Other: ML19341A422, ML19341A424, ML19341B423, ML19341C004, ML19341C007, ML19343B857, ML19343D035, ML19343D039, ML19351A069, ML19351G105, ML20003A648, ML20003A650, ML20003A653, ML20005A189, ML20008E635, ML20010B899, ML20010H761, ML20010H997, ML20030D756, ML20031B542, ML20031D162, ML20031D166, ML20031D172, ML20031D176, ML20031D178, ML20032B192, ML20032B195
|
MONTHYEARML19340D1571980-12-15015 December 1980 Response to Intervenor Carolina Environ Study Group 801107 Addl Contentions Re Hydrogen Generation Control.Contentions 5 & 6 Should Not Be Admitted in Proceedings.Certificate of Svc Encl Project stage: Request ML19341A4241981-01-12012 January 1981 Proposed Tech Specs Sections 3 & 4 Changing Explosive Gas Mixtures in Tanks W/Radioactive Effluents & Deleting Requirement for Hydrogen Monitor in Waste Gas Holdup Sys Project stage: Other ML19341A4221981-01-12012 January 1981 Forwards Proposed Tech Specs,Changing Explosive Gas Mixtures in Tanks W/Radioactive Effluents & Deleting Hydrogen Monitor Requirement for Waste Gas Holdup Sys Project stage: Other ML19351G1051981-01-23023 January 1981 Unexecuted Amend 4 to Indemnity Agreement B-83,changing Amount of Financial Protection Project stage: Other ML20003A6501981-01-23023 January 1981 License NPF-9 for Facility Project stage: Other ML20003A6531981-01-23023 January 1981 Notice of Issuance & Availability of License NPF-9 for Fuel Loading & Zero Power Testing.Amend 4 to Indemnity Agreement B-83 Encl Project stage: Other ML19341B4231981-01-23023 January 1981 Memorandum & Order Affirming ASLB 801225 Order.Authorizes Director,Nuclear Reactor Regulation,To Issue License NPF-9, Permitting Fuel Loading & Zero Power Testing at Unit 1. Certificate of Svc Encl Project stage: Other ML20003A6481981-01-23023 January 1981 Informs That License NPF-9 Has Been Issued Authorizing Fuel Loading & Zero Power Testing.License & Notice of Issuance Encl Project stage: Other ML19341C0071981-01-28028 January 1981 Notice of Issuance & Availability of Amend 1 to License NPF-9 Project stage: Other ML19341C0091981-01-28028 January 1981 Safety Evaluation Supporting Amend 1 to License NPF-9 Project stage: Approval ML19341C0041981-01-28028 January 1981 Amend 1 to License NPF-9,revising Wording to Prior to Initial Criticality from Prior to Fuel Loading Project stage: Other ML19343B8571981-01-28028 January 1981 Revised App a Tech Specs Page 3/4 8-3,correcting Surveillance Requirements for Diesel Generator Project stage: Other ML20008E6351981-02-23023 February 1981 Tech Specs 3.4.7.2,3/4.5.1,3.5.1.1,4.5.1.1,3/4.5.3,3.5.5.3, 4.5.3.1,4.5.3.2,3.8.1.2,3.11.2.5,4.11.2.5 & Tables 3.4-1, 3.7-6 & 3.3-13 Re Oxygen Concentration in Waste Gas Holdup Sys,Hydrogen Monitor Requirements Et Al Project stage: Other ML20008E6331981-02-23023 February 1981 Application for Amend to License Submitted as Proposed Revision to Tech Specs Project stage: Request ML19343D0351981-04-0202 April 1981 Amend 2 to License NPF-9,correcting Typographical Errors & Revising RCS Testing Requirements Project stage: Other ML19343D0381981-04-0202 April 1981 Safety Evaluation Supporting Amend 2 to License NPF-9 Project stage: Approval ML19343D0391981-04-0202 April 1981 Notice of Issuance & Availability of Amend 2 to License NPF-9 Project stage: Other ML19351A0711981-06-12012 June 1981 Notice of Issuance of License NPF-9 Project stage: Approval ML19351A0691981-06-12012 June 1981 License NPF-9 for Facility Project stage: Other ML20004F6891981-06-17017 June 1981 Proposed Changes to Tech Specs 3/4.8.1,3/4.3.3.7 & Table 3.3-11 Re Fire Detection Instrumentation Project stage: Request ML20004F6851981-06-17017 June 1981 Application to Amend License NPF-9,consisting of Proposed Changes to Tech Specs 3/4.8.1,3/4.3.3.7 & Table 3.3-11 Re Fire Detection Instrumentation Project stage: Request ML20005A1891981-06-19019 June 1981 Notice of Issuance & Availability