Other: ML19341A422, ML19341A424, ML19341B423, ML19341C004, ML19341C007, ML19343B857, ML19343D035, ML19343D039, ML19351A069, ML19351G105, ML20003A648, ML20003A650, ML20003A653, ML20005A189, ML20008E635, ML20010B899, ML20010H761, ML20010H997, ML20030D756, ML20031B542, ML20031D162, ML20031D166, ML20031D172, ML20031D176, ML20031D178, ML20032B192, ML20032B195
|
MONTHYEARML19340D1571980-12-15015 December 1980 Response to Intervenor Carolina Environ Study Group 801107 Addl Contentions Re Hydrogen Generation Control.Contentions 5 & 6 Should Not Be Admitted in Proceedings.Certificate of Svc Encl Project stage: Request ML19341A4241981-01-12012 January 1981 Proposed Tech Specs Sections 3 & 4 Changing Explosive Gas Mixtures in Tanks W/Radioactive Effluents & Deleting Requirement for Hydrogen Monitor in Waste Gas Holdup Sys Project stage: Other ML19341A4221981-01-12012 January 1981 Forwards Proposed Tech Specs,Changing Explosive Gas Mixtures in Tanks W/Radioactive Effluents & Deleting Hydrogen Monitor Requirement for Waste Gas Holdup Sys Project stage: Other ML19351G1051981-01-23023 January 1981 Unexecuted Amend 4 to Indemnity Agreement B-83,changing Amount of Financial Protection Project stage: Other ML20003A6501981-01-23023 January 1981 License NPF-9 for Facility Project stage: Other ML20003A6531981-01-23023 January 1981 Notice of Issuance & Availability of License NPF-9 for Fuel Loading & Zero Power Testing.Amend 4 to Indemnity Agreement B-83 Encl Project stage: Other ML19341B4231981-01-23023 January 1981 Memorandum & Order Affirming ASLB 801225 Order.Authorizes Director,Nuclear Reactor Regulation,To Issue License NPF-9, Permitting Fuel Loading & Zero Power Testing at Unit 1. Certificate of Svc Encl Project stage: Other ML20003A6481981-01-23023 January 1981 Informs That License NPF-9 Has Been Issued Authorizing Fuel Loading & Zero Power Testing.License & Notice of Issuance Encl Project stage: Other ML19341C0071981-01-28028 January 1981 Notice of Issuance & Availability of Amend 1 to License NPF-9 Project stage: Other ML19341C0091981-01-28028 January 1981 Safety Evaluation Supporting Amend 1 to License NPF-9 Project stage: Approval ML19341C0041981-01-28028 January 1981 Amend 1 to License NPF-9,revising Wording to Prior to Initial Criticality from Prior to Fuel Loading Project stage: Other ML19343B8571981-01-28028 January 1981 Revised App a Tech Specs Page 3/4 8-3,correcting Surveillance Requirements for Diesel Generator Project stage: Other ML20008E6351981-02-23023 February 1981 Tech Specs 3.4.7.2,3/4.5.1,3.5.1.1,4.5.1.1,3/4.5.3,3.5.5.3, 4.5.3.1,4.5.3.2,3.8.1.2,3.11.2.5,4.11.2.5 & Tables 3.4-1, 3.7-6 & 3.3-13 Re Oxygen Concentration in Waste Gas Holdup Sys,Hydrogen Monitor Requirements Et Al Project stage: Other ML20008E6331981-02-23023 February 1981 Application for Amend to License Submitted as Proposed Revision to Tech Specs Project stage: Request ML19343D0351981-04-0202 April 1981 Amend 2 to License NPF-9,correcting Typographical Errors & Revising RCS Testing Requirements Project stage: Other ML19343D0381981-04-0202 April 1981 Safety Evaluation Supporting Amend 2 to License NPF-9 Project stage: Approval ML19343D0391981-04-0202 April 1981 Notice of Issuance & Availability of Amend 2 to License NPF-9 Project stage: Other ML19351A0711981-06-12012 June 1981 Notice of Issuance of License NPF-9 Project stage: Approval ML19351A0691981-06-12012 June 1981 License NPF-9 for Facility Project stage: Other ML20004F6891981-06-17017 June 1981 Proposed Changes to Tech Specs 3/4.8.1,3/4.3.3.7 & Table 3.3-11 Re Fire Detection Instrumentation Project stage: Request ML20004F6851981-06-17017 June 1981 Application to Amend License