Forwards Open Items & Resolution of Incomplete Items for 790802 Fire Protection Program Re Safety Evaluation Rept. Requests Response within 30 Days
ML19322E430
Person / Time
Site: Point Beach  
Issue date: 03/05/1980
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
TAC-11079, TAC-11080, NUDOCS 8003280029
Download: ML19322E430 (4)


Text

_ _ _ _

l

/

^%,

UNITE'D STATES 8

NUCLEAR REGULATORY COMMISSION r,

g g

y wAsHmorow, o. c. 2 ossa

\\-

/

March 5,1980 Docket Nos. 50-266 and 50-301 Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin, 53201

Dear Mr. Burstein:

Our Safety Evaluation Report (SER) on the Point Beach fire protection program issued August 2,1979 indicated that you would provide the details of certain proposed modifications for our review. In addition, certain issues were left open pending further staff review.

summarizes the status of the open issues. provides our evaluation of the design description for proposed detector installations (Item 3.1.12 of the SER) and our resolution of the open issue related to detector placement and qualification (Item 3.2.5).

Because these two issues are interrelated we cannot approve the design of the detector systems of item 3.1.12 until-the issues of detector-------- -,

placement method and detector qualification are resolved. Your letter of December 20, 1979 provides a description of detector systems and the proposed method for detector placement. We find these proposals to be acceptabl e.

In a letter dated December 29, 1978, you proposed that the detector manufacturer's quality assurance tests be accepted in lieu of the bench tests for detector sensitivity required by item 3.2.5.

We have concluded that a sufficient bases by which to judge the equivalence of these two test methods has not been provided. Our requirement for the resolution of this issue is provided in Enclosure 2.

Satisfactory implementation of this requirement will resolve both item 3.1.12 and item 3.2.5.

We request a response within 30 days of your receipt of this letter indicating that this requirement will be satisfied.

If, however, you do not agree with this position, we request that you meet with us in Bethesda in the same 30-day period to resolve this issue.

Sincerely, WJ W A. Schwencer, Chief Operating Reactors Branch' #1 Division of Operating Reactors 8ct3380 OM

L

'-A-w-

Mr. Sol Burstein Wisconsin Electric Power Company March 5, 1980

Enclosures:

1.

Status Report 2.

Evaluation of 3.1.12 and 3.2.5 cc: w/ enclosures Mr. Bruce Churchill, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C.

20036 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Document Department University of Wisconsin Stevens Point Library Stevens Point, Wisconsin 54481 6

y

~ *

^ ~

ENCLOSURE 1 POINT BEACH UNITS 1 AND 2 RESOLUTION OF INCOMPLETE ITEMS - 5"'ATUS Licensee Staff Evaluation Response Due 3.1. 2 Smoke Exhaust Inccmplete None 3.1.4 Fixed Water Suppression System Information 11/15/79 3.1. 5 Water Damage Protection Information 3/15/80 3.1.9 Fire Barriers Information 1/1/80 3.1.12 Fire Detectors Requirement 30 days 3.1.14 Cable Separators Information 3/15/80 3.1.17 Hydrogen Hazard Protection Incomplete None 3.1.23 CO2 Hose Reel Nozzles Incomplete None 3.1.24 Diesel Generator Air Intake Structure Information 1/15/80

~3.1.25 Vent Duct Penetration Seals Incomplete

~

N o n e -- " - ~ - " ----" - ~

3.1.26 Auxiliary Building Cable Tray Penetration Seals Information 1/1/80 3.1.27 Containment Building Fire Stops Information 1/1/80 3.1.28 Service Building Penetration Seals Information 1/1/80 3.1.29 Cable Tray Penetration Seal Qualification Information 1/1/80 3.1.32 Fire Hydrant Inspections Information 11/1/79 3.1.33 Control Room Light Fixtures Information 1/1/80 e

