Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation ML20115G2011996-07-17017 July 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20113A8521996-06-19019 June 1996 Application for Amend to License DPR-16,Tech Spec Change Request Change Request 242,Rev 1 Re Implementation of 10CFR50,App J,Option B ML20111A3701996-05-0707 May 1996 TS Change Request 247 to License DPR-16,adopting Provisions of STS NUREG-1433,Rev 1,dtd 950407 Which Clarify SR Applicability & Allow Max Period of 24 H to Complete SR Upon Discovery That Surveillance Missed ML20107E7601996-04-15015 April 1996 Application for Amend to License DPR-16,revising Spec 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7621996-03-28028 March 1996 Application for Amend to License DPR-16,modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J5991996-03-25025 March 1996 Application for Amend to License DPR-16,deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J8981996-02-23023 February 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20100H9331996-02-22022 February 1996 Application for Amend to License DPR-16,deleting EDG Insp Requirement & Mod of Spec Re AOT ML20095C0921995-12-0505 December 1995 Application for Amend to License DPR-16,consisting of Change Request 231 Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20094D1341995-10-26026 October 1995 TS Change Request 229,modifying License Condition 2.C.(5) to Eliminate Process Associated W/Obtaining Separate NRC Approvals for Reviewing Insp Results & Obtaining Restart Authorization Prior to End of Each Refueling Outage ML20086A7051995-06-26026 June 1995 Application for Amend to License DPR-16.Amend Would Eliminate Requirement to Perform Reactor Shutdown & Drywell Solely for Purpose of Inspecting Snubbers in Svc for Only 12 Months ML20078M1381994-11-25025 November 1994 Application for Amend to License DPR-16,consisting of TS Change Request 222,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9341994-09-26026 September 1994 LAR 223 to License DPR-16,revising License Condition 2.C.(6) Re Long Range Planning Program ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20072L4701994-08-19019 August 1994 TS Change Request 220 to License DPR-16,updating & Clarifying SRs for Control Rod Exercising & Standby Liquid Control Pump Operability Testing to Be Consistent W/Generic Ltr 93-05 ML20070E3381994-07-0808 July 1994 Application for Amend to License DPR-16,revising TS to Provide Improved Protection to Safety Related Electrical Equipment from Loss of Capability in Event of Sustained Degraded Voltage Condition on Electrical Grid ML20078A7691994-06-24024 June 1994 TS Change Request 221 to License DPR-16,deleting TS 2.3.0 & Associated Bases,Reflecting Removal of Recirculation Flow Scram ML20069Q6751994-06-22022 June 1994 Application for Amend to License DPR-16,consisting of TS Change Request 217,rev 1,clarifying Requirements for Demonstrating Shutdown Margins ML20069M8031994-06-15015 June 1994 TS Change Request 216,revising Setpoints of TS 2.3.D, Reactor High Pressure,Relief Valve Initiation, by Increasing Setpoint Value by 15 Psig for Each Electromatic Relief Valve in ADS ML20070R5101994-05-12012 May 1994 TS Change Request 218 to License DPR-16,revising TS Sections 3.1 & 4.1 for Protective Instrumentation,Associated Bases & Tables to Increase Surveillance Test Intervals & Add Allowable out-of-svc Times ML20029E0431994-05-0606 May 1994 TS Change Request 217 to License DPR-16,clarifying Requirements for Demonstrating Shutdown Margin ML20065M9971994-04-19019 April 1994 TS Change Request 213 to License DPR-16,updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable During Pressure Testing 1999-07-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20216H4981999-09-24024 September 1999 Amend 209 to License PDR-16,revising Surveillance Frequency for Verifying Operability of Motor Operated Isolation Valves & Condensate Makeup Valves in IC TS 4.8.A.1 & Bases Page from Once Per Month to Once Per Three Months ML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20195C8051999-06-0202 June 1999 Amend 208 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Systems & Related Bases Pages to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20206U9451999-05-18018 May 1999 Amend 207 to License DPR-16,deleting Organizational Chart & Related Refs from App B Environ TS & Revises Appearance of Format of Environ TS ML20206P0731999-05-12012 May 1999 Amend 205 to License DPR-16,removing Restriction on Sale or Lease of Property within Exclusion Area & Replaces Restriction with Requirement to Retain Complete Authority to Determine & Maintain Sufficient Control of Activities ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20205A7241999-03-17017 March 1999 Amend 204 to License DPR-16,revising TS 3.4.A.10.e & 3.5.a.2.e to Incorporate Condensate Storage Tank Level of Greater than 35 Feet ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20196E2571998-11-30030 November 1998 Amend 203 to License DPR-16,modifying Spec 6.2.2(a) to Provide Some Flexibility to Accomodate Unexpected Absense of on-duty Shift Crew Members ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20155G9841998-11-0505 November 1998 Amend 202 to License DPR-16,establishing That Existing Safety Limit Min Critical Power Ratio Contained in TS 2.1.A, Applicable for Next Operating Cycle,(Cycle 17) ML20154M6081998-10-15015 October 1998 Amend 200 to License DPR-16,revising TS 4.5.A.1 Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Will Be Performed During Refueling Outage 18 Rather than Refueling Outage 17 ML20154L3151998-10-14014 October 1998 Amend 199 to License DPR-16,removing Requirements for ADS Function of Emvr to Be Operable During Reactor Vessel Pressure Testing ML20154B4261998-10-0101 October 1998 Amend 198 to License DPR-16,deleting Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves.In Addition, Amend Clarifies Applicability of Action Statement Which Applies to Several Limiting Conditions for Operation ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151U8371998-09-0808 September 1998 Amend 197 to License DPR-16,reducing Scope of Previous Amend Request Dtd 960222.Amend Retains Provision to Delete Requirement That Biennial EDG Insp Be Performed During Shutdown & Permits Skipping Diesel Starting Battery Test ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20237B7291998-08-13013 August 1998 Amend 196 to License DPR-16,deleting Table 3.5.2 Which Lists Automatic Primary Ci Valves & Clarifying Applicability of Action Statement Which Applies to Several Limiting Conditions for Operation in Section 3.5 ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236K7221998-07-0707 July 1998 Errata to Pp 2-3.7 of Amend 195 to License DPR-16.Footnote Correction 871130 Was Omitted ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248L1551998-06-0404 June 1998 Amend 195 to License DPR-16,clarifies Sections of TSs Which Have Demonstrated to Be Unclear or Conflicting as Result of Licensee Review ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197B0081998-02-11011 February 1998 Errata to Amend 194 to License DPR-16.Date of Issuance 980211 Was Inadvertently Omitted from Page 2 of Amend. License Amend Number 194 Was Inadvertently Omitted from Page 3 of Revised Operating License,In Paragraph 2.C.(2) ML20198Q4251998-01-14014 January 1998 Amend 194 to License DPR-16,revising Plant Operating License & TS to Reflect Registered Trade Name of Gpu Energy from Gpu Nuclear Corp to Gpu Nuclear,Inc ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20202B7401997-11-26026 November 1997 Amend 193 to License DPR-16,extending Instrumentation Surveillances for Condenser Low Vacuum,High Temp Main Steamline Tunnel,Recirculation Flow & Reactor Coolant Leakage ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20140H7641997-05-0808 May 1997 Amend 191 to License DPR-16,updating TSs to Reflect Implementation of Revised 10CFR20, Stds for Protection Against Radiation ML20137X0981997-04-14014 April 1997 Amend 190 to License DPR-16,modifying TS by Replacing Description of Existing Permissive Interlock from AC Voltage to Core Spray Booster Pump Differential Pressure Permissive Greater than 21.2 Psid ML20137D5861997-03-24024 March 1997 Amend 189 to License DPR-16 Changing TSs to Delete Surveillance 4.7.B.4.d & Adds Clarifying Phrase While on a Float Charge... Where Appropriate ML20136D5911997-03-0606 March 1997 Amend 188 to License DPR-16,updating pressure-temperature Limits Up to 22,27 & 32 Effective Full Power Years ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117G8051996-09-0303 September 1996 Amend 186 to License DPR-16,changing TS to Allow Implementation of 10CFR50,App J,Option B ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation 1999-09-24
[Table view] |
Text
TER-C5506-58 E
Jersey Central Power & Ugnt Company 7 b, f f (J)--
Mar *s:0wn tec Jesev 0 hs
.(l, Ma. son Avenue a::en.; :aa:
201 539-6111 March 4 1981 The Honorable Henry Von Spreckelsen Mayor of I,acey Township P. O. Box 475 Forked River, New Jersey 08731
Dear Mayor Von Spreckelsen:
Enclosed herewith is one copy of Technical Specification Change Request No. 92 for the Oyster Creek Nuclear Generating Station Operating License.
