Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation ML20115G2011996-07-17017 July 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20113A8521996-06-19019 June 1996 Application for Amend to License DPR-16,Tech Spec Change Request Change Request 242,Rev 1 Re Implementation of 10CFR50,App J,Option B ML20111A3701996-05-0707 May 1996 TS Change Request 247 to License DPR-16,adopting Provisions of STS NUREG-1433,Rev 1,dtd 950407 Which Clarify SR Applicability & Allow Max Period of 24 H to Complete SR Upon Discovery That Surveillance Missed ML20107E7601996-04-15015 April 1996 Application for Amend to License DPR-16,revising Spec 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7621996-03-28028 March 1996 Application for Amend to License DPR-16,modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J5991996-03-25025 March 1996 Application for Amend to License DPR-16,deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J8981996-02-23023 February 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20100H9331996-02-22022 February 1996 Application for Amend to License DPR-16,deleting EDG Insp Requirement & Mod of Spec Re AOT ML20095C0921995-12-0505 December 1995 Application for Amend to License DPR-16,consisting of Change Request 231 Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20094D1341995-10-26026 October 1995 TS Change Request 229,modifying License Condition 2.C.(5) to Eliminate Process Associated W/Obtaining Separate NRC Approvals for Reviewing Insp Results & Obtaining Restart Authorization Prior to End of Each Refueling Outage ML20086A7051995-06-26026 June 1995 Application for Amend to License DPR-16.Amend Would Eliminate Requirement to Perform Reactor Shutdown & Drywell Solely for Purpose of Inspecting Snubbers in Svc for Only 12 Months ML20078M1381994-11-25025 November 1994 Application for Amend to License DPR-16,consisting of TS Change Request 222,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20073F9341994-09-26026 September 1994 LAR 223 to License DPR-16,revising License Condition 2.C.(6) Re Long Range Planning Program ML20072L4701994-08-19019 August 1994 TS Change Request 220 to License DPR-16,updating & Clarifying SRs for Control Rod Exercising & Standby Liquid Control Pump Operability Testing to Be Consistent W/Generic Ltr 93-05 ML20070E3381994-07-0808 July 1994 Application for Amend to License DPR-16,revising TS to Provide Improved Protection to Safety Related Electrical Equipment from Loss of Capability in Event of Sustained Degraded Voltage Condition on Electrical Grid ML20078A7691994-06-24024 June 1994 TS Change Request 221 to License DPR-16,deleting TS 2.3.0 & Associated Bases,Reflecting Removal of Recirculation Flow Scram ML20069Q6751994-06-22022 June 1994 Application for Amend to License DPR-16,consisting of TS Change Request 217,rev 1,clarifying Requirements for Demonstrating Shutdown Margins ML20069M8031994-06-15015 June 1994 TS Change Request 216,revising Setpoints of TS 2.3.D, Reactor High Pressure,Relief Valve Initiation, by Increasing Setpoint Value by 15 Psig for Each Electromatic Relief Valve in ADS ML20070R5101994-05-12012 May 1994 TS Change Request 218 to License DPR-16,revising TS Sections 3.1 & 4.1 for Protective Instrumentation,Associated Bases & Tables to Increase Surveillance Test Intervals & Add Allowable out-of-svc Times ML20029E0431994-05-0606 May 1994 TS Change Request 217 to License DPR-16,clarifying Requirements for Demonstrating Shutdown Margin ML20065M9971994-04-19019 April 1994 TS Change Request 213 to License DPR-16,updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable During Pressure Testing 1999-07-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation ML20115G2011996-07-17017 July 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20113A8521996-06-19019 June 1996 Application for Amend to License DPR-16,Tech Spec Change Request Change Request 242,Rev 1 Re Implementation of 10CFR50,App J,Option B ML20111A3701996-05-0707 May 1996 TS Change Request 247 to License DPR-16,adopting Provisions of STS NUREG-1433,Rev 1,dtd 950407 Which Clarify SR Applicability & Allow Max Period of 24 H to Complete SR Upon Discovery That Surveillance Missed ML20107E7601996-04-15015 April 1996 Application for Amend to License DPR-16,revising Spec 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7621996-03-28028 March 1996 Application for Amend to License DPR-16,modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J5991996-03-25025 March 1996 Application for Amend to License DPR-16,deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J8981996-02-23023 February 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20100H9331996-02-22022 February 1996 Application for Amend to License DPR-16,deleting EDG Insp Requirement & Mod of Spec Re AOT ML20095C0921995-12-0505 December 1995 Application for Amend to License DPR-16,consisting of Change Request 231 Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20094D1341995-10-26026 October 1995 TS Change Request 229,modifying License Condition 2.C.