EPID:L-2018-LLR-0032, Relief Requests Associated with the Fourth Inservice Inspection Interval (Approved, Closed) |
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-03-10010 March 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)2021-01-25025 January 2021 Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19155A0602019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19141A0202019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19136A3862019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds RS-19-015, Relief Request 14-RS-1 to Implement Code Case OMN-132019-01-31031 January 2019 Relief Request 14-RS-1 to Implement Code Case OMN-13 ML18347B4192019-01-17017 January 2019 Relief Request I4R-03, Relief from ASME Requirements for the Fourth 10-Year Inservice Inspection Interval Related to Degraded Canopy Seal Welds Associated with Control Rod Drive Mechanism ML18318A3342019-01-17017 January 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML18331A0372019-01-17017 January 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML18305A3602018-12-0606 December 2018 Relief from the Requirements of the American Society of Mechanical Engineers Code RS-18-125, Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1)2018-10-11011 October 2018 Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)2018-09-24024 September 2018 Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-17-168, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)2017-12-20020 December 2017 Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) RS-17-168, Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)2017-12-20020 December 2017 Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) ML17249A2982017-11-13013 November 2017 Relief from the Requirements of the ASME Code (CAC No. MF9597; EPID L-2017-LLR-0021) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17095A2682017-03-31031 March 2017 Submittal of Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces: Attachment 1, Relief Request ML17054C2552017-03-15015 March 2017 Request for Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16162A2112016-06-29029 June 2016 Request for Use of Alternative ML16109A3372016-04-27027 April 2016 Relief from the Requirements of the ASME Code (CAC Nos. MF6715, MF6716, MF6717, and MF6718) ML14303A5062014-12-10010 December 2014 Relief from the Requirements of the ASME Code to Extend the Reactor Vessel Inservice Inspection Interval ML13016A5152013-01-30030 January 2013 Relief from the Requirements of the ASME Code for the Third 10-Year Interval of Inservice Inspection ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML12108A1232012-04-19019 April 2012 Safety Evaluation in Support of the Third 10-Year Inservice Inspection Interval Request for Relief 13R-08 (Tac Nos. ME6024 and ME6025) ML1113306532011-06-0606 June 2011 Unacceptable with Opportunity to Supplement Alt. to ASME Code Requirements for Repair of Reactor Vessel Head Penetrations (TACs ME6071, ME6072, ME6073, and ME6074) ML1105909212011-03-0303 March 2011 Relief Request from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1011905272010-05-11011 May 2010 Relief Request 13R-06 for Detailed Visual Examination During Appendix J Pnuematic Leakage Testing ML1012301792010-05-10010 May 2010 Relief Request I3R-03 for Examination of Structural Weld Overlays ML1008504952010-03-26026 March 2010 Application Accepted - Braidwood & Byron Relief Request Re. ASME Code Case N-729-1 (TACs ME3510 - ME3513) RS-10-046, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds2010-03-12012 March 2010 Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1004806992010-03-0808 March 2010 Relief Request 12R-50 for Second 10-Year Inservice Inspection Interval ML0930702712009-11-0505 November 2009 Risk-Informed Relief Request 13R-01 for Certain Pressure Retaining Piping Welds ML0803701812008-04-14014 April 2008 Relief Request RV-1 for the Third Interval Inservice Testing Program 2022-09-20
[Table view] Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] Category:Safety Evaluation
MONTHYEARML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23241A9092023-09-19019 September 2023 Enclosure 2 - Non-Proprietary - Review of License Renewal Commitment Number 10 Safety Evaluation ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22173A1812022-08-11011 August 2022 Issuance of Amendment No. 229 to Remove License Condition ML22173A2142022-08-10010 August 2022 Issuance of Amendments Nos. 228 and 228 Revision of Technical Specifications for the Ultimate Heat Sink ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) ML21154A0462021-07-13013 July 2021 Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink ML21166A1682021-06-25025 June 2021 ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML21063A0162021-03-0808 March 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Alternative to 10 CFR 50.55a(z)(2) ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20245E4192020-09-24024 September 2020 Issuance of Amendments Nos. 218 and 218 Revision of Technical Specifications for the Ultimate Heat Sink ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20118C4292020-06-0909 June 2020 Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink ML20133K0932020-05-14014 May 2020 Relief from the Requirements of the ASME Code ML20111A0002020-05-0101 May 2020 Issuance of Amendment No. 209, Revision Technical Specification 5.5.9, Steam Generator (SG) Program, for One-Time Revision to Frequency of SG Tube Inspections (Exigent Circumstances) ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19240B1122019-09-0909 September 2019 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code ML19190A0812019-08-28028 August 2019 Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19136A3862019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code 2023-09-19