NPF-9,consisting of Proposed Changes to Tech Specs 3/4.8.1,3/4.3.3.7 & Table 3.3-11 Re Fire Detection Instrumentation Project stage: Request ML20005A1891981-06-19019 June 1981 Notice of Issuance & Availability of Amend 1 to License NPF-9 Project stage: Other ML20005A1871981-06-19019 June 1981 Safety Evaluation Supporting Amend 1 to License NPF-9 Project stage: Approval ML20010B8991981-08-12012 August 1981 Proposed Revised Tech Specs Re Setpoints,Surveillance, Listings,Response Times & Measurements Project stage: Other ML20010B8951981-08-12012 August 1981 Application to Amend License NPF-9.Change Includes Revising Setpoints & Surveillance Requirements,Correcting Measurement Range of Unit Vent Noble Gas Effluent Monitor & Revising Surveillance Requirements.Class IV Amend Fee Encl Project stage: Request ML20030D7561981-08-28028 August 1981 Amend 3 to License NPF-9,modifying Surveillance Requirements for Auxiliary Feedwater Suction pressure-low Pressure Instrumentation Project stage: Other ML20030D7591981-08-28028 August 1981 Notice of Issuance of Amend 3 to License NPF-9 Project stage: Approval ML20030D7581981-08-28028 August 1981 Safety Evaluation Supporting Amend 3 to License NPF-9 Project stage: Approval ML20031B5421981-09-0303 September 1981 Notifies That No Known Public Correspondence Re Amend 4 to License NPF-9 Exists Project stage: Other ML20010H9941981-09-21021 September 1981 Application to Amend Ol,Changing Tech Specs by Correcting Setpoint Associated W/Reactor Trip Initiated by Turbine Trip.Class III Amend Fee Encl Project stage: Request ML20010H9971981-09-21021 September 1981 Proposed Tech Spec 2.2,correcting Setpoint Associated W/ Reactor Trip Initiated by Turbine Trip Project stage: Other ML20010H7611981-09-21021 September 1981 Requests Extension of Completion Date for Review of TMI Action Plan Item II.D.1 Re Relief & Safety Valve Tests Until 820701 Project stage: Other ML20031D1781981-09-22022 September 1981 Advises That No Known Public Correspondence or Irreversible Impact Associated W/Amend 5 to License NPF-9 Project stage: Other ML20031D1721981-09-23023 September 1981 Amend 5 to License NPF-9,correcting Setpoint Associated W/Reactor Trip Initiated by Turbine Trip Project stage: Other ML20031D1751981-09-23023 September 1981 Safety Evaluation Supporting Amend 5 to License NPF-9 Project stage: Approval ML20031D1761981-09-23023 September 1981 Notice of Issuance & Availability of Amend 5 to License NPF-9 Project stage: Other ML20031D1661981-09-30030 September 1981 Notice of Issuance & Availability of Amend 6 to License NPF-9 Project stage: Other ML20031D1621981-09-30030 September 1981 Amend 6 to License NPF-9,extending Date for Full Compliance W/Relief & Safety Valve Testing Until 820701 Project stage: Other ML20031D1641981-09-30030 September 1981 Safety Evaluation Supporting Amend 6 to License NPF-9 Project stage: Approval ML20031H5181981-10-19019 October 1981 Advises That Fee Waived for Issuance of Amend 6 to License NPF-9,per 811021 Application Requesting Extension of Completion Date for Qualification Tests for Power Operated Relief & Safety Valves Project stage: Approval ML20032B1951981-10-27027 October 1981 Notice of Issuance & Availability of Amend 7 to License NPF-9 Project stage: Other ML20032B1941981-10-27027 October 1981 Safety Evaluation Supporting Amend 7 to License NPF-9 Project stage: Approval ML20032B1921981-10-27027 October 1981 Amend 7 to License NPF-9,revising Tech Specs to Change Instrumentation Setpoints,Correct Monitor Measurement Range & Revise Snubber Listings Project stage: Other 1981-06-12
[Table View] |
Text
F 1
SAFETY EVALUATION BY ThE
.0FFICE OF NUCLEAR REFCTOR REGULAT10t.