(5) to Eliminate Process Associated W/Obtaining Separate NRC Approvals for Reviewing Insp Results & Obtaining Restart Authorization Prior to End of Each Refueling Outage ML20086A7051995-06-26026 June 1995 Application for Amend to License DPR-16.Amend Would Eliminate Requirement to Perform Reactor Shutdown & Drywell Solely for Purpose of Inspecting Snubbers in Svc for Only 12 Months ML20078M1381994-11-25025 November 1994 Application for Amend to License DPR-16,consisting of TS Change Request 222,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20073F9341994-09-26026 September 1994 LAR 223 to License DPR-16,revising License Condition 2.C.(6) Re Long Range Planning Program ML20072L4701994-08-19019 August 1994 TS Change Request 220 to License DPR-16,updating & Clarifying SRs for Control Rod Exercising & Standby Liquid Control Pump Operability Testing to Be Consistent W/Generic Ltr 93-05 ML20070E3381994-07-0808 July 1994 Application for Amend to License DPR-16,revising TS to Provide Improved Protection to Safety Related Electrical Equipment from Loss of Capability in Event of Sustained Degraded Voltage Condition on Electrical Grid ML20078A7691994-06-24024 June 1994 TS Change Request 221 to License DPR-16,deleting TS 2.3.0 & Associated Bases,Reflecting Removal of Recirculation Flow Scram ML20069Q6751994-06-22022 June 1994 Application for Amend to License DPR-16,consisting of TS Change Request 217,rev 1,clarifying Requirements for Demonstrating Shutdown Margins ML20069M8031994-06-15015 June 1994 TS Change Request 216,revising Setpoints of TS 2.3.D, Reactor High Pressure,Relief Valve Initiation, by Increasing Setpoint Value by 15 Psig for Each Electromatic Relief Valve in ADS ML20070R5101994-05-12012 May 1994 TS Change Request 218 to License DPR-16,revising TS Sections 3.1 & 4.1 for Protective Instrumentation,Associated Bases & Tables to Increase Surveillance Test Intervals & Add Allowable out-of-svc Times ML20029E0431994-05-0606 May 1994 TS Change Request 217 to License DPR-16,clarifying Requirements for Demonstrating Shutdown Margin ML20065M9971994-04-19019 April 1994 TS Change Request 213 to License DPR-16,updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable During Pressure Testing 1999-07-07
[Table view] |
Text
__
i s% ::,
GPU Nuclear. inc.
(. US Route #9 S99th F ed we NJ 731 0383 Tel 6C19714000 December 23, 1997 LU.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen,
Subject:
Oyster Creek Nuclear Generating Station, (OCNGS)
Docket No. 50-219 Technical Specification Change Request No. 253 (Revision 1)
Change in the Trade Name of the Owner and the Operator of OCNGS In accordance with 10 CFR 50 4(b)(1), enclosed is an Oyster Creek license amendment request and technical specification change request (TSCR) No. 253. The purpose of this license amendment and TSCR is to: 1) reflect the change the legal name of the' operator 4
of Oyster Creek from GPU Nuclear Corporation to GPU Nuclear, Inc. and,2) re 1ect in the Oyster Creek License and Technical Specifications the registered trade name of "GPU Energy" under which the owner of Oyster Creek now does business. This revised submittal supercedes the October 10,1997 submittal that was deterniined to contain numerous typographical errors. Please discard the proposed license and technical specification pages from the earlier submittal and insert the attached pages.
- Using the standards in 10 CFR 50.92, GPU Nuclear, Inc. has concluded that these proposed changes do not constitute a significant hazards consideration, as described in the enclosed analysis performed in accordance with 10 CFR 50.91(a)(1). Also er:losed
. is a Certiticate of Service for this request, certifying service to the chief executive; of the township and county in which the facilities are located, as well as the designated oflicial of the state of New Jersey, Bureau of Nuclear Engineering.
Sincerely, +
) h MichaelB Roche '
Vice President and Director Oyster Creek i
Lec: LRegion l' Administrator dg
. Oyster Creek Proj et Manager
~ Oyster Creek Senior Resident Inspector sk DOC D
E
~ f .;. ,
.=
GPU NUCLEAR. INC.
ANI!
