chain and Cable Company and are 5-ton capacity hand-operated chain hoists on geared trolleys. The hoists have a 20 foot lift with forged steel shank hooks.I The hoists and trolleys are designed in accordance with CMAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-2 to the extent to which they apply. Loists XCR-21A and XCR-21B are designated to service the Reactor Building Spray Pumps and Motors XPP-38A and XPP-38B. Wititin the safe load paths of hoists XCR-21A and XCR-21B there are no components necessary for safe shutdown or decay heat removal, so these hoists b are excluded from further study. l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
i Gibert / Commonwealth i 2-12 l
. _ _ . , _ . . .. , _ . _ , . - - _ _ _ _ _ . - . . _ . _ - - _ _ . . ~ _ . . . - _ , _ . - . , - , . _ - . _ . _ . _ _ _ _ _ , ~ . . - , . . . - . . . _ . _ -
g~ 2.10 5-Ton Manual Chain Hoist with Geared Trolley V The 5-ton manual chain hoists with geared trolleys XCR-54A, XCR-54B, and XCR-54C are located in the Auxiliary Building on elevation 388' at the column lines M to Q and 7.7 above the Safety Injection Charging Pumps. The hoists and trolleys are shown on Figure 2 along with their safe load paths. Hoists XCR-54A, XCR-54B, and XCR-54C are supplied by the American Chain and Cable Company, and are 5-ton capacity, closehead room, hand operated chain hoists on geared trolleys. The hoists have an 8 foot lift with a forged steel shank hook. The hoists and trolleys are
- designed in accordance with CMAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-1 to the extent to which they are applied.
Hoists XCR-54A, XCR-54B, and XCR-54C are designated to service Safety
-s Injection Charging Pumps XPP-43A, XPP-43B, and XPP-43C. Inside and near the safe load paths, the Safety Injection Charging Pumps are the only components necessary for the safe shutdown of the plant. The only time a heavyload drop could cause damage to the pumps is when the pumps are being serviced. While they are being serviced, the pumps are isolated from their systems, and on this basis hoists XCR-54A, XCR-54B, and huR-54C are excluded from any further study or Concerns.
l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
/~) \J >
Gibert / Commonwealth 2-13
f-- 2.11 2-Ton Manual Chain Hoist with Plain Trolley The 2-ton manual chain hoists with plain trolleys XCR-23A and SCR-23B are located in the Auxiliary Building on elevation 412' at column lines J to N and 7.7. The hoists and trolleys are shown on Figure 3 along with its safe load paths. Hoists XCR-23A and XCR-23B are supplied 'oy the American Chain and Cable Company, and are 2-ton capacity hand operated chain hoists on plain trolleys. The hoists have a 26 foot lift and a forged steel shank hook. The hoists and trolleys are designed in accordance with CMAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-2 to the extent to which they are applicable. Hoists XCR-23A and XCR-23B are designated to service the Reactor Building Spray Protective Sump Isolation Valve Chambers XSM-4A and XSM-4B, and the Safety Injection Recirculation Sump Isolation Valve 7-~ . Protection Chambers XSM-5A and XSM-5B. Near hoist XCR-23B is a Motor 's ' / Control Center XMC-1DAZY and an Air Handling Unit for Motor Control Center XAH-32-VL, both of which are necessary for the safe shutdown of the plant. Procedures are being developed and design modifications studied to minimize the chances of an inadvertent load drop causing damage to the adjacent protective chambers and the motor control center and accompanying air handling unit.
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
Gelbert / Commonwealth 2-14
2.12 8-Toa Manual Hand Chain Hoist with Geared Trolley (-)% (. The 8-ton manual chain hoist with geared trolley XCR-23 is located in the Turbine Building on elevation 463' at column lines F and 4 '.o 5. The hoist and trolley are shown on Figure 11 along with their safe load paths. Hoist XCR-24 is supplied by the American Chain and Cable Company, and is an 8 ton capacity hand operated chain hoist with a geared trolley. The hoist has a 20 foot lift and a forged steel shank hook.I The hoist and trolley are designed in accordance with CHAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-1 to the extent to which they are applicable. Hoist XCR-24 is designated to service the Main Steam Stop Valves XVG-2809 A to D. Since the Turbine Building contains no equipment necessary for the plant's safe shutdown or decay heat removal, this hoist can be excluded from further study or concern. v
-)
l l l l l l i l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this I maximum.
Gdbert /Commonwedh 2-15
I 2.13 10-Ton Manual Chain Hoist with Geared Trolley q'o The four 10-ton manual chain hoists and geared trolleys XCR-25A, t XCR-25B, XCR-25C, and XCR-25D are located on elevation 412' of the Turbine Building at column lines B to B.9 and 5 to 8. The hoists ard trollevs are shown on Figure 9 along with their safe load paths. Hoists XCR-25A thru XCR-25D are manufactured by the American Chain and Cable Company and are 10 ton capacity hand operated chain hoists on geared trolleys. The hoists have 15 foot lifts and forged steel shank hooks.I The hoists and trolleys are designed in accordance with CMAA Specification 70 for Class A and C indoor and outdoor service and ANSI B30.2, Chapter 2-1 to the extent to which they apply. Hoists XCR-25A thru XCR-25D are designated to service the four Main Condee.or Water Boxes. Two hoists service one water box -t a time. Since the Turbine Building contains no equipment in it necessary for the plant's safe shutdown or decay heat removal, these hoists can be excluded from further study or concern. l l l
- 1. The lift as given is the maximum from the eye of the hook to the top of i the beam; the actual lift as installed may be equal or less than this maximum.
O 2-16 l
g 2.14 4-Ton Manual Chain Hoist with Plain Trolley V The 4-ton manual chain hoist with a plain trolley XCR-26 is located in the Turbine Building on elevation 412' at column lines F to G.1 and 1 to 3 above the Feedwater Booster Pumps. The hoist and trolley is shown on Figure 9 along with its safe load path. Hoist XCR-26 is manufactured by the American Chain and Cable Company, and is a 4-ton capacity, hand operated, chain hoist on a plain trolley. The hoists have a 15 foot lift and a forged steel shank hook.I The hoist and trolley is designed in accordance with CMAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-1 to de extent to which they apply. Hoist XCR-26 is designated to service the Feedwater Booster Pumps XPP-28A through XPP-28D. Since the Turbine Building contains no equipment necessary for the plant's safe shutdown or decay heat removal, this hoist can be excluded from further study or concern. O i i
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
Gelbert / Commonwealth 2-17
w 2.15 5-Ton Electric Hoist with Motor Operated Trolley s_- The 5-ton electric hoist and motor operated trolley XCR-27 is located in the Intermediate Building on elevation 436' at column lines C.4 to H.4 and 7.5 to 8.3. The hoist and trolley are shown on Figure 4 along with its safe load path. Hoist XCR-27 is manufactured by the American Chain and Cable Company, 3 and is a 5-ton capacity, electric cable hoist on a motorized trolley, with a hand held electric controller. The hoist nas a 49 foot lift and a forged steel shank hoist.I The hoists and trolleys are designed in accordar : with CMAA Specification 70 for Class A and C indocr service and ANSI B30.2, Chapter 2-1 to the extent to whic.1 they are applicable. Hoist XCR-27 is designated to handle power plant equipment through the equipment hatch from elevations 412' and 436' in the Intermediate
- Building. Nowhere within or near the safe load path are there
('s)
' components necessary for safe shutdown or decay heat removal; therefore this hoist can be excluded from further study or concern.
1 3 E i
- 1. The lift as given is the maximum from the eye of the book to the top of the beam; the actual lift as installed may be equal or less than this maximum.