of Amend 1 to License NPF-9 Project stage: Other ML20005A1871981-06-19019 June 1981 Safety Evaluation Supporting Amend 1 to License NPF-9 Project stage: Approval ML20010B8991981-08-12012 August 1981 Proposed Revised Tech Specs Re Setpoints,Surveillance, Listings,Response Times & Measurements Project stage: Other ML20010B8951981-08-12012 August 1981 Application to Amend License NPF-9.Change Includes Revising Setpoints & Surveillance Requirements,Correcting Measurement Range of Unit Vent Noble Gas Effluent Monitor & Revising Surveillance Requirements.Class IV Amend Fee Encl Project stage: Request ML20030D7561981-08-28028 August 1981 Amend 3 to License NPF-9,modifying Surveillance Requirements for Auxiliary Feedwater Suction pressure-low Pressure Instrumentation Project stage: Other ML20030D7591981-08-28028 August 1981 Notice of Issuance of Amend 3 to License NPF-9 Project stage: Approval ML20030D7581981-08-28028 August 1981 Safety Evaluation Supporting Amend 3 to License NPF-9 Project stage: Approval ML20031B5421981-09-0303 September 1981 Notifies That No Known Public Correspondence Re Amend 4 to License NPF-9 Exists Project stage: Other ML20010H9941981-09-21021 September 1981 Application to Amend Ol,Changing Tech Specs by Correcting Setpoint Associated W/Reactor Trip Initiated by Turbine Trip.Class III Amend Fee Encl Project stage: Request ML20010H9971981-09-21021 September 1981 Proposed Tech Spec 2.2,correcting Setpoint Associated W/ Reactor Trip Initiated by Turbine Trip Project stage: Other ML20010H7611981-09-21021 September 1981 Requests Extension of Completion Date for Review of TMI Action Plan Item II.D.1 Re Relief & Safety Valve Tests Until 820701 Project stage: Other ML20031D1781981-09-22022 September 1981 Advises That No Known Public Correspondence or Irreversible Impact Associated W/Amend 5 to License NPF-9 Project stage: Other ML20031D1721981-09-23023 September 1981 Amend 5 to License NPF-9,correcting Setpoint Associated W/Reactor Trip Initiated by Turbine Trip Project stage: Other ML20031D1751981-09-23023 September 1981 Safety Evaluation Supporting Amend 5 to License NPF-9 Project stage: Approval ML20031D1761981-09-23023 September 1981 Notice of Issuance & Availability of Amend 5 to License NPF-9 Project stage: Other ML20031D1661981-09-30030 September 1981 Notice of Issuance & Availability of Amend 6 to License NPF-9 Project stage: Other ML20031D1621981-09-30030 September 1981 Amend 6 to License NPF-9,extending Date for Full Compliance W/Relief & Safety Valve Testing Until 820701 Project stage: Other ML20031D1641981-09-30030 September 1981 Safety Evaluation Supporting Amend 6 to License NPF-9 Project stage: Approval ML20031H5181981-10-19019 October 1981 Advises That Fee Waived for Issuance of Amend 6 to License NPF-9,per 811021 Application Requesting Extension of Completion Date for Qualification Tests for Power Operated Relief & Safety Valves Project stage: Approval ML20032B1951981-10-27027 October 1981 Notice of Issuance & Availability of Amend 7 to License NPF-9 Project stage: Other ML20032B1941981-10-27027 October 1981 Safety Evaluation Supporting Amend 7 to License NPF-9 Project stage: Approval ML20032B1921981-10-27027 October 1981 Amend 7 to License NPF-9,revising Tech Specs to Change Instrumentation Setpoints,Correct Monitor Measurement Range & Revise Snubber Listings Project stage: Other 1981-06-12
[Table View] |
Proposed Changes to Tech Specs 3/4.8.1,3/4.3.3.7 & Table 3.3-11 Re Fire Detection Instrumentation| ML20004F689 |
| Person / Time |
|---|
| Site: |
McGuire  |
|---|
| Issue date: |
06/17/1981 |
|---|
| From: |
DUKE POWER CO. |
|---|
| To: |
|
|---|
| Shared Package |
|---|
| ML20004F686 |
List: |
|---|
| References |
|---|
| TAC-46812, NUDOCS 8106220182 |
| Download: ML20004F689 (2) |
|
Text
-
~
00 Seu
(
x,'
bd
-~
g
'en
-TABLE 3.3-11 (Continued) to to FIRE' DETECTION INSTRUM_EN_T_S.