This document was filed with the United States Nuclear Regulatory Ccmmission on March 4, 1981.
Very truly yours, All.
Ivan R. Fin, ek sr.
Vice Presid.t la Enclosure 8I O3 I I o 7CT JE'$e( C49fr81 DoWrer S UQ'If Co*C8**y is a f.tember 3 The Ge*!egl P.tD3aC 1.htishe$ Sp5:em nklin Research Center A DMason of *he Fraruthn msutute
TER-C5506-58 a.
.g...._
.,...........-......4..
J.
s.
..r..
.4..-i'.
g s J.. r e...
.e t.
3. b.c
.g s...,3. 7 4.,.
P..y.3.=...e.
"..r.e.*,.
.e..p.e.
e.
f.*
4..p J...-
.r s.
- g....
4.
m.e r.o * *..
.:.e.
. 4.
.. e..
4..
. o..
.s 4.
.e
....s.
...,. 4 E
. c.
. A..a.,. a
- s. w..
,,f.4.,,..%..._.
4 e,. 6.,.,.a.
"e C..
m
's ~~..* i 7
.ie 1%..
..a ~ * = *.....
e.
.g.
.4..
w., e.c.
.. a.
gi.*. Ci".~.
- .*.*. " d '.'.*. * *.r.
~s. l
~~#.*... 0.*,*y'"*.*p*4.".*.=
s
.a..
.,a.4 0.,,s.1
~
."n..
4..
.e. 4...C.,.*..
... e. 4 ~ ~. e.
a
.... e.g, e. e.
, 4.q 3.,.
e.
i.
u.-
~
4
...3 e.. c...4 e.. 4 em v 4 3 4,. C. *.*. ~~.* V C.*.
. '. ". " ".V."'.V e*.
..s..
...'.a..b.e'.'.
'.C*..h*'.4".".'
. e.. * "
- 8. " *.
"7
.1
.%,.. r..e 4 m. ~ ;.o.
,s g..
- a.., e. e N.. 9.
4.,..
.N e..
a.4
.s
~
.>..n.
, a..a 4 4
e.w.
.4._C".*.#.."*. "*..>'."e
..g
... **.~~
- 4. y.
,c,
- a. si.
- w. 4.O r.*,.
,.a.a
.a. a. 4 4. r.~.
- 41..s. 4... o d "e.
.,. 4 4. c.,.,...
..v s;.
- .8.'."'..,*"'
~ ~ '. ' '. '.
.c, e'. e * *--.,,
'.'*.e %^. *. ' d..e..d...*.'
4
. e.e en.
. w e.
- .r.
- -' Car :s :'. t' cet::, presently there are no technical specification requirements.
~~.' v c..
.'. 3.r *. velv,.-
. a.,, =. rd.".,-
s a.oc
. ~..._.,'..s..,.""..."C.-'.~..~...'.."..-n..'.~.r...
..,.,, 4 e. 4 4
...4,.r.....
..s...
,.. ~...
.m.,,. ~,... m. y e.,
',r 1 a-,,.,
e,.
. ~...
..w
- a. ex 4.e..
...a. 4
- 4. 3. u.
.,.a.
.,,,,.,,...y.46..,.
e 4
,.4...r...-**.*..*+.c*....'~...."*.*.=...'ve....
..nd.
'-"i..
.~.........
..4
..a.... r
e...,-
.~..
- 4.. 4 a...4.,.,
,.e s,.,..
y.....,,,
.....,....a.
...4._,..
..m B-5
/bsFrankhn Research Center n===oaertw. r,.no m an.
