ML19327A460

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for June 1980
ML19327A460
Person / Time
Site: Pilgrim
Issue date: 07/07/1980
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML19327A459 List:
References
NUDOCS 8008060224
Download: ML19327A460 (2)


Text

- . . .. -

,e j G

OPERATING DATA REPORT DOCKET NO. 50-293 l DATE 7/07/80 i COMPLETED BY c c teney TELEPHONE 617-746-7900 OPERATING STATUS Pilerim T Notes l

1. Unit Name:
2. Reporting Period: June, 1980 l 1998.  ;
3. Licensed Thermal Power (MWt): _ _

678.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 655. ,
6. Maximum Dependable Capacity (Gross MWe): 690.

670. *

7. Maximum Dependable Capacity (Net MWe): , , ,
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Nnnp

9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions,if Any:

N/A This Month Yr..to-Date Cumulative

11. Hours In Reporting Period 720.0 4367.0 66263.0
12. Number Of Hours Reactor Was Critical 711.0 1159.0 46139.9
  • 0.0 0.0 o,o
13. Reactor Reserve Shutdown Hours
14. Horrs Generator On-Line 702.3 1066.6 44619.1 _

. 15. Unit Reserve Shutdown Hours 0.O nn 0.0

16. Gross Thermal Energy Generated (MWH) 1221120.0 1730328.0 74821440.0 .
17. Gross Electrical Energy Generated (MWH) 416870.0 _ _ ,

586740.0 24751574.0

18. Net Electrical Energy Generated (MWH) 401031.0 563775.0 23769898.0 . , _
19. Unit Service Factor 97.5 24.4 67.3 __
20. Unit Availability Factor 97.5 24.4 67.3 _
21. Unit Capacity Factor (Using MDC Net) 83.1 19.3 53.5 ._
22. Unit Capacity' Factor (Using DER Net) 85.0 19.7 54,8 __
23. Unit Forced Outage Rate 2.5 3.9 10,5 _,
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

NONE

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Ooeratine ,
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved

. INITIAL CRITICALITY INITIAL ELECTRICITY l ' COMMERCIAL OPERATION 8008060 22p

. t>

e UNIT SilUIDOWNS AND POWER REDUCTIONS m T I NAME DATE 7 /7 /R f1 COMPLETED BY nn un < e ., m, REPORT MON 11g June 617--746-7966 TELEPHONE e.

_ E E yg 'h $ $5 Licensee ,E v, 1, Cause & Co receive No. Date g 3g 4 .3 s y Event gy j3 gu Action to H jE & 3 ;f3 g Report # wU o Present Recunence c

v Q

3 80/05/26 F 0.0 H 4 N.A. IIG DEMINX. liigh D/P Across Condensate Demineralizers due to rust buildup in lines during outage.

4 80-06-08 F 17.7 11 3 N.A IIC llTEXCil Reactor scrammed at 0451 on 6/8/80 due to low vacuum during condenser backwash l 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) Fde(NilRIG D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & license Examination F-Administ ative 5 G-Operational Ee ror (Explain) 1:xhibit I - Same Source (9/77) 11 Other (Explain)

_ __