3-
. e, n
8'
. - =.
M hk MINIMUM INSTRUMENTS OPERABLE *
- 'P Fire Description Location Smoke Fixed Temperature /-
E Zone Rate of Rise Z
79 Safety Inj. Pump IB GG-54 El. 716 2
2 80 Aisle / Cables GG-55 EL. 716 12 12 91 Corridor / Cables EE-53 EL. 733
'4 4
92 Corridor / Cables JJ-51 EL. 733 6
6-93 Corridor / Cables NN-52 EL. 733 11 11 94 Aisle / Cables JJ-55 EL. 733 8
8 95 600V MCC IEMXB-IEMXB3 FF-55 EL. 733 1
1, 96 Cable Tray Access EE-55 EL. 733 1
1
.103 Corridor / Cables MM-51 EL. 750 6
6 104 Hatch Area Cables LL-53 EL. 750 7
7 106 600V MCC IEMXA FF-54 EL. 750 z t w
ls 108 Aisle / Cables JJ-55 EL. 750 13 13 115 Corridor / Cables JJ-54 EL. 767 13.
13 w
5, 116 HVAC Equip. Area / Cables NN-52 EL. 767 7
7 130 Cables /0il Fuel Pool PP-52 EL.'750 4
-4 134 RB Pipe Corridor 215 - 270 5
0 135 RB Pipe Corridor 270' - 315 5
0 136 RB Pipe Corridor 315* - 0 6
0 137 RB Pipe Corridor 0 - 44 4
0' 138 RB. Pipe Corridor 44* -'90 4
0 119 RB Pipe' Corridor 90 - 126 4
0 140 RB Pipe Corridor 126 - 173 7
0 141 RB Below Oper. Floor 329 - 349 7
0 142 RB Below Oper. Floor 13 - 29*
4 0
143 RB Below Oper. Floor 34 - 51 3
0 144 RB Below Oper. Floor 51
- 124 13 0
145 RB Below Oper. Floor 124* - 143 3
0 146 RB Below Oper. Floor 143 - 167 8
0 147 RB Below Oper. Floor RCP - lA 4 1
l t
.g
- .?
4.1 TABLE 3.3-11 (Co'ntinued)-
12
/$}
FIRE DETECTION INSTRUMENTS-E;.
rn MINIMUM INSTRUMENTS ~ OPERABLE *
.a
.c-
- =5 Fire.
Description Location Smoke Fixed. Temperature /.
- -4 :
Zone Rate of Rise
~'
148 RB Below Oper. Floor RCP -118:
dF ' l
-+- T 149 RB Below Oper. Floor RCP - 1C 3 24 1
j 150 RB Below Oper. Floor RCP 1D 4
4F.
I-'
~
-151 RB Below Oper. Floor VP Filter' Bed' 2
2-152
.RB Below Oper. Floor VP Filter Bed 2
-2.
153 RB Annulus 293" - 331*
10 0
.154 RB. Annulus 324* -JO*
4-0 155 RB Annulus 0* - 50 5
0' j
156 Rb Annulus 50 - 80 4
0 157 RB Annulus 80
--123*
24 0
Ad 158 RB Annulus 123
.165 22 O
^
159 RB Annulus 333*
16*
13 0
Y 160
-RB Annulus 16 - 54*
23 O'
El 161 R8 Annulus 122* - 180 16-0' 162 RB Annulus
-180 - 256 13 0
127 fuel Pool Area MM-50, EL. 731+6 10 10
~
.)
WThe fire detection instruments located within the containment are not required to be j-operable during the performance of Type A Containment Leakage Rate Tests.
4 4
6 Y
e
- -