RELATED TO N4ENDMENT NO. 3 TO LICENSE NPF-9 OL'KE POWER COMPAN)
L i
INTRODUCTION By letter dated August 12, 1981 the licensee (Duke Power Company) proposes 1
modifications to the Technical Specifications for tne McGuire Nuclear Station, i
Unit 1 ~ regaraing tne auxiliary feeawater low suction pressure instrument l
channels..The McGuire auxillary feeawater (AFW) system consists of two motor l
d-iven pumps and ore turoine ariven pump normally aligned to take suction l
from tne non-seismic condensate storage tank (CST). When low suction pressure is sensea at any AF. pump, its suction patn is transferred from tne CST to tne l
seismically qualified nuclear service water system Dy opening two valves in series in tnat pumo's suction path.
Tnere are two Dressure switches in tne suction line to eacn motor driven AFW pump. Low pressure must be sensed Dy botn of tnese cnannels tone pressure swicen per valve) to effect a transfer.
Tnere are tour pressure switenes in the suction line to the turbine driven AFW pu.no ltwo switcnes 'for eacn serv 1ce water train) wnicn coerate in a sic.ilcr r;: it EVALUAT101.
Unaer tne existina Tecnnical Specifications action statenient for tnese pressure cnanneis, one eacn for tne two valves in series, if one channel fails, tnc licensee nas 4a nours tu restore Inat coonnel tu operecie status cerore takin; l
action to snutcoun ano cocloown tne piant. nonever, anotner action statement is appliec wito mare tnan one pressure channel inoperaole unico requires tne plant be placea in not standby within ? nours, altnougn tne pressure cnannels are for valves in serie;.
Tne proposed m uitication would allow the licensee 4s nours to restare to:
inopercole pressure channel (s) fer tne vaives in scries ror any one AFu puu to UPEhnalt status before declaring tne puna inoceraale. ir.as tne saw ac ti o:.
statement i.oula apply regaraless or anetner one or octn pressure channei; associated aitn any one AFw pump are inoperacle i.e conciuce tnat tnis 1; acceptable since the failure or one or both Cnannels results in the same efts:t on tne AF.. syster. (1.e..- ioss or capabili t/ to transrer nF.. poup suction re-one auxillery reecuater pui:7). If innperabie cnenneis.o e cssociateu uitn mer.
r tnan one pur.a, toen the associateu psaps must or accidrec inoperecie lia ecictui.
..e agree witn tne licensee's conclusion that nis procose cnange coe.
j not alter requirements for recunaant AF,. pumps ano aves not result in any l
aaverse. safety imo11 cations. This enange also is consistent witn'tne requirements of IEEE Sto. 279, anc tnerefore, is acceptabit.
i
)
?
8109160144 810828 PDM ADCK:K OSO<H1369 P
PCWt i
m 2
e-Environmental Consideration-We nave determined tnat tne amena:Lent oces not authorize a'cnonge in effluent types isf total amcunts noran increase in power level and will not result in any significant environmental impact, itaving mace tnis determination, we have furtner concluded that the amendment involves an action wnten is insignificant from tne stanopoint of environmental im9act ano, pursuant to 10 CFR Section 51.5(d)(4), tnat an environmental impact statement or negative declaration anc environmental impact ~ appraisal r,eea nct ce preparea in connection witn tne issuance of this amenament.
, Conclusion-We have concluded, baseo on the consicerations discussed a30ve, that:
(1) because tne amendment does not involve a significant increase in tne probability or consequences of accicents previously consioerea and coes not invcive a significant decrease in a safety margin, tne amenorent does not involve a significant nazaroc consiceration, (2) tnetc is reascnable assur-s.nce that tiie healtn and safety cf tne pablic will not be encangered by I
operation in tne proposeo manner, ano (3) sucn activities will ce conouttec in compliance with the Commission's regulations and the issuance of this a.menament will not bo inimical to tne coramon cefense ana v.carity or to tne nealtn ano safety of tnr publi;.
DATE: AUGUST 2 3 I;3-i