Gdbert / Commonwealth 2-18
3 2.16 Ton Electric Cable Hoist with Motorized Trolley
(%) The 2-ton electric cable hoist and motorized trolley XCR-28 is located on elevation 463' of the Water Treatment Building at column lines D to D.6 and 10.6. The hoist and trolley are shown on Figure 1 along with its safe load path. Hoist XCR-28 is supplied by the American Chain and Cable Company, and is a 2-ton capacity, electric cable hoist on a motorized trolley with a hand-held electric controller. The hoist has a 43 foot lift and has a forged steel shank hook.I The hoists and trolleys are designed in accordance with CMAA Specification 70 for Class A and C indoor and outdoor service and ANSI B30.2, Chapter 2-1 to the extent to which I they are applicable. Hoist XCR-28 is designated to handle containers from the Water Treatment Building's Chemical Storage area. Inside and near the (g hoist's safe load path there are no components necessary for safe
\
shutdown or for decay heat removal. On this basis the hoist is excluded from further study or concern. l
~~
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
O 2-19 ,
a 2.17 2-Ton Hand Operated Hoist with Geared Trolley V The 2-ton hand operated hoists and geared trolleys XCR-29A and XCR-29B are located in the D?esel Generator Building on elevation 436' at the colume lines A.4 to J.1 and column line number 1 above the Diesel Generators. The hoists and trolleys are shown on Figur, 4 along with their safe load paths. Hoists XCR-29A and XCR-29B are supplied by the American Chain and Cable Company, and are 2-ton capacity, single beam, underhung, hand operated hoists with geared trolleys. The hoists have a 24 foot lift and forged steel shank hwks.I The hoists and trolleys are designed in accordance with CMAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-1 to the extent to which th2y are applicable. Hoists XCR-29A and XCR-29B are designated to service the two standby n emergency diesel generators, XEG-1A-DG and XEG-1B-DG, respectively. Within the area of each crane's safe load path the diesel generator, the fuel oil day tank, the air receiver, and on elevation 427', the fuel oil transfer pump are necessary for the safe shutdown of the plant. M only time the four safe shutdown components are in jeopardy from a heavy load drop from hoists XCR-29A and XCR-29B, is when a hoist is servicing a diesel generator and associated equipment for maintenance purposes. When one diesel generator train is down for maintenance, the other is completely isolated from it and is capable of operating independently. On the basis presented above and because the two diesel generator trains are completely redundant, l hoists XCR-29A and XCR-29B are excluded from further study or concern. i l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
l Gdbert / Commonwealth 2-20 i
. , . . . ,.__.,,--.._..._r . _ _ _ _ , . _
~ . . . . .- _ _- _ m ._. _ _ . ._ . _ _ . __ .. - /3 2.18 1/2-To'n Hand Chain Hoist and Trolley V
The 1/2-ton hand operated chain hoist and plain trolley XCR-31, manufactured by the American Chain and Cable Company, has a maximum rated capacity less than that defined for a heavf load in this study. On this basis the hoist is .m.t included in this study except for reference and completeness. It is located on elevation 436' of the Intermediate Building near column lines H.4 and 2 to 3, and can be found on Figure 4. I I O l i O Geert /Commonweetth 2-21 i
. ~. , , , . _ - . . _ - .._ - _ ._,. _ . _ . _ . . _ _ _ , _ _ . _ , _ . _ ~ . _ . . _ . - . _ . . , . , - . _ _ _ _ . . _ _ _
2.19 2-Ton Hand Chain Holst With trolley The 2-ton hand operated chain hoist and trolley XCR-33 is located on j elevation 412' of the Intermediate Building at column lines G.3 to H.4 and 2 to 3, above the Emergency Feedwater Pump and Turbine Drives. The hoist is shown on Figure 3 along with its safe load path. Hoist XCR-33 is supplied by the American Chain and Cable Company, and is a 2-ton capacity, hand operated, chain hoist with a plain trolley. The hoist has a 10 foot lift and a forged steel shank hook.I The i hoist and trolley are designed in accordance with CMAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-1 to the extent to which they apply. j Hoist XCR-33 is designated to service the Turbine Driven Emergency - Feedwater Pump XPF-8-EF. Within the hoist's safe load path the pump l and itt turbine driver are necessary for the plant's safe shutdown. l The only time the pump and driver are in jeopardy of a heavy load drop is when the emergency feedwater pump has already been isolated i for maintenance. On the basis given above and since the Turbine Driven Emergency Feedwater Pump is redundant with the Motor Driven l Emergency Feedwater Pump, the hoist can be excluded from further study or concern. i i l l , 1. The lift as given is the maximum from the eye of the hook to the top of l the beam; the actual lift as installed may be equal or less than this maximum, t v 1 Gdbert / Commonwealth ! 2-22 f
. .-.--,_m- -.,-~y,_ ,,:%-,.y,,,,.__..,..-,,,,---,..~,....t- ,._.__,,,.m,.,,,,_y.m..- , , _ ...-,,,, . . , , . _ . -e ,.,,m-.-r_,-,_,,4_m-,,._.-,.m,
2.20 1-Ton Electric Cable Hoist and Trolley
~
1-ton electric cab e hoist and plain push type trolley XCR-34, pplied by the American O':.',in and Cable Company, has a maximum rated capacity less than that defined for a heavy load in this study. On this basis the hoist is not included in this study except for reference and completeness. It is located at elevation 436' of the Reactor Building over the Tendon Access Gallery, and can be found on Figure 4. O 4 l i O
--k Geert/C.
2-23 i l- _
l 2.21 20-Ton Electric Cable Hoist with Motorized Trolley i b<~ I i The 20-ton electric cable hoist and motorized trolley XCR-36 is l located in the Drumming Station on elevation 436' at column lines P to R and 6.6 to 8.8. The hoist and trolley are shown on Figure 4 along with its safe load path. i Hoist XCR-36 is supplied by the American Chain and Cable Company, and is a 20-ton capacity, electric cable hoist with an electric motorized trolley. The hoist has a 25-foot lift and a forged steel shank hook.I The hoist and trolley are designed in accordance with CMAA Specification 70 for Class A and C indoor service and ANSI B30.2, Chapter 2-1 to the extent to which they are applicable. Hoist XCR-36 is designated to handle low and high level radiation shipping casks. On elevation 463' and within the hoists sufeload path there are no components necessary for the plant's safe shutdown or decay heat removal. Below hoist XCR-36, however, on d elevation 412' are the Spent Fuel Pit Cooling Pumps, XPP-32A and XPP-32B. These pumps are classified as Safety Class 2b. A preliminary study has shown that a dropped shipping cask could not penetrate the elevation 436' floor and cause damage to one or both of the Spent Fuel Pit Cooling Pumps, which are independent and
. dundant pumps. Procedures are being written to prevent the dropping of a radwaste shipping cask and minimize the potential hazard that could result.
l i i
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this j maximum.
o , b l m f r_- - - n l 2-24 1
(m 2.22 10-Ton Hand Chain Hoists with Geared Trolley b The 10-ton hand chain hoists and geared trolleys XCR-40A, XCR-40B, and XCR-40C are located on elevation 436' of the Intermediate Building at column lines H.4 to J.1 and 2 to 8 above the Main Steam Isolation Valves. The hoists and valves are shown on Figure 4 along with their safe load paths. Hoists XCR-40A, XCR-40B, and XCR-40C are supplied by the American Chain and Cable Company, and are 10-ton capacity, manually operated chain hoists. The hoists have a 20-foot life and a forged steel shank hook.I The hoists and trolleys are designed in accordance with CMAA Specification 70 for Class A and Class C indoor service and ANSI B30.2, Chapter 2-1 to the extent to which they are applicable. Hoists and trolleys XCR-40A, XCR-40B, and XCR-40C, along with a transfer rail, are designated for servicing the Main Steam Isolation Valves, XVM-2801 A through C. Directly below the hoists and trolleys on elevation 412' of the Intermediate Building are located the Component Cooling Heat Exchanger, XHE-2B-CC, the Component Cooling Pumps, XPP-1A through C, and the Motor Driven Feedwater Pumps, XPP-21A and XPP-21B. A preliminary study has shown that under the worst conditions a dropped Main Steam Isolation Valve would not penetrate, but would deform, the floor of elevation 436' at the point of impact. Procedures are being written to define the operation of hoists to minimize the consequence of a dropped Main Steam Isolation j Valve. l l 1. The lift as given is the maximum from the eye of the hook to the top of ! the beam; the actual lift as installed may be equal or less than this maximum. l l J l l - Whert / Commonwealth 2-25 1 l
<x 2.23 10-Ton Bridge Crane and Electric Cable Hoists I 1 V
The 10-ton bridge crane and electric cable hoist XCR-42 is located in the Hot Machine Shop on an elevation 436' at column lines R.2 to S and 11.6 to 7.8. The crane is shown on Figure 4 along with its safe load' path which encompasses the entire 436' elevation of the Hot Machine Shop. Crane XCR-42 is supplied by the American Chain and Cable Company, and both the crane and hoist have a capacity of 10 tons. The crane is an
+
underhung, single beam, motor driven, center drive crane. The crane has a 24-foot lift and a forged steel shank main and safety hook.I There are pushbutton controls for both the crane and ho;'.g t for the l full length travel of the bridge. The crane and hoist are designed in accordance with CMAA Specification 70 for Class A and C indoor service, and ANSI B30.2, Chapter 2-1.
, Crane and hoist XCR-42 are designated to handle loads in the Hot Machine Shop. The safe load path is defined as the Hot Machine Shop i which contains no components necessary for the safe ahutdown of the plant or decay heat removal, and on this basis can be excluded from
- any further study or concern.
i
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
[ g
~Y I Gdbert / Commonwealth
! 2-26 l l . - - -
- _ .. ._- .. _, . _ _ _ ~.- _ _. -_
.- . = _ . .=. --, .
2.24 10-Ton Bridge Crane and Elretric Cable Holst C~'S
/
The 10-ton bridge crane and electric cable hoist ACR-43 is locs'ad in the Service Building and shown on Figure 1 along with its safe load path which essentially encompasses the Service Building Machine Shop. Crane XCR-43 is supplied by the American Chain and Cabic Company, and both the crane and hoist have a 10-ton capacity. The crane is a top running, double beam, motor driven, center drive crane. The crane has an 18-foot 11-inch lift.and a forged steel shank main and safety hook.I There are pushbutton controls for the crane and hoist for the
- full length travel of the bridge. The crane and hoist are designed in accordance with CMAA Specification 70 for Class A and C indoor service, and ANSI B30.2, Chapter 2-1.
4 Crane and hoist XCR-43 are designed for General Service Building application in the Service Building Machine Shop. Since the Service
~ Building contains no equipment necessary for either the plant's safe shutdown or decay heat removal, the crane can be excluded from any further study or consideration.
1 1 l 4 d i j 1. The lift as given is the maximum from the eye of the hook to the top of the beam;.the actual lift as installed may be equal or less than this 4 maximum. Gdbert / Commonwealth 2-27 I
~s 2.25 3-Ton Bridge Crane with Electric Cable Hoist The 3-ton bridge crane and electric cable hoist XCR-46 is located on elevation 463' of the Auxiliary Building at column lines P to Q and 8.8 to 11.5. The crane, associated monorail, and safe load path are shown on Figure 5. The safe load path encompasses the area of the Chemical Volume Control System's Concrete Filter Plugs, the area under the associated monorail, and the Filter Hatch to Drumming Station.
