Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis
ML19208A635
Person / Time
Site: Point Beach  
Issue date: 08/17/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
TAC-11079, TAC-11080, NUDOCS 7909170118
Download: ML19208A635 (2)


Text

?

m N 8M ga areg UNITED STATES y ) S s-q ( g NUC1. EAR REGULATORY COMMISSION y

WASHINGTON, D. C. 20555

% [,'h #

August 17, 1979 DocketNos.[Q-2h and 50-301 Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 53201

Dear Mr. Burstein:

In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection.

Since that time, you have perfomed a fire hazards analysis for your facility and have compared its fire protection program with the NRC guidelines.

In late 1976, we set October 1980 as the dat,e for completing the implementation of all modifications associated with this program.

This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications.

For example, minor modifications, adoption of administrative controls and additional portable equipment would be completed within six months; however, major modifications would require a year or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.

We urge you to apply your best efforts to maintain your schedules for completion of all of the fire protection modifications at your facilities and to submit, on an expedited basis, any information that is still outstanding with regard to open items and required design details.

Si ncerely, 7

~~c,',-

LW

, -Carrell G. Eisenhut, Acting Director Division of Operating Reactors Office of i:uclear Reactor Regulation cc See next page g'g%

7 9 0917 0ll%

Mr. Sol Burstein Wisconsin Electric Power Company cc:

Mr. Bruce Churchill, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C.

20036 Document Department University of Wisconsin Stevens Point Library Stevens Point, Wisconsin 54481 Mr. Glen Reed, Manager Nuclear Power Division Point Beach Nuclear Plant Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 43201 351247