JERSEY CENTRAL POWER & LIGHT COMPANY d/b/a GPU ENERGY DOCKET NO. 5Q-212 l . OYSTER CREEK NUCLEAR GENERATING STATION FACILITY OPERATING LICENSE License No. DPR-16 "1. The Nuclear Regulatory Commission (the Commission) has found that:
i I A. The application for a licene filed by Jersey Central Power E: Light Company
GPU Energy complies with the standards and requirements of the Atomic Energy-Act of 1954, as amended (the Act), and the Commission's rules and regulations set is forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made;
- B. - Construction of the Oyster Creek Nuclear Generating Station (the facility) has been completed in conformity with Provisional Construction Permit 'No. CPPR-15; the i
application, as amended; the provisions of the Act; and the rules and regulations of the Commission, and hm been operating under a provisional license since April 9,
'I969; C. The facility will operate in conformity with the application, as amended; the provisions of the Act; and the rules andregulations of the Conunission (except as
- i. exempted from compliance in Section 2.D. below);
h ,
D. There is reasonable assurance (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public and (ii) that such activities will be conducted in compliance with the Commission's rules and regulations set forth in 10 CFR Chapter 1 (except as exempted from compliance in Section 2.D. below); -
- Subsequent to the filing of this application, on December 29,1981 the NRC issued Amendment No. 59 to POL DPR-16 for this facility, pursuant to which GPU :
Nuclear, Inc. was added as a licensee, authorized to possess, use and operate the !
facility, and Jersey Central Power & Light company d/b/a/ GPU Energy remained as a licensee, authorized to posses the facility. All subsequent app!ications'for
- amendments to the license were filed jointly by the two licensees. l i
i
?
2 E. _ GPU Nuclear, Inc. is technically qualified to engage in the activities authorized by this license in accordance with the rules and regulations of the Commission; F. Jersey Central Power & Light Company d/b/a GPU Energy has satisfied the applicable l
provisions of 10 CFR Part 140, " Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G. The issuance of this license will not be inimical to the common defense and security or to l
the health and safety of the public; '
- 11. The receipt, possession and use of source, byproduct, and special nuclear materials as authorized oy this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70; and
's
- 1. The issuance of this license is in accordar.ce with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Provisional Operating License No. DPR-16, dated Ap.il 9,1959, as amended, is superseded in its entirety by Facility Operating License No. DPR-16, hereby issued to GPU Nuclear, Inc. and Jersey Central Power & Light Company d/b/a GPU Energy to read as follows: '
A. This license applies to the Oyster Creek Nuclear Generating Station, a ^ooiling-water reactor and associated equipment (the facility). The facility is located in Ocean Ce.mty, New Jersey, and is described in the licensee's Updated Final Safe. Analysis Report, as supplemented and amended, and in the licensee's Environmental Report, as supplemented and amended, s
B. Subject to the cor;ditions and requirements incorporated herein, the Commission hereby licenses GPU Nuclear,Inc.: ,
l (1) Pursuant to Section 104b of the Act and 10 CFR Part 50, to possess, use, and operate Oyster Creek Nuclear Generating Station, and Jersey Central Power & Light Company d/b/a GPU Energy to possess the Oyster Creek Nuclear Generating l
Station, at the designated location on the Oyster Creek site in Ocean County, New Jersey, in accordance with the procedures and limitations set forth in this license; (2) Pureuant to the Act and 10 CFR Part 70, to receive, possees, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the IJpdated Final Safety Analysis Report, as supplemented and amended; i
- _ - - _ _ _ _ -- l
(3) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess, and use at any time any byproduct, source, or special nuclear materials as sealed neutron scurces for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear .aterials without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to possess, but not separate such byproduct, source, or special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafler in effect and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level GPU Nuclear, Inc. is authorized to operate the facility at steady-state power levels not in excess of 1930 megawatts (thermal) (100 percent rated power) in accordance with the conditions specified herein.
(2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. , are hereby incorporated in the license. GPU Nuclear, Inc. l 3
shall operate the facility in accordance with the Tecimical Specifications.
(3) Fire Protection GPU Nuclear, Inc. shall irnplement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety l Analysis Report for the facility and as approved in the Safety Evaluation Report
. dated March 3,1978, and supplements thereto, subject to the following provision:
Docket No. 50-219 October 1,1986 APPENDIX A TO PROVISIONAL OPERATING LICENSE DPR-16' TECHNICAL SPECIFICATIONS AND BASES FOR OYSTER CREEK NUCLEAR POWER PLANT UNIT NO.1 OCEAN COUNTY, NEW JERSEY Jersey Central Power & Light Company d/b/a GPU Energy GPU Nuclear, Inc.
'Per Errata Sheet dated 4-6-69
_ _ _ _ _ _ _ _ - _ - _ _ . _ _ _ - - _ _ _ - -