Crane, hoist, and monorail XCR-46 are supplied by the American Chain and Cable Company. The crane and hoist are each 3-ton capacity. The crane is an underhung, single beam, motor driven, center driven type crane, and the hoist is an electric cable hoist. Along with the crane is an associated monorail that can interlock with the crane so that the hoist can transfer filter plugs to the Filter Hatch. The crane and hoist are controlled remotely to remove the operator from
- the potentially radioactive filter plugs. The crane is designed in i \-) accordance with CMAA Specification 70 for Class A and C indoor service, and ANSI B30.2, Chapter 2-1.
Crane XCR-46 is designated to remove the concrete plugs and spent filter cartridges from their housing and transport the spent filter and cask to the Filter Hatch. In case of an inadvertent drop, control of the r:Jivactive filters could create a handling hazard. Procedures are being developed and design modii' cations studied to prevent a drop and minimize the potential hazard. t Gdbert/C- 23 2-28
. ~ _ . _ . - - . -~ _
f-~g 2.26 10-Ton Bridge Crane and Electric Cable Hoist V The 10-ton bridge crane and electric cable hoist XCR-47 is located in the Drumming Station at elevation 447' at column lines P to R and 8.8 to 9.5. The cr.ae and hoist are shown on Figure 4 along with its safe load path which encompases the low level waste storage area. Crane XCR-47 is supplied by the American Chain and Cable Company. The crane and hoist are both rated for a 10-ton capacity and the unit has a 14 foot lift.I The crane is a underhung, single beam, motor driven, center drive crane, and the hoist is an electric cable type with a forged steel shank hook. The crane and hoist are controlled remotely with a control panel to remove the operator from close proximity of the low level waste storage area while operating the crane. The crane is designed in accordance with CMAA Specification 70 for Class A and C indoor service, and ANSI B30.2, Chapter 2-1. Crane XCR-47 is used to handle shielded and unshielded low level waste storage containers in the storage area. Procedures are being developed to ensure the safe handling of the storage containers.
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this '
maximum. O ! Gdbert/ Commonwealth 1 2-29 _ , ~ , _ _
2.27 1-1/2 Ton Hand Chain Hoist and Plain Trolley U-~ The 1-1/2 ton hand chain hoist and plain trolley XCR-48 is located on elevation 412' of the Turbine Building at column lines B.8 to D and 12 above the Instrument,and Service Air Compressors. The hoist is shown on Figure 9 along with the sale load path. Hoist XCR-48 is supplied by the American Chain and Cable Company, and is a 1-1/2 ton capacity, manually operated, chain hoist on a plain trolley. The hoist has a 17 foot lift and a forged steel shank hook.I The hoist and trolley are designed in accordance with CMAA Specification 70 for Class A and C indoor service, and ANSI 30.2, Chapter 2-1 to the extent to which they apply. Hoist and trolley XCR-48 service the Instrument and Service Air Compressor, XAC-3A and XAC-3B. Two hoists service one water box at a time. Since the Turbine Building has no components necessary for the l plant's safe shutdown or decay heat removal, these hoists can be O
%/ excluded from further study or concerns.
i l l l
- 1. The lift as given is the maximum from the eye of the hook to the top of the beam; the actual lift as installed may be equal or less than this maximum.
Gdbert /C. . _ __ 2 2-30
. ~ , . . - _ _ _ . _ . _ , . _ _ . _ . . _ _ __ _ ,-.. _ .__.__,____ _.._ _._ _ . _ , _ _ . _ _ . _ _
7m3 2.28 10_-Ton Bridge Crane and Electric Cable Hoists V The 10-ton bridge crane XCR-51, and electric cable hoist, XCR-50, are located on elevation 436' of the Service Water Intake Screen and Pump House directly above and behind the Service Water Pumps. The crane and hoist are shown on Figure 8. The safe load path, also shown on Figure 8, includes the complete service area behind the pumps and under the monorails over each Service Water Pump. Crane XCR-51 and hoist XCR-50 are supplied by the American Chain and Caole Company. The crane and hoist are both rated for a 10-ton capacity, and have a 57 foot lift.I The crane is an underhung, single beam, hand operated crane, and the hoist is an electric cable , hoist with a pushbutton control station and a lifting beam. Associated with the crane and hoists are three monorails, one over each Service Water Pump, that can interlock with the crane. The hoist and crane are designed in accordance with CMAA Specification 70
-) Class A and C indoor service, and ANSI B30.2, Chapter 2-1.
O Crane XCR-51 and hoist XCR-50 are designated to service the Service Water Pumps, XPP-39A through C, and the Traveling Screens, XRS-2A through C. Within the safe load path, the Service Water Pumps are necessary for the safe shutdown of the plant. The only time the crane and hoist are in operation is when an associated pump and screen are being serviced. When the pump and screen are being serviced they are isolated from the Service Water System, and at the time are no longer necessary for the plant's safe shutdown. The three Service Water Pumps have a 2 out of 3 redundancy. Procedures are being developed to ensure that the hoist does not travel over operating Service Water Pumps and Traveling Screens.
- 1. The lift as given is the maximum from the eye of *.he hook to the top of g- the beam; the actual lift as installed may be equal or less than this
\ )/
maximum.
\l,, t Git **./ Commonwealth 2-31
~3 2.29 2-Ton Twin Hook Extension Hoist (d
The 2-ton twin hook extension hoists XCR-53A, XCR-33B, and XCR-53C are located in the Reactor Building at elevatica 475' on the Loop B Steam Generator Wall. The safe load path is the area covered by the CRDM Cable Support Structures and the space directly above it. The three hoists and the safe load path are shown on Figure 5. Hoists XCR-53A, XCR-53B, and XCR-53C are supplied by P&H , Harnischfeger Company. Each hoist has twin hooks rated at 2-ton. The hoists are equipped with a handwheel for manual operation, and are capable of an 18 foot lift. The hoists are designed in , accordance to ANSI B30.2, Chapter 2-1 to the extent to which it is applicable. The three hoists are used to lift the CRDM Cable Support Structures during refueling or maintenance outages. Since the hoists are only i used during cold shutdown, the hoists can be excluded from any
-) 'd further study or concern.
i f 1 Geert/C . - -#3 2-32
2.30 1-Ton Jib Crane - Rad Waste Package O As part of the Rad Waste Package there is a one-ton capacity jib crane, XRW-11. Since this crane's rated maximum capacity is under the heavy load limit of this study it is not considered further, and is included herein only for reference and completeness. The one-ton jib crane is located in the Drumming Station at elevation 436' at column lines Q and 7.7. It is shown with its safe load path on Figure 4. 1 I l A 2-33
. . .__ _ __ ~._ ..._ _ , _ _. _ _..-. _ .- _. _ __, _ . _ _ _ _ . - - _ _ . . _ _ _ _ _ _ _ . _ -
(-s., 2.31 3-Ton Jib Crane - Rad Waste Package y/ As part of the Rad Waste Package in the same area as hoist XCR-36 is a 3-ton jib crane, XRW-13. The crane is at elevation 436' of the Drumming Station at column lines Q and 7.8 to 8.7. The jib crane and its safe load path are shown on Figure 4. Jib crane XRW-13 has a 3-ton capacity with an electric cable hoist supplied by the American Chain and Cable Company. The hoist utilizes a 3-ton load beam as a handling device. The hoist is controlled by a pushbutton pendant station. Crane XRW-13 is designed in accordance with CMAA Specification 70 and ANSI B30.2, Chapter 2-1. Jib crane XRW-13 is designated to handle the spent filter and their storage casks that were lowered through the filter hatch from elevation 463' by hoist XCR-48 and places them in t^.porary storage. Procedures are being developed to ensure the proper handling of these filters to minimize the possibility of an inadverdant drop. %J O GdbertK_ 3 2-34
2.32 Reactor Building Equipment Access Hatch Crane The Reactor Building Equipment Hatch has a permanent crane arm attached to it at elevation 463' of the Reactor Building. This crane arm is used to swing the equipment access hatch door out of the hatch opening along a guide track when necessary. By definition of this report, this crane can be excluded from further study since it is not an overbead handling device. The crane and hatch are located in a designated safe load path as shown on Figure 5. i i t l l t i Gdbert /Canmonwealth 2-35
10 9 l 8 l 7 l 6
/ ,
l A B l f. C c RENTYn"c N
- 0 74 STRUCTURE FH 5
y[/} +
/
1
~
3 = a' " ~- AB s
< + RBx S1 9 -
DG
~;,w ra m e J -
[ U D im"!P' CB ' Tbt n9 e~"[ r TB .. / tsg WATER
' E' -
Y$ SEntnCE BusLDING Q i ' o y o
~
PLAM t ! H 1
- w. . ;, . . . . ; . . . . g ,.
(
t t h 5 4 l 3 l 2 l 1 a A
- 1. BUILDING DEllGhAfl0N5 A B ==' -
CB =L D G = "'"'" " FH a ' =""' IB :='" RB ="- S W P H =='" TB =L
- 2. SALL delle 8eefl0NS CONflNUOUS F20ll I l FLOOR TO CEltlisG NOT CONflNUOUS FRom D FLOOR TO CElllhG 3.l/ ;il LOAO PAf45 Fi P H
- 4. $AFE $NUTDOWN EQUIPutaf Cuws
- i. l - -l F
- s. Ewf N0. DESCRIPfl0N 250 BACNiht SHOP CRANE. 18 7011 (ICA-43f 250 sATEu TREAfutui BJILDING CHEulCAL STORAGE OUILOlhG. 2 TON N0lli (IC A-20) _
U a SOUTH CAROLINA ELECTRIC & GAS CO. VIRGIL C. SUMMER NUCLEAR STATION Site Plan Figure 1 p A 101:1-lll11INIOl61112llCIOINITllHIVlYllLlOlAIDlSllNIPIPISI CAI Dwg. C-021-001 s
)
10 9 8
) l l l 7 l 6 A N 3 0 ,k+, h 1 . e (- O a
l F N
- KEY PLAN E
@ 4, 7 P '-
O,, = g . y. ["[ o 10 20 30 40 50 60 @ 4 C GRAPHIC SCALE IN FEET PL AN AT E L. 400'-0" s s N o b h O b
@7 _
ro,uggur . g, esove 7 g 0
._ g ,.,.
