ML19351A071

From kanterella
Jump to navigation Jump to search

Notice of Issuance of License NPF-9
ML19351A071
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/12/1981
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19351A070 List:
References
TAC-46812, NUDOCS 8106250198
Download: ML19351A071 (2)


Text

- _ _ _ _ _ _ _

UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-369 h

MCGUIRE NUCLEAR STATION, UNIT 1 NOTICE OF ISSUANCE OF FACILITY OPERATING i.ICENSE NPF-9 Notice is hereby given that the U. S. Nuclear Regulatory Comission (the Comission), pursuant to the Initial Decision dated April 18, 1979, and the Supplemental Initial Decision dated May 26, 1981, respectively, of the Atomic Safety and Licensing Board, and pursuant to Commission Order dated June 11, 1981, has issued Facility Operating License No. NPF-9 to the Duke Power Company for its McGuire Nuclear Station, Unit 1.

The license authorizes low power testing and operation at; reactor core power levels not in excess of 5 percent of power (170 megawatts thermal) in accordance with the provisions of the license, the Technical Specifications and the Environmental Protection Plan. The McGuire Nuclear Station, Unit 1, is a pressurized water reactor located near Charlotte in Mecklenburg County, North Carolina.

The Initial Decision and the Supplemental Initial Decision are subject to review by the Atomic Safety and Licensing Appeal Board prior to their becoming final. Any decision or action taken by the Atomic Safety and Licensing Appeal Board in connection l

wtih the Initial Decision and-the Supplemental Initial Decision may be reviewed by l

the Corsaission.

l The Commission has made appropriate findings as required by the Atomic Energy i

Act of 1954, as amended (the Act), and the Commission's regulations in 10 CFR Chapter I, which are set forth in the license. The application for the license complies with the standards and requirements of the Act and the Commission's

(

r egulations.

The license is effective as of its date of issuance, N106u50

I For further details in respect to this action, see (1) Facility Operating License NPF-9 together with Technical Specifications and Environmental Protection Plan; (2) License NPF-9 for Fuel Loading and Zero Power Testing complete with Technical Specifications (NUREG-0759): dated January 23, 1981; (3) Amendment No.1 to License NPF-9 for Fuel Loading and Zero Power Testing, dated January 28, 1981; (4) Amendment No. 2 to License NPF-9 for Fuel Loading and Zero Power Testing, dated April 2,1981; (5) the report to the Advisory Committee on Reactor Safeguards, dated April 12, 1978; (6) the Office of Nuclear Reactor Regulation's Safety Evaluation Report, dated March 1978 (NUREG-0422) and Supplements 1 through 5; (7) the Final Safety Analysis Report and Amendments thereto; (8) the Final Environmental Statement, dated May 30, 1974 and supplements thereto; (10) the Floodplain Aspects of the McGuire Nuclear Plant Site, dated September 3, 1980; (11) the Initial Decision, dated April 18, 1979; and the Supplemental Initial Decision, dated May 26, 1981.

Items 1, 2, 3, 4 and 10 are tailable upon request addressed to the U. S.

Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Divisica of Licensing. Copies of items 6 and 8 may be purchased at current rates from the National Technical Information Service, Department of Commerce, 5285 Port Royal Road, Springfield, Virginia 22161. All items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W.,

Washington, D. C. 20555 and at the Atkins Library, University of North Carolina, Charlotte (UNCC Station), North Caroliaa 28223.

Dated at Bethesda, Maryland, this \\L-day of June 1981.

F)R THE NUCLEAR REGULATORY COMMISSION i

ilinor Adensam, Acting Chief

' icensing Branch No. 4 division of Licensing

.