ML20151U837

From kanterella
Jump to navigation Jump to search
Amend 197 to License DPR-16,reducing Scope of Previous Amend Request Dtd 960222.Amend Retains Provision to Delete Requirement That Biennial EDG Insp Be Performed During Shutdown & Permits Skipping Diesel Starting Battery Test
ML20151U837
Person / Time
Site: Oyster Creek
Issue date: 09/08/1998
From: Thomas C
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20151U839 List:
References
FACA, NUDOCS 9809110195
Download: ML20151U837 (8)


Text

.

pn ;*h 4

UNITED STATES

[

j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 20006 4 001 49.....,o i

GPU NUCLEAR. INC.

ano JERSEY CENTRAL POWER & LIGHT COMPANY DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.197 License No. DPR-16 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment filed by GPU Nuclear, Inc., et al., (the licensee),

dated June 29,1998, and supplemented July 27,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

l 9809110195 980908 PDR ADOCK 05000219 P

PDR t

4

' 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-16 is hereby amended to read as follows:

(2)

Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.197

, are hereby incorporated in the license. _GPU Nuclear, Inc. chall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance.

FOR 'f HE NUCLEAR REGULATORY COMMISSION k oAu) Q.. f~ &J.gg Cecil O. Thomas, Director Project Directorate 1-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: September 8, 1998 i'

{

ATTACHMENT TO LICENSE AMENDMENT NO.197 FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace the following pages of the Appendix A Technical Specifications, with the attached pages as indicated. The revised pages are identified by amendment number and contain verticallines indicating the areas of change.

Remove Insert 3.7-2 3.7-2 4.7-1 4.7-1 4.7-2 4.7-2 4.7-3 4.7-3 4.7-4 4.7-4 l

I L

1 f

1 I

not to exceed 7 days in any 30 day period if a startup transformer is out of service. None of the engineered safety feature equipm:nt fed by the remaining transformer may be out of service.

2.

The reactor may remain in operation for a period not to exceed 7 days if 125 VDC Motor Control Center DC-2 is out of service, provided the requirements of Specification 3.8 are met.

C.

Standby Diesel Generators 1.

The reactor shall not be made critical unless both diesel generators are operable and capable of feeding their designated 4160 volt buses.

2.

If one diesel generator becomes inoperable during power operation, repairs shall be initiated immediately and the other diesel shall be operated at least one hour every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at greater than 80% rated load until repairs are completed. The reactor may l

remain in operation for a period not to exceed 7 days in any 30-day period if a diesel generator is out of service. During the repair period none of the engineered safety features normally fed by the operational diesel generator may be out of service or the reactor shall be placed in the cold shutdown condition. If a diesel is made inoperable for biennial inspection, the testing and engineered safety feature requirements described above must be met.

3.

If both diesel generators become inoperable during power operation, the reactor shall be placed in the cold shutdown condition.

4.

For the diesel generators to be considered operable:

A)

There shall be a minimum of 14,000 gallons of diesel fuel in the standby diesel generator fuel tank, OR B)

To facilitate inspection, repair, or replacement of equipment which would require full or partial draining of the standby diesel generator fuel tank, the following conditions must be met:

1)

There'shall be a minimum of 14,000 gallons of fuel oil contained in temporary tanker trucks, connected and aligned to the diesel generator fill station.

OYSTER CREEK 3.7-2 Amendment No.: ii,55,00, i10,1iSI97

4.7 AUXILIARY ELECTRICAL POWER Anolicability: Applies to surveillance requirements of the auxiliary electrical supply.

Obiective:

To verify the availability of the auxiliary electrical supply.

Soecification:

A.

Diesel Generator 1.

Each diesel generator shall be started and loaded to not less than 80% rated load every two weeks.

2.

The two diesel generators shall be automatically actuated and functionally tested during each refueling outage. This shall include testing of the diesel generator load sequence timers listed in Table 3.1.1.

3.

Each diesel generator shall be given a thorough inspection at least once per 24 months.

l 4.

The diesel generators' fuel supply shall be checked following the above tests.

5.

The diesel generators' starting batteries shall be tested and monitored the same as the station batteries, Specification 4.7.B. The battery capacity test need not be performed if the installed batteries were replaced during the previous biennialinspection.

B.

Station Batteries 1.

Weekly surveillance will be performed to verify the following:

The active metallic surface of the plates shall be fully covered with I

a.

electrolyte in all batteries, b.

The designated pilot cell voltage is greater than or equal to 2.09 volts for Station Battery B and 2.0 volts for Station Battery C while the respective battery is on a float charge.

The overall battery voltage is greater than or equal to 125.4 volts for c.

Station Battery B and 120 volts for Station Battery C while the respective battery is on a float charge. (Diesel battery; 112 volts).

d.

The pilot cell specific gravity, corrected to 77' F, is greater than or equal to 1.190.

OYSTER CREEK 4.7-1 Amendment No.: 144,10^ 197 l

l

)

2.

Quarterly Surveiliance will be performed to verify the following:

i The active metallic surface of the plates shall be fully covered with a.

electrolyte in all batteries.

b.

The voltage of each connected cell is greater than or equal to 2.09 volts for Station Battery B and 2.0 volts for Station Battery C while the respective battery is'on a float charge.

The specific gravity, for each tenth cell, is greater than or equal to c.

