ML20198P349

From kanterella
Jump to navigation Jump to search

Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan
ML20198P349
Person / Time
Site: Oyster Creek
Issue date: 10/30/1997
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML19063D139 List:
References
NUDOCS 9711070101
Download: ML20198P349 (2)


Text

,

4 Attachment 1 Revised License Page 4 Proposed Change to License Condition 2.C(4) 4 9711070101 971030 PDR ADOCK 05000219 P PDR

4

~

The Ikensec may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(4) The licensee shall fully implement and maintain in effxt all provisions of the Commission-approved physical secunty, guard training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority _of 10 CFR 50.90 and 10 CFR 50.34(p). The plans, which contain Screguards Information protected under 10 CFR 73.21, are entitled: " Oyster Creek Security Plan," with revisions submitted through July 16,1997; " Oyster Creek Security Training and Qualification Plan," with revisions submitted through September 13,1994; and " Oyster Creek Security Contingency Plan," with revisions submitted through May 11,1994. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therei1.

(5) Inspections liy a method acceptable to the NRC, of all accessible surfaces and welds of both coic spray spargers and repair assemblies at least once per 24 months, will be perfonned so that meaningful comparisons of any indications with previous inspections can be made. Results of the inspections, along with an evaluation of the safety significance of any new or progressing indications, will be provided to the Commission's staff for review. Authorization will be obtained from the Commission's staff before the plant is restarted from each refueling cutage. Should the staff determine that new cracks or further progression of existing cracks has occurred, resulting in unacceptable degradation of safety margins, the sparger will be replaced before restart.

(6) Lone Ranoe Plannine Pronram The evised " Plan for the leng-Range Planning Program for the Oyster Creek Nuclear Generating Stati on" (the Plan) submitted by GPUN letter C321-94-2140 dated September 26,1994, is approved,

a. The Plan shall be followed by the licensee from and after November 28,1994.

Amendment No.173,