E
@d
- f. [l g
h" T -y o 3 g 9-2 ig - FT L";_ J O!
/
g[_.. O IA B , g
., O F Q o -
j O, 'O , _ _ g . . a
,. 4 j; ~. -+ - J. - @l- .IQ $/r/k; ::i g PI / / if 4 - g _._ \ \ \o ._s- j._
gf i o 4 /l I
, ,. (h) f e ,, ,,
PL AN AT E L 374'-O' H g
- x. . , _ ;.o 1
,p, ,; ; ;
e
P u 5 l 4 l 3 l 2 l 1 EQPT 10 0($CRIPf lou i BMR PUuP A 7 RMR Puu, e A 3 kMRISPRAY PUuP #00u I COOLING UNIT PLENuu 4 Anal 5Ptaf PuuP ROOM 2 COOLING Unif PLINUu 5 CHARGING /$AFEff INJECfl0m PuuP A 4 CHARGING /5Af ttf INJEtilou Puut a
~
EQUtPhlENT I CMARGING/SAFETT INJECflDe PuuP C HATCH (ABCVE) e CMARGING/5AFif f INJECfl0m PuuP 200111 C00LIIBG UNif 9 CHARGINGl5AFEff INJECfl0N PuuP ROcu 2 CF LING UNif 10 CHARGING 15AFiff INJECTION PuuP B00is
- AING UNif
, - 29*. 6* ~
2f O' @~?"'-3" ~ * -~ 3l 3* """ PU"P " ' I " "0 ' 'C"'# ' 12 RNR PuuP S. 5 TON N011f (ICA-208) B 13 Rf ACf0R tultalNG sprat PuuP A. 5 ION M0lli (ICR.214) to RE ACTOR BulLDING SPaaf PUuP B, 5 TON Mollt (ICR-tie) 0 - 15 CHARGING /$AFEff INJECfl04 PuuP A. 5 TON McIlf (ICR-Saa) o I i le CMARGING/$Af tff INJ[Cil0N PuuP 0, 5 TON Mol$f (ICA-548) - l , , , , if CnARGING sAFiff INJtCliON PuuP C. 5 ION Moisi (ICA-54C)
~ - % d p . /c :
o a L m c o g 0
- m-Q "0 '. /
O -
-s .. ~
m - cx 0
~
g.
. .t, .
o
, D _
M 'A U $
~
x gi Ch ,2 nt t
-__-c :] +
j u_ : v sa n i Ra
', T,- -
7_.__g [AC._ 10 0 M~1 ' E l S. ( O =x -- V gy-m O -
<~<-
A: '
.O ._
g ,r.. r G lw,< ~. G
! ! hA ;- (Asovtf \
e i ! l l c SOUTH CAROLINA ELECTRIC & GAS CO. PL AN AT EL 388'-0" & 397'-O' VIRGIL C. SUMMER NUCLEAR STATION Plan at Elevations 374'-0", 388'-0", and 400'-0" 1 Figure 2
~
A 10121-lllll INlol6lll2l lCIOINjTl lHjVlYl lLIOlAIDISI INIPIPj5l l =
f 1
) 10 l 9 l 8 l 7 l 6 N
9_,,..- @ .
,,-o- Eb ,,x @_u @ se.<_
l (. RE ACTOR BUILI A / O/ , $ PENT
/ /,/ f rutt 7
[ /~ . l'/h,V//IS -k " g -D ' O e I? g~0w
=
n _ al ; 8 KEY PLAN @ --+ d2 -- o-t] - - - a rouieurut saicus , Dp a M 0 10 20 30 40 50 60 g"" . 4 n O a GRAPH!O SCALE --- C IN FEET
.? : s O -
h 2 9" ha t-'" = ,- ?$ ,.
@a s --t . p .0 s -.--
l: ' u o
'o
(_) l ' OOO
.j I 5 -! ._D o , Y I '=== i '...- OO i '9 .a 3 g- -
1 i
+ '
a bE N y \, , % Q ,
- 0 -. ,
, ::~ . 54 ABM78'N\. sh' p.. p _.7. ;_f. % %
g ,
. ._&. g og ,
7 ., l s~ f r* tl [f~'32n"!s"'
= ~~
h-l
, , (7'" , _ -
b_n4 ). - . . . ,- c :-l
- A E
- h. .
p $
;i- --
p9 a i g
.vU 'h"" ._ __ M d . courutur l$EFp - lShh N i , gg .
n_. -. _ l b""" ej CB O
--[- -.. I i
f n e i a 4 l mm V ' d-i
-y f
_j_ b; ^ 9 a a _.. l k. i ph_l-______ MITu i . b; r j' l I<- H Mb*~' 6O @ h O -- @ @\@ O O O
~#
A PL AN AT EL 412 - tz)
- w. , _ p , , , , ; , , , , 3 ; ;
T y 4 l 3 l 2 l 5 l 1 r9'- 6' 2 5'- 8" 2 5'-8' DiSCR IPi t on kNG m k4=E .
,- p-- l 25 REf utting RATER STORAGE Tant 27 =0f 0R CONTROL C(NT(R 20 00f 04 CONTROL CthfER O- -"r 29 RNR Mitt (ICMANGER A 3 ( 4 30 RMR Miaf (Ichancts a f ..
{._.~ ..h _ 31 $tRVICE O Af tR 800$f tR PuuP A _
- - 32 stRviCE elf tR 300$fER PuuP 9 ; o , ,
p acy j lr- " 33 4Af f tRT A 8 d-N O 34 BAfftRT s ' ' '],'] 7 A R CM R IB g N I
- 37 Saf fERT CMARGER I Af te EQUIPwE NT EQUIPME NT aatca
- ^~
, Er -, g;;ca) 3. OiitRi.of P4.it A
- 39 Disf Risur ely: PAntt 3
'""5""5'"
~
.g. .. PL AN AT EL d'34'-0"
41 Hv4C E0ulPutut 34ftR CMILLER A -
- 42 NVAC EQUIPuthf 94ftR CHILLkR $
l ,
,f
{ 43 Hvat 10UIPutief 94ff R CNILLER C 44 MTAC IQUIPutui Befl4 CMILLER PuuP 4 Q assrc y 45 MVAC E00lPuthf 9AftR CMILL[R PuuP 3 48 HVAC (QUIPU [h1 BATER CNitL[R PuuP C C lo ., , R A .,, , R . . . 40 Cour0NEnf COOLING MEAT IICHAmGit 4 [ 3 b el CouPONENT C00 Lins utaf IICmenctR e SO ColsP0htlef C00 Ling PVuP A oo j. 3- ,, _. . . .L , , uP .
,, .P0... L ,.. ~uP C S3 IUR5lhE ORivin Est#GINCf f tE0stif t Puur ~ . RE IT R BUILDING .' , ss uCTOR ORivin tuttumCv ettese tR PuuP e o 3,
i, - , / .;i"f,( l se twt sit iRAns# R PuuP A sf rust Oit Itasett PuuP s se ewL ont IRansret PuuP ia x.
- i t.2, ' ,ll ,, ,w t 0,L ,R A.,,t e ,uuP ,
4-
- so Gruttaf 0R neutsat TRansatt son a ,f y 9aooo ,o ., . .t R A ,0R .t ., RA, , R A. ,, ,R ,0. . ., fur.I. OR,. . i R ,C. ,uuP., nCR.33, C3 O o/ . .--rouiPuiNi *> cic 5A'P 'at's Pao' o* att A 2 fa' <<oi-a) 4 ,
p O j , g*,;cg e4 cCict P AniPe om=Re.:f w "' E
,P" w , =
i 0 - i ';';
.93 (9 i (9 _
O MHm 9 l k) I m <, o i I
@ DG %) %4 l k & ,
renum O [@N'g A o s_2{ ,0*_+ 2 0'; 6"_ 4 sJm 2 2*- 3" I 2 2'- 3"
-g ,S ' N. ,bf GUIPWE NT p3 '9 SOUTH CAROLINA ELECTRIC & G AS CO.
f L*A) ' L'B 0'8') gg[ch VIRGIL C. SUMMER NUCLEAR STATION a
- M-~
e [ Plan at Elevation Q A4== c-o2i-oor 412'-0" 0" F.gure 3 ,
^ N' ~ ~
A K)l3l-lIlll INIOl6lIl2l KlOINlTl HvlYl ILIOlAjDISl !NjPlPlSl
9 8 7 l 6 10 l l l l n 9m O @
@ O k e --t- q l
A _ y {-
..~ ~# ~
gg4] h g - f 00 ]d f _ Slua' t Pli 1 i a m m sA : 7.. i } ~.MLQ _ A."/ y l O<"MLC
@;,- 'l yW g' +=i- -
B KEY PLAN - g Q , ,-
- r. 3 Jg T-)., J1
~
f *# - l j ] jy M _ mg u_ _ 72 it - 3- T r i O 10 20 30 40 50 60 bk .) ] GRAPHIC SCALE ,? # - a N
, c IN FEET N u $b y
5
'. g so,ugjut ;
Y ABgD["Y 9 W l o - ga \ ! L - , E ._ g . o
} ~ - -.._. ... .