1.190 when corrected to 77* F. The specific gravity and electrolyte temperature ofevery tenth cell (Diesel; every fourth cell) shall be recorded for surveillance review.

3.

Annual surveillance will be performed to verify the following:

.The active metallic surface of the plates shall be fully covered with a.

electrolyte in all batteries.

b.

The voltage of each connected cell is greater than or equal to 2.09 volts for Station Battery B and 2.0 volts for Station Battery C while

. the respective battery is on a float charge.

The specific gravity for each cell is greater than or equa' to 1.190 c.

when corrected to 77' F. The electrolyte temperature ar.d specific gravity for every cell shall be recorded for surveillance review.

4.

At least once per 12 months, the diesel generator battery capacity shall be demonstrated to be able to supply the d: sign duty loads (diesel start) during a battery service test.

5.

At least once per 24 months during a shutdown, the following tests will be performed to verify battery capacity:

a.

Battery capacity shall be demonstrated to be at least 80% of the manufacturers' rating when subjected to a battery capacity discharge test to be considered operable.

Oyster Creek 4.7-2 Amendment No. 142,109 W

(

i l

b.

Any battery which is demonstrated to have less than 85% of manufacturers ratings during a capacity discharge test shall be replaced during the subsequent refueling outage.

Station battery capacity shall be demonstrated to be able to supply c.

l the design duty cycle loads during a battery service test.

Basis: The biweekly tests of the diesel generators are primarily to check for failures and i

deterioration in the system since last use. He manufacturer has recommended the j

two week test interval, based on experience with many of their engines. One hetor in determining this test interval (besides checking whether or not the engine shuts and runs) is that the lubricating oil should be circulated through the engine approximately every.two weeks. The diesels should be loaded to at least 80% of rated load until engine and generator temperatures have stabilized (about one hour).

L The minimum 80% load will prevent soot formation in the cylinders and injection l

nozzles. Operation up to an equilibrium temperature ensures that there is no over-heat problem. The tests also provide an engine and generator operating history to be compared with subsequent engine generator test data to identify and correct any mechanical or electrical deficiency buore it can result in a system failure.

The test during refueling outages is more comprehensive, including procedures that are most effectively conducted at that time. These include automatic actuation and functional capability tests, to verify that the generators can start and assume load in less than 20 seconds and testing of the diesel generator load sequence timers which provide protection from a possible diesel generator overload during LOCA conditions. Thorough inspections will detect any signs of wear long before failure.

The manufacturer's instructions for battery care and maintenance with regard to the floating charge, the equalizing charge, and the addition of water will be followed.

In addition, written records kill be maintained of the battery performance. Station

- batteries will deteriorate with time, but precipitous failure is unlikely. The station surveillance procedures follow the recommended maintenance and testing practices ofIEEE STD. 450 which have demonstrated, through experience, the ability to provide positive indications of cell deterioration tendencies long before such tendencies cause cell irregularity or improper cell perfonnance.

He battery service test is a special capacity test to demonstrate the capability of the battery to meet the system design requirements. The Oyster Creek design duty cycle loads are detennined by a LOCA subsequent to a loss of AC power. The L

battery performance test is a capacity test on the battery to check it against the l

manufacturer's specified capacity and is used to determine when the battery has arrived at the end ofits life.

Oyster Creek 4.7-3 Amendment No. H2, M9197 i

i IEEE Standard 450-1975 ' recommends battery performance testing once per five i

l years. IEEE Standard 308-1974 recommends battery performance testing once per l

three years. The Oyster Creek Technical Specifications require a performance test j

once per two years. Both IEEE Standards recommend decreasing the surveillance I

interval to annually when battery capacity falls below 85% of rated.

l The diesel generator batteries are challenged every two weeks to perform the 80%

l load test. This effectively performs an'uninstrumented battery service test. The biweekly diesel start, when combined with the annual battery service test, provides an extensive amount of data on battery perfonnance characteristics. This test data negates the need to lower the battery performance test interval from biennial to annually.

The station batteries are required for plant operation, and performing the station battery performance test requires the reactor to be in COLD SHUTDOWN. The i

guidance in IEEE 450-1975 would result in 3 performance tests to reach 85%

service life, followed by 3 performance tests to complete battery life. The guidance in IEEE 308-1974 would result in 5 performance tests to reach 85% service life, followed by 3 performance tests to complete battery life. The Oyster Creek Technical Specifications require 8 performance tests to reach 85% service life, followed by 2 performance tests to complete battery life. The requirement which would result in a reactor shutdown for the sole purpose of performing a battery performance test during the last 15% of battery life cannot be justified to increase battery test performance from 2 to 3 in a 3-year period. Additionally, the increase in battery performance testing during the first 85% of battery service life would result in a greater level of battery reliability by identifying, and causing to be corrected, small anomalies in cell performance thereby reducing battery failure probability.

The diesel batteries shall be tested and monitored in accordance with the requirements of Specification 4.7.B to ensure their viability. If the diesel batteries are replaced with pre-tested batteries during the biennial inspection of the diesels, the battery capacity discharge test need not be performed.

The requirement to replace any battery in the next refueling outage which demonstrates less than 85% of manufacturers capacity during a capacity discharge test provides additional assurance of continued battery operability.

I-OYSTER CREEK 4.7-4 AMENDMENT NO: 142,189 197 i

l I

-_