8
-e
- t w
O W
C 81 W
C en C
=
==
sa e es e==
C.
v C
C e.
n w
a w
e E
9 ed Se E#
C en O e.e o.e e e.e E.2 3 e.D EA
M M
M M
M M
e C
n.
C e t
= to es C n.
ce e oe-LE= Gm
=
3 Q
- e. i.J Q >=
.C m.
a.
O O
==
ee k M.= )
= W =m J
O==
s== a
- 7. g g.3 w e gI ce
=e M
N N
N es N
N W
e e L &l m
m.
E ae l K
ce W-mi
== 6 % *. me' 3
= C C t= ars
=>l w
a
?
w w
U M
C w
e.
w 3
7.
g M a(
M M
M M
M M
.C.
Sh
> = 'i 4
3
>= 1 e,
m m
e a== _e n.
.3 U
C v
w"J e
o e
a.a.
w w
w m
e ad.3 eS M M M
M M
M M
M M
f e
es W
4 & e P.
O C no M
%3 e
=
Jae L s'
m s.
as c
=
m A
e am O=
w a
a
.o e
w g
=.
=
w w
=
w w
ad
, as y e e
o== m 5
M M M
M M
M M
M M
D.a s=
m, a 2 u4 m
e e
W
3 c
=
=
She 3
M 1
.5
. = '
u
.e no e
d
.a m
=
.c s
w
=
a O
e as
.e e
==
e, e
=
=
W n
e a
sc=
Ce
~
m c.
.c a
n c.
4 4
Mi 4
4 4
Wl 4
Wl Al Wl 4
4 a.
= e
TER-C5506-58 8
4.i 8:
. a
-5 0
.E
.E - T -
.u E
8*:
..Y4
.3E A ITL 31
. P. [.
g 7
- I
.92*
g g :t :I..=
Ek26&C
-a I
.t
-1 e
.211.
~
g
- i. t. s. t.!.
e
- - = = = =
=
=
I tilt-1 E
s I. !. ;.
E
t d-t :
=
=
=
- fy,:
I E
a!
e n-
.e O
i
.gL 0
3:2g 3
y
= g.m.
=
=
- 2 ;.
g
,[
U E
25
~
2 -
,.
3 a
a
- 1
=
3 gE g
- a. -
2 1!
-.i Y
s
-.,, k 4
=
=.
=
=;
3:
~
=
3 g &.
5a "2
EE 3 3,
3.1-17e TABIT 3.1.1 (GWD)
W
- T e
The Interlock is not required dur1pg the start-up test program and demonstration of plant electrical h
output but shall be provided following these actions.
85
- j. Not sequired below 40% of turbine rated steam flow.
A gg k.
All four (4) drywell pressure Instrument channels may be made inoperable during the integrated primary M
containment leakage rate test (See Specification 4.5), provided that priwary containment integrity is not required and that no work is performed on the reactor or its connected s ptens which could result in g
lowering the reactor water level to less than 4'8" above the top of the active fuel.
'4 1.
Bypassed in IRH Ranges 8, 9, li 10 m.
There is one time delay relay associated with each of two pumps.
n.
One time delay relay per pump minst be operable.
o.
There are two time delay relays associateil with each of two pumps.
tn 4
p.
Two time delay relays per pump must be operable, q.
Manual Initiation of affected component can be accomplished after the automatic load sequencing is compt et eil.
Time delay starts after closing of containmen' spray i=>mp circuit breaker.
r.
s.
These functions not required to be operable with the reactor temperature less then 212'F and the vessel head removed or vented.
t.
These functions may be Inoperable or bypassed when correspondlag portions in the same tore spray system logic train are Inoperable per Specification 3.4.A.
u.
These funct ions are not required to be operable when primary containment integrity is not required to be maintained.
v.
1hese Snct ions not required to be uperable when the ADS is not respilted to be oreerable, w.
These functions must he operable only when irradiated fuel is in the fuel l col or reactor vessel b
and secondary containment integrit y is r equi red per spec i ficat ion 3.5.B.
o y.
The number of operable channels may be re lated to 2 per Specification 1.9 li and 17 2.
