ML20197B008

From kanterella
Jump to navigation Jump to search
Errata to Amend 194 to License DPR-16.Date of Issuance 980211 Was Inadvertently Omitted from Page 2 of Amend. License Amend Number 194 Was Inadvertently Omitted from Page 3 of Revised Operating License,In Paragraph 2.C.(2)
ML20197B008
Person / Time
Site: Oyster Creek
Issue date: 02/11/1998
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20197B014 List:
References
NUDOCS 9803100079
Download: ML20197B008 (2)


Text

__

e,

se 1

2-2.

Accordingly, the license is amended by changes to the Facility Operating License and Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2 C.(2) of Facility Operating License No. OPR 16 is hereby amended to read es follows:

(2)

Technical Snecifications The Technical Specifications contained in Appendices A and B, as revised throtgh Amendment No. 194, are hereby incorporated in the license, GPU Nuclear, Inc. shall operate the facility in accordance with the Technical Specifications, 3.

This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION pb R nald B. Eaton, Acting Director ProjectDirectorateI3 Division of Reactor Projects 1/II Office of Nuclear Reactor Regulation

Attachment:

1.

Pages 1 3 of License No. DPR 16*

2.

Changes to the Technical Specifications 3.

Appendix B Cover Page Date of Issuance: January 14, 1998

  • Pages 1-3 are attached, for convenience, for the composite license to reflect these changes.

Revised by NRC letter dated February 11, 1998 DOUIS"ooN*$o$ obi 9 P

PDR

3' (3) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, posses any time any byproduct, source, or spwial nuclear materials as sealed neutron sources for teactor startup, sealef sources for reactor instrumentation and radiatio monitoring equipment calibration, and as fission detectors in amounts as (4) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess amounts as required any byproduct, source, or special nuclear materials without restriction to chemical or physical form, for sample analysis or instrument ca or associated with radioactive apparatus or components; and

($) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to possess, but no such byproduct, source, or special nuclear materials as may be produced b operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specifie Commission's regulations set forth in 10 CFR Cha provisions of the Act and to the ndes, regulations, pter 1 and is subject to all applicable and orders of the Commission now or hersaAer in effect and is subject to the additional conditions specified or inc below:

(1) Marlmum Power Level GPU Nuclea:, Inc. is authorised to operate the facility at steady state not in excess of 1930 megawatts (thermal) (100 percent rated power) power lev with the conditions specified herein.

in accordance (2) Technical Snecification:

The Technical Specifications contained in Appendices A and B, as revis Amendment No.194, are hereby incorporated in the license. GPU Nuclear,1nc.

shall operate the facility in accordance with the Technical Specifications, l

(3) Fire Protection GPU Nuclear, Inc. shall implemer.t and maintain in efrect all provisions of the mpproved fire protection program as described in the Updated Final Safety l

Analysis Report for the facility and as approved in the Safety Evaluation Re dated March 3,1978, and supplements thereto, subject to the following prov Revised by NRC letter Amendment No. 194 dated February 11, 1998

'