O o _ { b,- j rr
-+ ~ -
4-- g _ t E _ o .__ s \ D \M
~
9 _ g
~ ~ ' -^~)r M. P -
k" =
..ok / IlU _ _ _ _
1 1 ___
, 0 i A "5' g h * ..
l l @k i----- t _. -_--- ,, -l , _h, 0 M -
, 2 ---
j b h kkbhh b !" gkk
~ '39 hg We%".
si c CB . J - r i
/tip:v a A ,A 24 &' .. m { j_ e a , ,l G // /' [/ "
E g, 99 . ,,o {k i yp O J f - - -c. - li' >% .
'w, $ <r Qc,J h i
{,
~ ,I $h ~ & ' >~ ~
c-T@ V 9)'7% o H
,s , .. I /1 1 1\ w @@ $@@@@ e@@($IS@@@ dl@'@ @ @'8
- f. --
x .i _q11 1 1
;. i 1 1 g g g - _ _ _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ l
-1 h 5 4 l 3 l 2 l 1 . gCPT EQPT
_.-{ -J gyygg --} g DE1C# iPfl 0N .1E. OfIt'IPI O g p lLROADL HATCH (AL*0vt) Il RifutLING sArtR STORAGE TAna Itt DIE 5EL GENERATOR A s '
._. g ,.--l il PRES 5URI2E R 129 DiEsit GENERATOR 0
_.___g,,._. _ . A.- -- *-- 77 STE Ad GENERATOR A 12t GENERAT0lt LOCAL CONTROL PANEL A 4- - _N2 2 S
- S" Il STE A$ GENERATOR 0 122 GEleERaf 02 LOCAL CONTROL PANEL 9
[ b r-*4 N ~ -
} l{
y
- r. 79 STEAD GENEsaf02 C 123 AIR RECElfERS, GENER4f0R A 124 Ait Rittivt#1, GENERaf 0R 9 r- - - 1 .- 2 % 'g et PRC5 INsf R CONTROL RACE Pit 0f SET 181 125 FUEL CIL Cat TANil A
'. !s )~
{
- 4) f~
02 PRCS INSTR CONTROL RACE PR0f SET 15 12g FUEL Of L CAT IANE O 1 I #y/ , $3 N$5 AURILIARY RELAT RACE 3 127 EICifER CONTROL PANEL 4
- ~
L- - - - 1 b, _ . . M 04 120v INTERfit 4, N155 120 E AClitt CmfROL PANEL 0
' _ kg g--7 p ,' '
05 N155 AUItLI arf RELAT RACR 2 l}$ Olt1EL GENERATOR A. SUPPLt F AN A g
, g T 88 $$PS Catlef TRAIN O 130 OIESIL GENEtaf 0R A, SUPPL 7 F AN O
[ j x 't 47 $$PS filf PANEL TRAIN O 131 DIESEL GENERAfDs 0, SUPPLt F AN A
.l 8 ,
g ' t , et 55PS CA9l NET TRAlil 4 132 OIESIL GENERATOR 0, SuPPLT F AN O _ J-b 7MY'--- f ,Q b
^ , ,, , 89 $$PS ftSI PANEL TRA'N 4 133 NOT WACM $NOP CRAlit,10 TON (ICR-42)
C 3 I 6 i h l
-[
- 90 N551 AUllLI arf Ritaf R.CR I 134 LCg LyL g41ft 5folt CRN,19 Ime (ICA-47) -
91 I20V INVERTER 4,18$$ 135 RActalTE Faciliff CAN.20 TON (ICR-36)
- -( IPWENT 92 PRCS INSTR CONTROL RACA PR0f $Ef i 136 Alt fRANE, 3 f m (Ins-13-90) , , 93 PRCS INSTR CONTROL RACE PR0f SET 11 13p jl3 CRANE, a ION (ire-II-80)
{ TENDON GALLERY le 1299 INytRfER 3,1t$$$ 133 IOUIPutNT IIATCM, S TON (ICR-27) ACCE55 95 s0P INSTRueENT PANEL, TRAlis 0 139 malN sfu isth watut 4,10 ION (ICA-40A> C 94 i E AUIlLIART RELAT R4CA 140 uAIN Sf 3 !!LN VALVE 0,10 TON (ICR-400)
~ 97 80P INSTRuuENT PANEL, TRAIN A lei saim Stu isLN VALVE C,10 f 0N (ICR-40a ! $$ 120V INVERTER 2, NS$$ - 142 CNEulCAL 5fta AGE,1/2 TDM (ICR-31) g -
99 120V INVEtitR 8, #313
' 143 CSL GEN SLOG CRANE A,210N (ICR-234)
I 100 AUIILI ART $1FtGUARO CA0l NET, TRAIN 8 79 1 44 OSL GEN SLOG CRANE 0,2 ION (ICA-298)
\
B - .- 191 ESF LOAO $10utNCE PANEL, TRAIN O 102 E$F LCAO SEQUENCE PANEL, TRAIN A 103 Aulltl ART SAFEGUARD CAlllEI, TRAIN 4 45 EQuirufut NafCM, it im (ICR-It) let IENDON GALL ACS NATCM,1 TG8 (ICR-34) ( #
/ j 104 1207 INVERTER 7, NS$5 ) IIS UCC - lug 1082I
[ _
/
[ e I 7 106 440V ssifCNGEAR 0 197 720cv stifCMGE AR 8 O '2 8 5" '8"' ' l 109 CONTROL ROOu ETACUAf tm PANEL 4 _ r 110 CONTROL R00u tv4CUAfl0N PANEL 0 4 ] *
/ 112 Rt4CTOR PR0f ttfl0N UF/UV PANil.
[// (QUIPME t 13 CouPohtuf COOLING PuuP SPEED SflTCM A 114 Cour0NENT COOLING PUuP $ PEED StifCN 0 HATCH
- E l lil CouPONENT C00ilNG Puur $ PEE 0 SWITCM C IIS CouPONElti COOLING TRAN5fER $sliCN
% ,/ 117 C0mPONENT COOLING Spit 0 SE CL8 UNif A 110 COMPONENT COOLING $ PEED 59 CLG UNif 0 h
v x Oc DG e ,,, e
~
d 9 @ 8/i a e e
- SQ N M. r-. m ,._a ,- ,- - s a ; 7 .-... f ' .. .g()
Mh.gM : NOdM
- i N
. I woNon Ait /f Ea p 7 (2A -
mt Q31WfM
.m , .
l
,L' r,
L-f1 Nl g-= mt A&@ qq j h 0 M \"~OIU"-f , SOUTH CAROLINA ELECTRIC & G AS CD. e; .' 4 --- 7 W, / i - VIRGIL C. SUMMER NUCLEAR STATION
@- @: 8888 <ij8- 'EQ NT c PL AN AT EL 436'-O" Plan at Elevation pl ,
436'-0"
---x A4h oorj PL AN AT EL 45f-O' ngure 4 I h 4 CAI Dwg. C-021-004 , ne _, . u.-- - i
] \ ' 10 9 8 6 l l l 7 l N
e e 6 --n A \ ; HAT
-wN ,
FH n w t a a. e ueQ=pu e -- --\g ;o~ ma + - SP(N
@I _ , , _ m FUEL 8 '
KEY PLAN :9,
- =
y _ _ e- _ _ _ _ . _3_. g_ . a
.e .
M v - , ,. k,I
~"
O to 20 30 40 50 60 -; GRAPHIC SCALE "' .a i C IN FEET h;;d ' b. EQ H MFNT .
@{I - - ,
EJ
,,e .e ~
e gh
,x . n ? _
n - g_ __o yL g.j g D -
't GAB J g E ? ,
O fg, , P p! g , a n a 0 - l IrHS
, O.a ,O 2-,e j
O~9 j l h~ _-(', - o
,o n 0,/
gt__. _ g i z . g I .
;~Le
- m -d AC
~ ~
o ! : 5
,l +?; C i :B e
o ,/ i, . W, _~% m .