-r

---, -,~

,--pry g---

w w-v-w

Licensee Staff Evaluation Response Due 3.2.1 Safe Shutdown Capability Incomplete None 3.2.2 Circulating Water Pump House Fire Protection Incomplete None 3.2.3 Fire Brigade Size Incomplete None 3.2.4 Fire Brigade Training Frequency Incomplete None 3.2.5 Smoke Detection System Qualification Requirement 30 days 3.2.6 Reactor Coolant Pump Lube Oil Collection Incomplete None e

4

-,- e a

.w

..,-,,,,...,wn.<,,,

,+e m

E 4

..w.wm POINT BEACH UNITS 1 AND 2 FIRE PROTECTION REVIEW EVALUATION OF OPEN ITEMS Fire Detectors (3.1.12 and 3.2.5)

Item 3.1.12 of the Point Beach SER deals with the licensee's proposal to provide additional detectors in areas that are presently unprotected or inadequately covered. Section 4.2 of the SER lists these areas as:

Location 1.

Containment, Units 1 and 2 2.'

Diesel generator rooms 3.

Cable spreading room 4.

Betery rooms 5.

At'iliary building, all elevations 6.

Control building, elevation 60 feet 7.

Control room 8.

Electric Switchgear room, elevation 8 feet 9.

Auxiliary feed pump area 10.

Pipeways. Units 1 and 2 11.

Facade areas, Units 1 and 2

12. Auxiliary feed pump local control station
13. Auxiliary boiler day tank rooms 14.

Service building corridor 15.

Turbine building lube oil area, Units 1 and 2 Item 3.2.5 of the SER indicates the requirement of the licensee to verify the a~dequacy of the detectors used at the Point Beach Nuclear Plant and the locations at which the detectors are installed.

During the initial stages of the fire protection review, the licensee did not agree with the review' steam's recomendation that bench tests and insitu tests be conducted to demonstrate the adequacy of their detector installations. They argued that there does not exist'an effective procedure for testing fire detectors in the insitu condition which has industry acceptance in general and NRC acceptance specifically. Therefore, in response to the requirements of the SER, the utility developed their own plan for locating fire detectors. This plan was submitted to the Nuclear Regulatory Commission with their letter dated December 20, 1979.

The development of the plan included input from fire detection systam installers as well as guidance from Draft Reg. Guide 1.120, and standards published by Undenvriter Laboratories and the National Fire Protection Association, 1

The Point Beach plan consists of a fire detector location sheet which lists various physical and oparating characteristics of the area with space for a drawing of the area. Based on the data assembled on the sheet along with site observations, the locations of the fire detectors can be determined using the knowledge and judgement of a qualified person. The sheet requires the signature of the person who engineers the evaluation, the person who performs the survey and the person approving the work. The same plan is applicable for determining the placement of new detectors and evaluating the adequacy of existing detector locations.

The material supporting the utility's plan for detector location includes a decision tree flow chart which identifies conditions affecting the type of. detector best suited for the area. Also included is a detector spacing graph which plots ceiling height in feet against the recommended area coverage in square feet per detector. Noted as background material reviewed in preparation for developing this plan included: Sandia Laboratories NUREG/CR-0488, Nuclear Power Plant Fire Protection Fire Detection and National Bureau of Standards Publication, " Environments of Fire Detectors."

Based on our evaluation of the Point Beach letter of Dece' ber 20, 1979, m

we find that this method of determining the spacing is adequate. There-fore, the modification of item 3.1.12 and the requirement of 3.2.5 of the SER with regard to detector locations are adequately resolved.

~

However, in a letter dated December 29, 1978, the licensee proposed that manufacturer's quality assurance testing of detectors be accepted in lieu of the bench tests required in item 3.2.5.

Therefore, items 3.1.12 and 3.2.5 cannot be totally resolved at this time since it has not been shown that the detectors used at Point Beach will have adequate sensitivity to the products of combustion for the combustibles in the areas where installed. The licensee did not verify that manufacturer's quality assurance tests are equivalent to bench tests done for the detectors and combustibles at the Point Beach plant. The licensee should therefore provide the results of bench tests to verify that the detectors provided at the plant will promptly detect products of combustion from the materials in the areas where detectors are installed.

j i

l l

._