LER 79-011/03L-0 on 790419:core Spray Pump NZO1A in Sys 1 Failed to Start Upon Initiation Signal.Caused by Fuse Failure.Fuse Replaced & Pump Test Successfully Completed
ML19289E720
Person / Time
Site: Oyster Creek
Issue date: 05/17/1979
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19289E718 List:
References
LER-79-011-03L, LER-79-11-3L, NUDOCS 7905290025
Download: ML19289E720 (3)


Text

LICENSEE EVENT REPORT

oNietoi ritock: J.J j,, l l lQ intEasE en:NT on TYPE ALL nEotilRED INFOnMATION) l"'

1 8 9 N l LICENSE J l 0ElCOO C( l P l 1 lhl 0l 0l -l 0ltlCENSE 14 15 0l O! 010l -l 0 Ol@l 4 l 1LICENSE NUMI' lit /5 /6 1l1l1lhl TYPE JU l

b i L A I SM GON'T o i "5I,,'" l L l@l 0 l 5 l o 10 lo 12 11 19l@l01411l917191@l015 Il 7l 7l Al@ 1$ NO 8 60 G8 DOCA E T NUMUE st ul 69 EVf NT DATE 14 REPOf tT DAT E EVENT DESC6tirilON ANL) PitOll ABLE CONSEoUENCEs h lo laI l On April 19, 1979, while performina the core sprav operability test. I 1 o I3 l l core spray pump NZOl A in System 1 failed to start upon an initiation I o 4 I signal. A fuse failure created an opening in the closing control cir- I lo Isl I cult of the breaker for the pump motor. The fusible link did not fall l

[ O is l I at the center, Indicating an overcurrent situation, but did fail at one i O 7 1 of the ends, indicating current fatigue in a localized area. The backup l l0 a pump and all components in System 2 were available for service if needed. I 1 8 9 80 SYSTEY C AUSE CAUSE COVP. VALVE CCDE CODE SLRCODE COVPONENT CODE SU9 CODE SU8 CODE lTITl lSIF @ lE @ Q @ lC Kl T l B l R l K l@ l A l@ J @

8 9 to 11 12 13 IF 19 20

,_ SE O'.!E NT I A L OCCUR AF *;CE REFORT P E VISION LE A ko EVENT YE AR nE' ORT NO. CODE TYPE NO.

@ ,M,".g,', 17 9I l-l Ol1111 1/l 1013 I LI l-l 10]

2'  :. :3 24 :s 21 2n  :) 3o as n T E / 1 ON PL A* T T 01 HOUHS S B ITT s i 1 L e, $t PLI U NLFACTUnF,9 lAl@lAl@

13 t-1 ,t!

Z l@ l Zl@

.lf.

l 0101 Ol OJ

'l / 40 l Yl@

41 W@ lXl@ IS l1 47 43 de 5161@

4r CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i O l The cause of the occurrence was a failed fuse. The fuse was reolaced l I i 11 Il and the pumo test was successfully completed. The failed fuse will be i

, , l sent out to be analyzed. The results of the analysis will be factored [

, 3 into the P.M. program. All circuit breaker control fuses will be re- l

, 4  ; placed during the next refueling outage.  ;

8 9 80

.TA 5 *.POAE R OTHER STATUS iSCO I DISCOVERY DESCRIPTION

& (_Ej @ lo 19 19 l @ l NA I l_Lj@l Surveillance Test l

' i2 n 44 45 4s 8o

' aC Tivi T v cOTTENT HEMMED OFDEMEE LOC Af TON Or HR E ASE @

/

> r.

ft 9 LzJ @ L2 10 J@l AYOUNT NA OF ACTIVITY 44 l

45

@l NA 11 80 Fl s t'.t p*;Ni I f N POUltl Ni s9M at TYPI lit sr f ti" TION i i [0 l 0 l 0_j@[Z_.j@l NA __ m AW1 @M M l

' ' P,n.oNo,',',N,u', fin "

l$ % $ulNnb "

D N,...... ,, m .,,P,,0 FTl .101010 9 l@!

,, 22 NA 8e l

3 (,_Zj@l 1T vPtff/. OFetseniPrins

08. DA*.* AGE T O F ACILI TY @

NA 7905290b26'l l

. , in 8n

" " " U" "

2 o issu[S"[!>'cSCniPfioN @

l,,3](44)l NA

('} } [d i . llIIIIIIllllt2 8 9 to 6M 69 80 T.

Naur or ens rans n Donald A. Ross pnnyg 201-455-8478 {

n Jersey Centmi Power & Ught Company Madison Avenue at Punch Bowl Road

^4 l[F:$f4" {

Momstown, New Jersey 07960 (201)455-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licensee Event Report Reportable Occurrence No. 50-219/79-/IV3L-0 Report Date May 17, 1979 Occurrence Date April 19, 1979 Identification of Occurrence Core spray pump NZOlA failed to start during a routine pump operability test.

This event is considered to be a reportable cocurrence as defined in the Technical Speci fi cations, paragraph 6.9.2.b.2.

Conditions Prior to Occurrence The plant was operating at steady state power.

Plant parameters at the time of the occurrence were:

Powe r: Generator, 670 MWe Reactor, 1912.1 Mwt Flow: Recirculating, 14.9 x 104 gpm Feedwater, 7.146 x 106 lb/hr Stack Gas: 3.66 x 104 uti/sec Description of Occurrence On Thursday, April 19, 1979, at approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, while performing the Core Spray Pump Operability Test, core spray pump NZ01A in System I failed to start upon an initiation signal.

A fuse failure created an opening in the control closing circuit of the breaker for the pump motor.

The fusible link did not f all at the center indicating an overcurrent situ-ation, but did fail at one of the ends, Indicating current fatigue in a localized area.

.2045 163 Jersey Centra' Power & Lignt Company is a Member c' the General Pubhc Ut+ ties System

Reportable Occurrence No. 50-219/79-11/3L-0 Page 2 May 17, 1979 Analysis of Occurrence The safety significance of this event is considered to be minimal since there are two independent core spray systems, each capable of providing adequate core cooling. Each system is provided with two full capacity pumps and two full capacity booster pumps. If one pump falls to function, the other pump is placed into service automatically.

At the time of this occurrence, the backup pump (NZOIC) was available for service in System i as well as all components in System II.

Corrective Action The failed fuse was replaced, and the Core Spray Pump Operability Test for pump NZOI A was performed successfully. The failed fuse will be sent out to be analyzed. The results of the analysis will be factored into the preven-t t ve maintenance program. Additionally, all circuit breaker control fuses on engineered safeguard systems will be replaced during the next re fuel ing outage.

Failure Data item: One time, Class K-5 Fuse Manufacturer: Shawmut Rated: 15 amps 250 Vac or less

<045 16e