~
J - p _ ,__ - i : : d'g]
.l M k2 D a (i:, ~i a j 3
m 1 gl i j[][ 179 "' Q @% }i) @ h l . (
, . .. _ ,. ; , . ,,; ,,,3 ; ;
5 4 l 3 l 2 l 1 5 h 6^* @ @ @ 1 ~E., e r1 s.. i- -
- 4) 'I' ,, ,.E,,UR ,,R me ' fi-
"T ^
iSFfC D
,XJ - .M Jl M
lll::"::::'::: 79 $f tad GEllERif0R C L
**'-d Ill SCRic AC10 f ans a 152 80#1C AC10 f ant a _
7 N ll) 400V $sifCwGiat TS4 WCC IUC1002V T 155 WCC Iucl0821 a e
' g, UI 8 I , g -- -
IS$ bl$ C0h30LES 1. fl. Ill. ANO IV T* , domei
- 4 157 NAIN C0hfROL 90aRO g
.l 'e~
150 MVAC C0uf ROL 80 Allo . --o .. ""'"""r1 9 159 WCC IIIC10a!I
'1 1 [= + d ! " 180 BCC IuCIta2X
---) 0 t \h isl 4 av i'ifCMGE AR 182 480V $3lTCNGE AR -
- ' 103 7200V selfCNGEAR N E vf FUIL I44 7200v $81TCMGE AR SW AM its RE ACTOR TRIP selfC.eGEaR ISS DIESEL GENERATOR A. EInauST SILENCER DECON ARfA C
RB 187 OIESEL GEleEEAf 0R S. EIMaulf SILENCER I 177 ISO SPENT FUEL Plf BRIDGE Caste (ICA-002) \_ _- Ill FUEL MAM0 List BulLDING CRaut (ICR-803) LOAO P ATM O , ife rioiR A40u.G CRA E. im. mt oC.-4 f ift RE ACTOR SUIL0lhG POLAR CaamE (ICR-004) LCAD PafM I ~ 172 RE ACTOR CAVlif WAmiPULAT0ll CRant (ICA-001) 173 wt ACf 04 tuf LDING EQUIPutui ACCES$ NATCM ME AO (9/u SC-4) f QUIP 64f N7 If 4 CRou CABLE SUPPORT PLATFORu A. 2 TGe (ICR-534)
#' HAICH f fS CR05 CABLE SUPP0Af PLAfe0nu 4, 2 ION (ICR-530) .l -
ife CRou Caste suPP0af PLafr0RW A. 2 TON ota-s3C) 1 _ D g 177 NEs FUEL ELEVATOR el#CH (ICA-45)
. g _ / I. - .-.- - --.{
170 Pli0fEI Ca0LE REEL (ICR-IS) PA#f CF ICR-002 lIg RKL fluusFIA canal CATES, 3 TQs telst (Imag) Palti 0F ICRC3 7
- f'- l!r . ~ ! l +-
a 77 . , na
'r. .s _ .! ,
t p g t"T
-a M AT(H E s 4 i
M _ 3 , Q I \$ j k r g .g
,B ,
U L* - l < DG r i = 2 g
,/ !
j 8
- iN 0- A 5 . _ _ - . _ _
fp _
, 3 SOUTH CAROLINA ELECTRIC & G AS CD.
g g g g VIRGIL C. SUMMER NUCLEAR STATION Plan at Elevation PL AN AT El 463'-d' 463'-0" d- Figure 5 a h A& C-oa-00? KEl-lllil INIOl6]Il2l ICl3lNITI lHlVlYl lLlClAjCISI lNIflPj3l [ CAI Dwg. C-021-005 ! A t
i i g 10 l 9 l 8 l 7 l 6 N 7 .' l A - N m - 1 + 0 ,
,,.c 8,y 0 ,u e, , r. , .- w -
96 - - i d a KEY PLAN. i 0 . k1 7 T g_ .
~ , O h.h III L '
- __
5 0 10 20 30 40 50 60 2 0 4 GRAPHIC SCALE g IN FEET m I r _4 Oa t m c i, cxc3
'o y d
y 0 l
~
_2 g_ _ . ._ _ II o ? i - l g __S
~T Lic.~ U_ ,,
e i j A.B rrma
- c. ,
gy v-
- y ,1 I
~ '
l I g_;__ , _ ._ _ _ . _ J 9 . F (-5 210* __ i-2,= Q, ' g_ L _ __ __ y)g i ! l
@F -- -
PLAN AT EL.4,
- , . j C : ' ;
* 'R L__ L_
G g(.. -l ._.- 1] Rl I 'q- - _ _ __ _ j ,
@ g ? W i i i i i ig U..SS 2
i H gi ' ' ' $ P L A N AT E L. 4 8 2'- O" a
' 96 . - - w....... , , 1 l .
} s 4 l 3 l 2 l 1 !
EQPI 10 OflCRIPflosi
)$ PRE $$URllit 77 5itau GlutRATOR A A ft litAu GthfRaf0R 0 79 lfttu GlutRAf 0a C 151 30Ric ACIO TAhR A ~~
152 80Ric ACIO f ast I _
~
209 til M ACf0R SullalhG POLAR CRANE (ICR-004) 172 M ACTOR Caflff NANIPVtaf 0R Caskt (ICR-801) ly! 281 REACTOR DUILDimG C00LlhG UNii I A i A5 ::: natt0R sustainG c00ti=G unir 28 293 REACTOR Bull 0 lug C00LihG Ulili 10 B 0] 214 RE ACTOR tulL9'nG C00tlNG Unit 28 ft1 Con 1ROL acou N0auAt SUPPLT AIR PLENUW A
- ,- 76 M4 203 19 20s COuta0L #0cu nominal suPrit AIR Pitmuu e j 207 REL AT ROOu $UPPLT PLENUM &
7[ -
, e.. nu, R00m suPPt, Pu.Um . - ),- r. . AU,lt AR, .<04 0D I . . A,C.. , ,0. C. A < ,CR.i . , 1 RB l .
pw; c
]
s i.----, -f
' i! r a
w ll
~
l l ,, - gw w:3; , y ,. 1: 7 ?>: 3 -htb' ,j ,: i-l \ _ .' - D
- - -y 7s, -g /, gum .x.. -1 W
[Q
-s m .,,
s I h
,jy - - x; % r, , .t +
vm g:_ e n. : s 9; . g r,
, f-i PL AN Ai E L. 5 5 2'- O' f
202 g,,, 78 2os F [ _ p, l
, , A4mm c-o2i-oor G
SOUTH CARGLINA ELECTRIC & GAS CO. VIRGl!. C. SUMMER NUCLEAR STATION Plan at Elevations 485'-0", 482'-0", and 552'-0" Figure 6 GAI Dwg. C-021-006 f i A IC161-lilli INIOlull2l lCICINITI lHIVlYI lLIOlAlDlSl lNIPIPISl { i
10 l 9 l 8 l 7 l 6 )
\
A B A F F.g G.3 g4 CRANE SPAN i I I
.' r A r a .. '
C 1 1 1- l . l p- ll-
,. ~~- . . _
l l l l
\' '
TOP OF RAll '.'s EL. SOf-( N
'g Lv .
yy n\ 242 o ., T,: 0; . 24. -: r m .l M
+ EL. 463*-O" \' R - ,u o
u_ / 4[ ' -
! ^;
I \ l i - heONORAll gg 4 36*.o" ,. C Z _p ._ _. 4-
. ; -m / "r !
ll -- - ], I i , 46 49 l . l 4E'r ! "O-" O Ie ! I' i ,& l . .; ' . :_ , ms,_,,.... 4 l1 , s._, s_., t [. .
,tiyT------1,'g F - N x p -_ _ _ _ _ _ _ . , . ,E--p .--7, .dih_ : -- : .E_'./
_ y ,, ' _ _ _ _~_~, ~_ _ r a SECT!CN A- A LOOK H f
-- w. r_ . ,1 1 1 1 , ;. , , , , ;. 3 ;.
- 6. ' .. "T'.. ......A.. '
-' = j 4 3 l 2 l 1 h 5 l l t0PI 1 DESCRIPilm ,
49 NVAC EQUIPUENT WATER CHILLER A et CouPONENT 300 LING NEAT EICHANGER A 49 COMPONENT COOLING NEAT EICHANSER S A rj 52 .0uPONENT COOLING PUUP C
. 76 PRES $UMllER 77 STE AW GENERATOR A 10 STEAM GENERATOR 8 183 CouPONENT C00L'NG PUuP SPEED 5tifCM A 111 CouPONENT COOLING Pump SPEED SilICH COOLING UNII 4 . IlO CouPONENT C00llNG PJuP SPEED IflitM COOLING UNIT 3 h d 140 BRIN STEAu 150LAil1 VALVE 8,10 TON (ICR-408) 183 REACTOR TRIP $tlTCAGEAR
[ 0 j 188 SPENT FUEL Pli BRIDGE CRANE (ICR-802) f, . lll FUEL MAN 0 LING $UlLDING CRANE (ICR-003) s t l lil RE ACfDR SUILDING POLAR CRANE (ICR-004) lit RE ACTOR Civlif EANIPULATON CRANE (ICR-001) s s s 74
~'
177 NEW FUEL ELEVATOR WINCH (ICR-45) TOP OF RAll _ EL.9 M-O" , 202 RI ACTOR BulLDING COOLING t'uli 2A 204 IIEACTOR $UILDING COOLING UNII 29 231 CONDENSER DATER 80I, le ION N0lli (ICR-25A) 241 SAIN STE AM STOP A80 CONTROL VALVE 4 TON N01ST (ICR-24 l f 242 TUR9tNE SulLDING CRANE (ICR-if) C 174 Pil0TEI C1DLE REEL (ICR-It) PART Of ICR-002 l R- e lit fuel TIMNSFER C4r.L GATES 3131ICl$f (ICMI) PaAf 0F I:3003 I 16 9 179
\ -
_- 3 , , / _ 17 2 f F [
\ . EL. 94-6 76 ' ,, Y " - i '
___ D 37 7 { l - t FH '" = 1 H 16 8
! 7 , , , , ,, ' ' ' ' EL. 468-O" +
y .
~_ = --= - .__ -' ,. a w 3
b_ j \ ! - - 7 ,' I I I F'
'W.
EL. 4 36*-O" E Jo O 4
~~ -
i rs = he l
'lB . m ' _ u _
l 3 _
? . 412'-O'
(_) F ! . j lx x l - ING WEST a SOUTH CAR 0tlNA ELECTRIC & GAS CO. VIRGIL C. SUMMER NUCLEAR STATION General Section A Looking West Figure 7 l i GA1 Dwg. C-021-007 A lO171-lll11 lNIOl6lIl2l lClOINlIl lHjVlYl lLIOlt DISI IN!PIPlSl # l
9 I J 10 l 9 l 8 l 7 l 6 A Tr m i v ' F- 9 B ; } WN yd pp : L c%xd pN C A LQh l' X d' _jgiea SWPH ~ ! lj l U-EQulFWENT
= --7-**
T H ATC H (ABOV E) / hhhh h h ass PL AN AT EL 425'-0"
=
E PLAB SWPH f ,t..,,.,.