1he bypass function to permit scram reset in the shutdown or re(nel mode with control rod block muest be operahlo in this smide.
Amendment No. 41
R M5 TABl.E 4.3.1
>m p 7g g
HINi>RM CillCK, CAlgRr:10N AND TTST FRI: QUI'NCY FOR PH(Tft:CTIVil INSTRIN!:NTATION s 5i Instrument Channel gie33 Ca. librate Test Remarks J Applies to Test and CallbrationJ_
pp
,. m 8k 1.
liigh Henctor Pressure NA I/3 mo.
Note l By appilcation of test pressure
[n?r 2.
liigh Drywell Pressure R$
(scram)
NA l/3 mo.
Note !
4 3.
Inw Reactor Water I.evel I/d 1/3 umn.
Note I 4.
Inw-inw Water f.evel I/d 1/3 mo.
Note i 5.
liigh Water I.evel in Scram Discharge' Volume (Scram) NA I/3 mo.
Note i By varying level in switch columns 6.
Inw-inw-law Wat er I.evel NA I/3 mo.
Note 1 By application of test pressure 7.
Iligh Flow in Main Steamline I/d I/3 aus.
Note i 8.
Inw Pressure in Rein NA l/3 mo.
Note i Steamline 9.
Iligh tirywell Pressure I/d Note l (Core Cooling) 10.
Main Steam isolation NA NA I/3 mo.
By exercising valve Valve (Scram)
II.
APRM l.evel NA I/ 3tl NA output adjitstment using operational type heat balance during power operation NIHl! 1: Initially once/mo., thereafter according to Fig. 4.1.1, with an interval not less than one month 3
nor more than three nuint hs.
L NOTl! 2: At least daily aluring reactor power operation, the reactor neut ron flux peaking fhctor shall be estimated f,
h anal t he I' low-s eferenced APHH scram and ruil block set t ings shall be o ljust ed, if necessary, as specified ui in Sect ion 2.3, Specificat ions (1) (a) and (2) (a).
S ve
4.1-6a
/
- rE e5
$,, Q" Instrument Channel check Calibrate Test Remarks (Applies to Test 4 Calibration)
!@=
19.
Manual Scram Buttons NA NA l/3 sus
=
c3 20 liigh Temperature Main NA Each refuel-Each refuel-Ilsing heat source box i
Steamline Tunnel ing outage Ing outage 21.
SRH Ilsing built-in calibration equipment 22.
Isolation Contlenser liigh NA I/3 uni 1/3 mo By application of test pressure Flow P (Steam and Water) 23.
Turbine Trip Scram NA Every g
e 3 months wo 21 Generator looil Reject ton HA Every Every Scram 3 months
,1 uninths 25.
Recirculation loop Flow NA Each Refuel-NA Py application of test pressure ing Outage 26.
Inw Reactor Pressure NA Every Every By application of test pressure Core Spray Valve 3 months 3 months Permissive 27.
Sc ram lis, charge Volume (Ro.1 Block) a) Water level high NA Each Refuel-Every 3 Dy varying level in switch column.
ing Outage aminths 61 N
li) Scram t rip bypass NA NA Each refuel-f ing outage y
o os t
- Calilirate lirior to startup anil poemal shutdown and thereafter check I/s and test 1/wk until no longer requirett.
g
TER-C5506-58
,...4.........,......,
4.
.44
..p.
r.
r
.....#.4.,.
4, 2
...,E,.>..n......,...a.... c. C. r4.,., r.,, 4.......,,C,.
.. s..
_.4**
g.
.s
.4.
,s
.. p
.si
.r.
c.
11.s.
- a. L 4
,,s.
....,....c...
- 4... s.,
.r:....
~....
r.
.w
....s...s.,..
- 6. n....... r... t s.
~. e.
i 4. i 1.,..a 4.f....... r).
=.
,s r.,,,.,,
,c..
. s *...' i s.h r.."
...r'....,. r.".- =..C. t. e..-
- .*'.**.*Tiu,..Ca.*...*i'..'.*.*..*
Ort
.I...
u.r.,,
.r.j.,.
