ML20004E734

From kanterella
Jump to navigation Jump to search
LER 81-019/01T-0:on 810526,found Tech Spec Surveillance Requirements for Determining River Water Supply Sys Pump Tdh Not Being Met.Caused by Limits on Nameplate Data Being Too Stringent for Normal Operation
ML20004E734
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/09/1981
From: Rager M
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20004E731 List:
References
LER-81-019-01T, LER-81-19-1T, NUDOCS 8106150135
Download: ML20004E734 (2)


Text

~ ~ ~

b, .* -. ._ .  ! ~. 3. . .. _ . . . _ _ .. . .,

._ . d NAC PCSM Me U.S. NUCLEA3 RE2WLATG3Y COMMISS40N LICENSEE EVENT REPORT CONTMOL 8 LOCK: l l l l l l lh (PLEASE PRINT OR TY'd ALL MEQUIREO INFORMAftONI

. FoTa4 l9 II ALICEN344 to In CCCg Ic 11 l@l 0 l ol -10 ! auCEN34NWMets to 15 l o l o l 01 10101@l 18 24 a iuCEmat t I l lTypt i f iJOl@iSF CAI T 54l@

2 CON'T lClil I 8 "g ,"c' Q l0 15 {0 !O l 0131311 @l 015I ?! 6l RI 1@l016 60 61 coCatgT Nbut ta 6d 69 LVENT Q ATE I. IS In 19 I R 1140l@

AGPCAT QAf t EVENT OEsCAIPTION ANO PROS A6LE CONSECUENCES h 10121 l Uhiln chutdnwn fnr enfunlinn i t wx datorminnd th,t thn Toch Rnne enruni l I

@l llance ream'ts for determining River Water Supply System (RUSS) pump TDH Lo_L4J l were not beino met. Tech Spec 4.5.J.1.c recuires each RWS numo delive 1 8 i r at least 6000 GPM at a TDH of 57 ft or more. Surv tests verified pump i lo is 1 I finw but not oumo head. Pumn testina indicated 3 not nf 4 RMS numns coul  !

10171 I d not develoo rea'd head at ren'd finw. A T,S. chance to modify tho cump 1 i o Ia i i TDH_ requirement was inadvertentiv not _s_ubmittod. -

sa I

CQL CC t SLEC ( COMPCNENT CCOE SUS CE 50 E lo LJ8 l S l F l@ (j) j@ [Z j@ l P I U l M l P I X l X l@ W@ LZj M 7 9 10 tt 12 f3 is sa SicutHTIAL OCCURRENCE REPCRT REVisiCN (VEN? vt AR R EPCpT NO. CCCE Tvrt No.

(mino W

@ ,a(t,'j,;u a

la 11 I l-l lo 1119 I 1011I IT I L-l 10 l

_2i 22 :2 24 a 21 a a ao si 22 CN P NT VtT MCUR$ $8 i FOR 8. $bPe(j g VANupAC a(p 7 N AC C Lxj@L.1J@

>> 2

.l.z._J@

a lZ_J@

1.

2,o l 1 0 101ol L..yJ @ l 2N I@ Iz l@ Iz191919i@ .,

CAusE OEsCainTic* sNQ CCnaECTive ACTicNs @

litoli Tech Spec limits list RWS numo nameplate performance data. These are des _j li t i l I ion specs and are felt to be too strincent for continuous oumo coeration I ml . Tech Spec amendment has beon submitted that reauires RWSS onmos be tes I l i i 21 I ted to verify they will develon rea'd flow with test freo. increased with I mI a low river level. Pumo head reon't chanced to 46 ft ner svs reevaluation. so I

3 1A  % *Cvetm CTwem 17A TUS 5Q CtSCQvERY OESCMiPTTC,N A'

LL1l@ lOl01Ol@l '

NA I La.J@lReview*

of Surveillance Tests I ACTIVITY CCNTiNT stLE ASED ca at L(41E auCUNTC#AC'+TY LCCATICN CP AELEASE li Is 8l 9W @ Lzj@l 7 to it

_ NA 4.

l l

.S NA ao l

' *t*SCNNEL t 88C50815

%uutta Tvrt OtScaiPTICN '

Lt U_] I 010101@l zl@l NA l

, . senn .'L .~,v',,,2 e s

'2 a Nu... eisC.:,rioN@

8, 101ofol@l

. . .. 2 NA l

'#5'. s'".',VCN *'" " @

' $ LZj@l NA l NRC USE ONLY ,

2 o ,L.usu,'f@l"*"eECni,fiCN@ na i liii!Iiii!!!Ii

' " " "*5 8'1%61se135 -

319-851-5611  !

NAVE OF PREPARE A - Matthew S. Racer ,N Oy g .

.- . -- - - _ - , _ _ _ . . - _ . _ _ . . - , - _ _ _ .-- ._ _ _ , _ a_

. .t

/ ^

. .DUANE ARNOLD ENERGY CENTER Iowa Electric Light and Power. Company Licensee Event Report - Supplemental Data Docket No. 050-0331 Licensee Event Report Date: June 9, 1981 R: portable Occurrence No: 81-19 E' vent Description

  • While shutdown for refueling it was determined that the Technical Specification requirement for determining river water supply system pump TDH was not being met.

Technical Specification 4.5.J.1.c requires each river water supply system pump to deliver at least 6000 GPM at a TDH of 57 feet or more. Surveillance tests required verification of the pumps ability to deliver required flow only. Subsequent testing of River Water Suppi,y System pumps has determined that 3 out of 4 of the river water supply pumps were not capable of developing the required head. The fourth pump did deliver the required flow at required head.

  • Plant records indicate that during the pre-startup period in early 1974,'it'was recognized that the pumps could not perform as required by the Technical Specifications.

The intent at that time was that the TDH requirement would be deleted from the Technical Specifications. This change was implemented in our Surveillance Test Procedur,, but was not implemented in the Technical Specifications. .

Cause Description Technical Specifications flow and head requirements used pump nameplate performance data. The limits the nameplate data provides are teo stringent for normal operation of.

river water supply pumps and are not required to meet system performance requirements.

Corrective Action An amendment to Technical Specifications (RTS 127) has been submitted for review.

This proposed revision will change the requirement that the River-Water Supply System pumps must develop a TDH of 57 feet to requiring a TDH of 46 feet. This number was determined to be the actual pump head required to deliver the required flow to the system. Technical Specification 4.5.J will require the RWSS pumps to be tested to ensure they will deliver 6000 GPM at a TDH of 46 feet or more with a test frequency increased with low river water level. In addition the operating RWSS pumps will be demonstrated to deliver 6000 GPM daily. These revisions will not result in the degrada-tion of the RWSS ability to fulfill its safety function. No further corrective action is planned at this time. ,

-N,.