. x. !, f hG ,, rt. 43s-e l 'l ~
F , _x , 4
# 2 . p A '--
i - a ge Uz65 l $ l . m h
! r m /l et no-s li -[..;- .,-l
- , ll ll ll ll ::
re t- ' t- ' S Uzs2 SECTION B-B H ( j .
, . .. . . y . . 1 1,,,,3 ; 4
{ s j 4 l 3 l 2 l i [ EQPT to OEscaiPflom 250 SERVICE WATER PuuP A 251 SERvlCE WATER PuuP e A N 252 SERVICE .ATiR PUuP C 253 480V SelTCHGEAR 8 254 T200V SWITCMGE AR 8 255 SPEED SELECTOR SalTCH 258 uCC INCittlI 25T SERVICE DATER F HOUSE SUPPtV F ANS (i AND 3) 265 25 O25s 25 258 440V $ slim
- s 4 259 NCC IG.t Att 280 **JV $t1TCHEEAR
* ' . $ PEED $ WITCH n 282 TRANSFER stlTCH Q'O g ..
N q 283 SPEE0 StliCM 284 BCC IuCIECII
' ~
285 $1RvlCE EATER PUuP MOUSE TRANSFER RAIL,10 TDs 10 37 (101-51) _ E 288 SERvlCE enfER PUuP A,10 TON d0lli (ICR-50) C O.Q dR"J i l B rei SERVICE sATER PuuP B.10 TON H0l$f (ICR-50) ad
~ 1 .f 284 SERVICE EATER PuuP C 10131 HolST (ICR-50) 289 EQUIPufki NATCN. 2 TON NONORAIL
- q. .-./ W
.c -
c y '? 2 Q .4 wi f 1 if _ 5
]1 / /
~
, 2 m' ~1 ,
D G G e e' e ro'-o* _ 4-l 8 6*- O" l E l AT EL. 436'-O"& 441'-O" i _ F l O 10 20 30 40 50 60 G GRAPHIC SCALE IN FEET SOUTH CAROLINA ELECTRIC & GAS CO. VIRGIL C. SUMMER NUCLEAR STATION i Service Water Pump House Figure 8 a GAI Dwg. C-021-008 p 10l8l-lll1l lNIOl6ltl2l lClOlNITl lHlVlYl lLlOlAIDlSl INIPlPISl
I 10 9 l 8 7 l 6 i l l
/ , N A
l 3J + L b KEY PLAN d B
'lS's'0Inf "*"" _
0 10 20 30 40 50 60 GRAPHl0 SCALE IN FEET C I
..I _ __
I I L_ . . .
,_ \
1 r1- r1 F1 r'1 r1 al {\,
~ .EJ LJ LJ L:J LJ LJ L-J A y='"J **"" m ,tt " 1 f b ?)4ql (\ . -U N ,) k.;. ; g e - 'Ja INSTRUMENT AND SERylCE 7: ^;
y 7 1- f J
'g[__ , l D AIR COMPRESSORS O til .m- - '~
_. c: - 4 '] l .
\ ! I e ~. ~
Jl CII3 [ 234 233 a C - b- ; - g g J ,- ,
, , l, , I ,. ,
4 s aR . i
= % I i, aii' a 3 f-f 3 -l l 1-b IN )-@ 4- t , _ _) -
- > _0, o l.
i I I O T [--- fp- - -f'! fl f~ W-f1 , fl ;, LJ ;L J g g LJL i k
'I i e i t t 4
I _ 28'-0* _15'- 6* 2 8'-0* _ _ 2 8'-O' _ 2 8M ! _ _ 2I 3' 6 . '28 t '. G
@ hh h h >h h'v i 'yh, GD PLAN AT E L . 412 '- 0 ~
H t
- w. r-o , tu_1 iiiiiii; ; ;
1 l h 5 l 4 l 3 l 2 l 1 l E0PT 1 DESCRIPTION 228 FEEDWATER 000$fER PUUP A, 4 f(DI HOIST (ICA-28) 22I FEEctifER B00$fER PUNP 9, 4 ION N0lsi (ICR-25) A l 220 FEED 9ATER 800$fER PUuP C, 4 704 N0lli (ICR-28) ) 229 FEEDWATER 800$fER PUuP 0, 4 TON H0IST (ICR-24)
]
230 FEEDaafER 500$TER PUMP 14 THRU 0, 4 TON N0lli (ICR-26) 231 C0@ENSER WATER 80s,10 TON N0lli (ICR-25A) _ 232 CONDENSER WATER 801. le TON Holli (ICR-258) 233 ColCEN$ER BATER BOI, le TON HOIST (ICR-2SC) 234 CONDENSER WATER BOI,10 TON N01st (ICR-250) 230 229 228 227 23s lesTRAENT AW SERVIG Alt CGrlESSOR,11/2 T3d MIST (ICA-4) B l AW - l 1 , E) *- U
? !
f t 3f* t t
,I
( ": , r1 ~ r1 ,_I r1\
/ n r r 'LJ LJ J L:.) L:. ..
M ? F E E0 w ATE ll BOOSTER PLWPS '! f I _ [] [
]& i -
w =D - E a u
.Ws a * -it e n B 5
[ , l
.. o q -E 8 -e b, w- Q [@
a + _g- _ _ , g cj _]-
-g _ __ t, _
i y
~
l _e_ e g l l
~ -e u- E l [ _ - r *- E- !@
Mt n rr - '
- A '
k o o O ',t g q@ + f> .. t
~ _
cQ) Ill- - m-- E Drl L@
! t d EiE I! l 2f ,
s .b ,i o try-5" J,, D I i l
- ] . ___ {'}._ . . ___ f * . _k 7 '
I _ 4 ,
\ 2 8'-V a e'.6 2 s'd 2 e'd 5 G A% c-ozi-oor SOUTH CAROLINA ELECTRIC & GAS CD.
VIRGIL C. SUMMER NUCLEAR STATION Turbine Building - Plan at Elevation 412'-0" Figure 9 4 I GAI Dwg. C-021-009 l AI Fet91-lIIII INI0l611121 lCIOl NIT l lHlVlYl lLl0lAlCiSl lNlPlPlSl !
I j 10 l 9 l 8 l 7 l 6 N I - A - ! i ll j i
-] 4-N g KEY PLAN EQUIPMENT HATCH 0 10 20 30 40 50 60 ll GRAPHIC SCALE ll ll ?
IN FEET % .: .: A c I
--+---%>---- 'v7 i l__. h( ll ,JI \
I i I
@, (Li _
u
; g i < '$ ~2 MAINSTEAM $TCP 4 g <: _
AIL , , @@@ S><3 . .' " * ' "'- EQUIPM E N T H ATCH . I l D y I l _ , _ _1 ]_ , _[__[1 2 3 ,. ,' .
, *1~
Q @
-+
g: . .
/s x y x j ; . N / N /__ /I'N ~ '1 ~ ]~ lg_ - - ~~7 \.
(j / \ / ! E __1_ { {k
/ !:,- g Q
y, L: jJ . .
,...........j "^'c" - , , ~
EGj',Py,ji o
'mptJ _q % g', 4 e m Fw:
Y llllllllllllll r[ h /
/ 4[ C OhjL_;
g .. j - _f N m __ . 7-- '
~
l K IQato m _ iSrl_2e:o' _2 8d _ 2e v 2 r-s* .L_2 oc o
@ @ @ @ @ @ @N E Ou lPME NT HATCH (A BOV E)
PLAN AT E L. 4 36'- C H t
* * *
- W. I' iir I I I,
. I I ,
h 5 4 l 3 l 2 l 1 A A9 8 I! !! U- .O O . .-r m.. h .. . L i . Y _ s-l E QUIPME N T J HATCH (ABOVE) C
~[b 4i( II L 4' i
(a f J
- ~
j%i.t iiF Ah* h';j +a f [, Mge)
, 't - _
i EE-
$d P 'Yl ~p % ,y Norts:-
q/ D eL- - I. EQUIPuENT MATCHES SMCWN COVERED ST TUR81NE
' ~
l . BUILDING CRANE. I E 7 - y _ C- _. I i 4-- EQUIPWENT l , H ATC H ( GOVE) H ATCH (ABOVE) g-d l
/ % -t--- d iJ E -~
r& . m pr 49 ,
, L,t=_ -t_+
_v=
'1__- =- . n-W,_
QMi __ h ' LF _ 2 e'-( - 2 8'-cf _ 2 8'-o" z__ 2e'4 ,
@ @ @ @ O o F E E D
- AT E R A c-oz i- c o r HEAIEE$
l SOUTH CAROLINA ELECTRIC & GAS CD. s VIRGlL C. SUMMER NUCLEAR STATION h Turbine Buflding -- Plan at Elevation 436'-0" Figure 10 , GAI Dwg. C-021-010 } Ef lilol-lilil INiel6lIl2110dNm Hvid IUCPICRI INlPlPl$l (
s I j 10 l 9 l 8 l 7 l 6 N A - T v h mi] l Si
"'"'^""
s KEY PLAN (MOISTU O 10 20 30 40 50 60 Mu"j'y",57s E 7 GPAPHIC SCALE - c IN FEET N c l l l g i __t i \ t . _ _ L h !OO I '
! -- ' i. , 1 )-
D- ! w o 4 , y" sr :WM/ - 94 D g ;: -
- 7 .p f "[f
'liil +
gr i_ ' tq
..; j 00 - ~
00 ~ 56 { o.o j _ n E g__ _ 3 l f b.MKN; Q n _ / A
/ u aAunoAo sAv E QUI P ME N T MATCH - -- - ~
l$h . 4 F : l g_ s p._t t i ! . z_\ _ __ 28'o' I Gs' _ 2 8' o* _ 28 6 _ 2 e'-6 _2 $ s" _ _ 2 8'- c
@ @ @ @ @ O @
G GENERATOR [BREAKE - Ff ECW A' HATCH AND Md PLAN AT E L. 4 6 3'- C H
.-- w.r_ u r iii1 i1 ii.g 4
9 h 5 l 4 l 3 l 2 l 1 ECPT 1 DESCRIPT ION 241 BAIN STE AW STOP AND CONTROL VALVE. 8 ION H0lsi (ICR-24) 242 ibR81NE SUILDING CRANE (MOOR OUTLINE) (ICR-if) A A9 FARATOR B MAIN STEAM STOP & CONTROL 246 UAt.vE H ATC H i i
-a e- -
i- - -.