4.F
..pp-g6p 4.,3
.t]
.., g.a
..,,3 w.
u. a.
...w
.........J..,ge.c
.s
.....,c,..
.t.,
7,., s... g. 4...
.......4..4.,..
c...
r.........,a 4v
.g..,..
4 4...
..---.9 C...
1 I.4
.,4...
.4?9
..4..
..-r--
G.
C"
+ - -
,.g..,.."-...... g g.... t
.....,..,,, g.., -.. ?.. a. L.z 4..
n*
rv ---
4......
...A
.7 4..
.d..
4y..V 1.,.
.r.
- s. 4 s. 4.
. 4s..J,...
- :, C...... T....
.v... t
...; C e.V L,.
4 s...
... g
.44....
L,.
,....6.
g.
=.>>.....44.....
\\,,. *... g,;p 4. 5 s.. - yg. g s.1 y e..,,
19 5.
V,,4.r.4,,..
.u
- 9. g.
.nOe.. T q.
.4. y5,.xC 4
,;1U....
m3.a.r
- a....
c.
.r.
p...
. s..aA. se etc.
- 4. e. r f 2.,. -
- e. wy a
....... r.a.
4.......
u.
A.
n.4
- .c:Or.s.tratin;; the scrs.iisenc,r;;e volm.e dr-in c ' vent vc,1ves e..
c.e c.. 4 n..... c
,s y
.~...n..
. s..
41u
.e.
u
..........~
a
+
.....m.
...s,.4.c. 4.
...,.,... a mc d a s....~
4
.. ~..
.. ~ -..~
The drain and vent valves close within 60 seconds after receipt 4.
of a signal for control rods to scram, and
'ihe scram signal can be reset anci the drain and vent va.1ves epen when the scram discharge volume trip is bypassed.
- u. h,.. v v g s.. y.-.
.-1. 0 s c "..*.~......' '.'. s. *.. ~ f ~ r '. c.'* *. u~'. e '
s 6 1 4s...iVt
.r.
(.a.. 4 r1.. <.,. 2. n. ) r....e3..T t'.,
...., i.
%.... r ft.. 4.Ji y 14.
4..
10..
y....
. O r '. ",. s. *. *. #.V it - '. ' '. '.4
.# *.. - ' C.- 8..
- t.- t '..". e **. r e C *. U l * *. *..~ s~. t.-
.....6 y,
g4.....,4, j.g
.,w,43.
).g.t.,,
g.4 1 (3.,gpg.a.. g.,.
....,4..e..*
..,... c.....
u.
4
...)3..,.
.t-
.,u.., C,r..l e F"Xe.,
,..,....... e.... r.1 "3...
.c.J 1.,..
...T 4...
sa.
r.
.... C.e.
s,. a, r..,.. E..
- 4..,.... c.
gC. 1.i
.,. 1..t
.r.i T..t.ir. %.
o
.p
.r p.,
..g
. n..c,.
.4..
a...
.., y g i s... i. y.,p..,
..... g4+e g w.A s.
..*}...,-1,s.
... 4r.
s.u,....,,.
a.
>.4-*
........ 4...........,.
6..,
...... tr..
..v....
..... C.,... r.., 4 r.
..,U.,.
... s......4...n 1
,.d c... t, 4... 1.,.
.s.-
. r
.s.. g
,C,.P i.,
6
............. 4 3 1 S. r.,L.
.1 Q1.,
E.,.c...f.,,.
...a4 4
...s.
e..
4...o.. t.
a.C..
Wi.,
tp.
.....L.,w
. t
- 1. L,.,. -.
. - C.',.4 4...
a eda1. g-*e.w.
9
......,----*-I...
r..
2
- +
r-*a*
...s' U1..a.
V L, U,.
.f
. c =..s.,
...c..
.. r.r.rt r ti... e.
.. E t. u Re..
..., t
- t.. t...,
.w..
.f
.e.....
pv.37.i.
4 e
r c. u.. g 4v..... s-
......... s p,. g
.e...:
. s
.)
..g
p.. 4.... g..... y 6.S... *
... T T.
.r 1.?.
..a....;,....
=. =..
