Responds to Re Status of NRC Review of Plant Fire Protection Program.List Re Status of Resolution of Incomplete Items Encl
ML19309F407
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/21/1980
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-11079, TAC-11080, NUDOCS 8004290428
Download: ML19309F407 (2)


Text

VQ0 YE SQY 2 y o

Wisconsin Elecinc ecara couvisr 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE. WI 53201 April 21, 1980 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.

S.

NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 Attention:

Mr. A.

Schwencer, Chief Operating Reactors Branch 1 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 FIRE PROTECTION MODIFICATIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Your letter of March 5, 1980, which we received on March 24, 1980, discussed the status of your review of the Point Beach Nuclear Plant fire protection program.

As you know, the review of the Point Beach fire protection program has been extended beyond the period of time initially contemplated.

We have enclosed as Attachment 1 to this letter a revision to the listing of those items for which Staff review is incomplete and those items for which we are to provide additional information.

This revised list includes the dates by which we expect to submit additional information as we proceed with our design and procurement effort. to your March 5, 1980, letter stated, "it has not been shown that the detectors used at Point Beach will have adequate sensitivity to the products of combustion for the combustibles in the areas where installed".

We understand that manufacturers can new furnish certification regarding the sensitivity of their detectors to specific combustibles.

We are presently soliciting proposals for the Point Beach fire protection system.

We will request the appropriate certification for the detectors from the supplier selected for Point Beach.

We will provide the specific certification for calibration methods upon receipt from the detector manufacturer.

Please advise us if you have any additional questions about our fire protection modifications.

Very truly yours, Q

/

c i

Exe'utive Vice President \\$( k Sol Burstein c

Attachment

ATTACHMENT 1 o.

POINT BEACH UNITS 1 AND 2 RESOLUTION OF INCOMPLETE ITEMS - STATUS Licensee Staff Evaluation Response Due 3.1.2 Smoke Exhaust Incomplete None 3.1.4 Fixed Water Suppression System Information 6/1/80 l

3.1.5 Water Damage Protection Information 7/1/80 3.1.9 Fire Barriers Information 8/1/80 3.1.12 Fire Detectors Requirement 7/1/80 3.1.14 Cable Separators Information 8/1/80 j

1 3.1.17 Hydrogen Hazard Protection Incomplete None

)

3.1.23 CO2 Hose Reel Nozzles Incomplete None 3.1.24 Diesel Generator Air Intake Structure Information 7/1/80 3.1.25 Vent Duct Penetration l

Seals Incomplete None 3.1.26 Auxiliary Building Cable Tray Penetration Seals Information 8/1/80 l

3.1.27 Containment Building Fire Stops Information 8/1/80 3.1.28 Service Building Penetration Seals Information 8/1/80 3.1.29 Cable Tray Penetration Seal Qualification Information 8/1/80 3.1.32 Fire Hydrant Inspections Information 6/1/80 3.1 33 Control Room Light Fixtures Information 8/1/80 i