} - _
l fd i 4 1 / iB h ~
, ,/ i I I l , y s
_ l l pfl C
, [ [ '
{-
-]Q.i v - - - . - - . /q , ' :I
[ IN l' , Il I g ly) < --
; , D
- . X
*:# gFEE0*ATER Puup L,l
- y ACC E SS M ATCH
-- : - GENER TOR
' ~ ~
'I 7 LUBE CIL -1 - -d puwe H Arch i )( " [, i
-- l -l E
'$ , .i %
j i' I LUBE Olt Co0LER - HATCH f- 3 _r ll q _ p_. _ -\
. .g ~
{ __ _ __C- j _ _ _ _. j g N[ [} _ F
\
P _ 2 e'- o" _ 2 s' o* _ _ z e'- o- _ _ 2 8' o: . _ . , , l@ G @ @ O G GR HESTERS MOISTURE SEPAR ATOR lCH REHEA1ER lA I A4 C zi-cor SOUTH CAROLINA ELECTRIC & GAS CO. p VIRGIL C. SulMIER NUCLEAR STATION H Turbine Building - Plan at Elevation 463'-0" Figure 11 i A lll11-lllll INIOl6lIl2l lCIGINiil IMlVjYl lLl0l AlGlSl lNlPlFj5l GAI Dwg. C-021-011 l 1 k
l l l 1
,,- 3.0 CODE AND STANDARD COMPLIANCE FOR OVERHEAD HANDLING DEVICES %).
3.1 Crane Design As stated in NUREG-0612, Section 5.1.1 and Enclosure 3 of D. G. Eisenhut's December 22, 1980 letter, it should be verified that crane design complies with the guidelines of CMAA Specification 70 and r*: pier 2-1 of ANSI B30.2. As already stated in the individual overhead handling device descriptions, each device design was required by the original Purchasing Specification to adhere to the guidelines of the above standards, and each supplier adhered to the standards quoted above to the extent to which they were applicable. 3.2 Lifting Devices Lifting devices do not comply with either th' requirements of ANSI N14.6-1978, " Standard for Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds or More Nuclear Material," or ANSI (_) B30.9-1971, " Slings". Alternate methods for demonstration of equivalency are provided by a detailed inspection and testing program. Maintenance procedures are being developed to perform i frequent and periodic inspection, which include visual and non-destructive examination of critical surfaces. Periodic load test [ will be performed as necessary to verify structural adequacy of the l l special lifting devices. All rigging and lifting devices are controlled and maintenanced using the plants computerized preventative maintenance program (CHAMPS). Existing inspection and maintenance procedures are outlined in the Virgil C. Summer's Nuclear l Station Operations Mechanical Maintenance Procedure MMP-165.8, "Use and Control of Rigging Equipment". I 3.3 Inspection, Testing, and Maintenance Cranes and rigging equipment are maintained, tested, and inspected to the requirements of ANSI B30.2, Chapter 2-1. The crane and rigging Gdbert / Commonwealth 3-1 i I I - . _ . _ .- _ _ _ _ _ _ _ . ._, . _ _ . _ . . . , _ _ _ _ . . . , _ _ _ . _ . - _ _ - . , _ . . - . , - - . - . _ . . - .
I equipment are scheduled for the specific maintenance tasks by the O- plant's computerized history and maintenance program (CHAMPS). 3.4 Crane Operator Training Nuclear Operations at the Virgil C. Summer Nuclear Station conducts an extensive training program for its crane operators and riggers which meets or exceeds all the requirements of Chapter 2-3 of ANSI B30.2. The Nuclear Operations Maintenance group at the plant conducts a program for the crane operators and riggers entitled
" Basic Operator and Rigger Training Program" which covers the following topics:
a) OPERATIONAL SAFETY PRACTICES AND PREVENTATIVE INSPECTION AND MAINTENANCE b) WRIGHT WIRE R0PE ELECTRIC HOIST c) ANSI B30.16 - 1973, "0VERHEAD HOIST" d) SPECIFICATIONS FOR ELECTRIC OVERHEAD TRAVELING CRANES C.M.A A.
#70 e) WHITING OVERHEAD CRANE - P&H OVERHEAD CRANE f) MMP 165.3, " TURBINE BUILDING CRANE INSPECTION AND MAINTENANCE PROCEDURE" g) MMP 165.7, " MAINTENANCE OF THE REACTOR BUILDING POLAR AND FUEL HANDLING BUILDING CRANES" 5 h) NUREG-0554, " SINGLE-FAILURE-PROOF CRANES FOR hTCLEAR POWER PLANTS" i) ANSI B30.2.0-1976, "0VERHEAD AND GANTRY CRANES" j) OSHA 1910.179, "0VERHEAD AND GANTRY CRANES" k) INSTRUCTION MANUAL MANIPULATOR CRANE
- 1) SPENT FUEL BRIDGE CRANE m) ANSI B30.9-1971, " SLINGS" n) HMP 165.8, "USE AND CONTROL OF RIGGING EQUIPMENT" o) ANSI B30.10-1975, " HOOKS" p) INSTRUCTION OF CRANES:
O 1) Wright Electsic Hoist 3/20 Tons
. Geert /Commorwealth 3-2
p 2) P&H-Turbine Building 220/30 Tons
\-) 3) Polar Crane-Reactor Building 360/25 Tons 2
- 4) Manipulator Crane-Reactor Building
- 5) Whiting Overhead Crane-Fuel Handling Building 125/25 Tons
- 6) Spend Fuel Bridge Crane-Fuel Handling Building The crane operator and rigger training programs include in-class written examinations and in plant examinations for practical application. After a crane operator or rigger becomes qualified by the training program, an annual physical examination and a biannual retraining and requalification of the crane operators and riggers are required.
O l 1 i 1 - 3-3 l
) 4.0 PROCEDURES G
Because of the construction stage of the Virgil C. Summer Nuclear Station, most procediares for handling heavy loads with overhead handling devices are still under development. At this time maintenance procedures are being developed to encompass overhead handling systems with respect to the safe load paths. Where safe load paths can not be established, special lifting procedures are being developed, and where possible special lifting instructions are incorporated into specific component maintenance procedures. Any deviation from established safe load paths will be enforced by established procedures. Procedures have been treassitted from Westinghouse Electric Corporation to South Carolina Electric and Gas Company for the Handling of New and Spent Fuel, Refueling, and for the Operation of Refueling Equipment. These procedures are being reviewed and placed into a standard format prior to issuance and use. l The individual overhead handling device descriptions in Section 2.0 i indicate where procedures are being developed to minimize the possibility of an inadvertant heavy load drop. 1 (-
~_
Geert(Commonwealth 4-1
5.0 CONCLUSION
This report identifies areas in the Virgil C. Summer Nuclear Station where an inadverdant drop of a heavy load from an overhead handling device could cause damage to components necessary for the plant's safe shutdown, decay heat removal, or into areas where the drop could cause an uncontrolled radioactive release. Safe load paths have been identified for each crane or hoist where physically possible to minimize the chances of an inadvertant heavy load drop and its consequences. The safe load paths will be permanently marked, where practical, on the floors and walls of the plant, and all riggers and operators are receiving training to fully understand and adhere to the safe lord path concept. In addition to the safe load paths, special operating procedures are being prepared for overhead handling devices in the plant and where possible, incorporated into standard component maintenance procedures to define the handling of heavy loads by cranes and hoists. These b v/ procedures are being incorporated into the plant's operator and rigger training program. This report will be followe.d by a nine month report as required by ! the December 22, 1980 letter of D. G. Eisenhut. The nine month report will follow the guidelines as outlined in Sections 5.1.2, 5.1.3, 5.1.5, and 5.1.6 of NUREG-0612 and Sections 2.2, 2.3, and 2.4 of Enclosure 3 of Darrell G. Eisenhut's December 22, 1980 letter. The nine month report will outline the procedures and required design modifications necessary to minimize the possibility of an inadvertant load drop and the drop's consequences. The nine month report will also include the results of studies conducted to analyze and minimize the consequences of an inadvertant heavy load drop operating in the Fuel Handling Building, the Reactor Containment Bui,d;4g, and other plant areas. Gdbert/ Commonwealth i 5-1
- - .. ._ _ - . - _ _ - - _ - - - - - - - - _-.}}