V.iG
../... 1..,
4,
..*4
..... rC. 4 4
....Y...,.
4.et 33 L...,s.....
.s
.....,,,..e
.4..
,...,4.e..,
..... i. y.
s... w. S..
4.
- i..a r.
..e
...,s..... g..,.,....
.~r.,,'.'.'.. c.'. u.' c '...-
. s %...
t..~
., p.,
~. g. o...r
.v
..s.
..4 4..
c..
,..4.
4
.m...
.w.....
f"h B-ll N Frankhn Research Center A DMane of The Franse ensawee mm-mmm-..mi
TER-C5506-58 A..*,3 e
........s <.....
A.
s g.
.. t.
..,.....<.,..i.tr,.
- r. i. r..,
.-p4 f.o. i..,.. e. 4....
4.-
3
.e. r.e.....n...
k.,,..rU1.
+,e...p.
.e..........-s
..s.<.
4.;..e..
?.4
...,}y
.P
,..<.a.r..,.,..p.4.*
g.&..
.....p
.?.
4.-
...e,
. gg.g.=.
.. ~....
...,r..
- .".4-co.. *.*. ien.... z..
- ...ar. v.-*. a.r....' *.t/ - d..'. '4.,r r e.- a...
..y...,,.r.........r,.
~.
.. <.........s...
..e > t >.. a.,..a..
.4
.....t..
.~... ~n
..,r
..i,.....7.... t r
.. s.
4 B-12 b!,' Franklin Research Center A Dmsean af The Fransden mantwie
TER-C5506-58 g
3.2-5 y
,g 4
b VN r
1l7 1F.
the specified limits, provide the require ' protection. In the analytical treatment of the transients milliseconos are f
allowed between a neutros sensor reachf6 U he scram point and
? 4 d
the start of motion of the control rods J.is is adeounte and conservative when F parc.a to tac. typical time delay of N ut 210 mil.
seconds estimated from scram test results. 4pproximately the fr et millisecc:
fi'tf-these time intewals result from the sensor and circuit delays; chen the pil of a scram solenoid de-energizes. Approximately 120 milliseconds later, the control rod motion la estimatjE o actually begin. However, 200 milliseconds is conservatiyely.a-t q
assumed for chi rise interval in the transienpalyses and this is _also included in t.
allowable scram m*~8pecitiec limits provice sufncient scram capaollity to N-insertion times of accommodate failure to scram of any one operable rod. This specification of,3-2-3. failure is in addition to any inoperable rods that exist in the j core, provided that those inoperable rods met the core reactivity J ' Specification 3.2.A, Control rods (8) which cannot be moved with control rod drive pressure are clearly indicative of an abnormal operating condition on the affected rods and are, therefore, considered to be inoperable, Inoperable rods are valved out of service to fix their position in the core and assure predictable behavior. If the rod is fully inserted and then valved out of servite, it is in a safe position of maximum contribution to shutdown reactivity. If ic is valved out of service in a non-fully inserted position, that pcsition is required to be consistent with the shutdown reactivity
' limitation stated in Specification 3.2.A. which assures the core can be shutdown-at all times with control rods.
Although there are many possible patterns of inoperable control rods which would meet this specification, the operator will be p'rovided with,only a limited. number of predetermined patterns which allow him to continue operation with inoperable rods. The availability of allowable patterns to the operator assures that information for determining comp'11ance with the specification is immediately available to him at the time a control rod becomes inoperable and does not require relicnce on calculations at that time before compliance can'be determined.
The allowable inoperable rod patterns will be determined using infctmation obtained in the startup test program suppletented by calculations. During init'ial startup, the reactivity ccndition of the as-built core will be determined. Also, sub-critical patterns of widely separattd withdrawn control rods will be cbserved in the control rod sequences being used. The observa-tions, together with calculated strengths of the strongest control rods in these patterns wi"11 compriso.a set of allow-able separations of malfunctioning rods. Daring the fuel cycle, similar observatiora made during any cold shutdown esn be used to update and/or increase the allowable patterns.
The number of rods pernitted to be valved out of servie'c'could nklin Research Center A Dneman of The Frankhn insatuer