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 6, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 - RELIEF FROM THE REQUIREMENTS OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE (EPID L-2018-LLR-0032)
Dear Mr. Hanson:
By letter dated March 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18078A185), Exelon Generation Company, LLC (Exelon, the licensee), submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of an alternative to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, requirements at Braidwood Station (Braidwood), Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(z)(2), the licensee requested to use the proposed alternative to the pressure testing requirements of the post-accident hydrogen monitoring system piping on the basis that compliance with the specified ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that Exelon has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2}. Therefore, the NRC staff authorizes the use of relief request 14R-02 for the fourth inservice inspection intervals at Braidwood, Units 1 and 2, currently scheduled to start on August 29, 2018, and end on August 29, 2028 (Unit 1) and start on October 17, 2018, and end on October 17, 2028 (Unit 2).
All other requirements of ASME Code,Section XI, for which relief was not specifically requested and authorized by the NRC staff remain applicable, including the third-party review by the Authorized Nuclear lnservice Inspector.
B. Hanson If you have any questions, please contact the Project Manager, Joel Wiebe at 301-415-6606 or via e-mail at Joel.Wiebe@nrc.gov.
Sincerely, Oc-i 0I cV~
David J. Wrona, Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST 14R-02 REGARDING PRESSURE TESTING REQUIREMENTS OF THE POST ACCIDENT HYDROGEN MONITORING SYSTEM PIPING EXELON GENERATION COMPANY, LLC BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. 50-456 AND 50-457
1.0 INTRODUCTION
By letter dated March 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18078A185), Exelon Generation Company, LLC (Exelon or the licensee) requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI. The licensee's proposed alternative 14R-02, addresses pressure testing requirements of the post-accident hydrogen monitoring system piping at Braidwood Station (Braidwood), Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations ( 10 CFR), 50.55a(z)(2), the licensee requested to use the proposed alternative on the basis that compliance with the specified ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY EVALUATION
The regulations in 10 CFR 50.55a(g)(4) state, in part, that ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in Section XI of the ASME Code to the extent practical within the limitations of design, geometry, and material of construction of the components.
Paragraph 10 CFR 50.55a(z) states that alternatives to the requirements of paragraphs (b) through (h) of 10 CFR 50.55a or portions thereof may be used when authorized by the Director, Office of Nuclear Reactor Regulation. A proposed alternative must be submitted and authorized prior to implementation. The licensee must demonstrate that: (1) the proposed alternatives provide an acceptable level of quality and safety, or (2) compliance. with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request the use of an alternative and the NRC to authorize the alternative proposed by the licensee.
3.0 TECHNICAL EVALUATION
3.1 The Licensee's Request for Alternative 3.1.1 Components Affected ASME Code Class 2, Examination Category C-H, Item No. C?.10 piping outside of containment, between valves 1(2)PS228A to 1(2)PS230A, and 1(2)PS228B to 1(2)PS230B, of the post-accident hydrogen monitoring system and process sampling system piping.
3.1.2 Code Requirements The code of record (COR) at Braidwood during the fourth 10-year inservice inspection (ISi) interval is the 2013 Edition of ASME Code,Section XI. Examinations according to ASME Code,Section XI, Table IWC-2500-1, Examination Category C-H, Item No. C?.10, require a system leakage test in accordance with the requirements of IWC-5220, and VT-2 visual examinations in accordance with the requirements of IWA-5240, at a frequency of each inspection period.
Additionally, IWC-5210(b)(1) states, in part, that the contained fluid in the system shall serve as the pressurizing medium, and IWC-5210(b)(2) states, in part, that when gas is the pressurizing medium, the test procedure shall include methods for detection and location of through-wall leakage from components of the system tested.
3.1.3 Licensee's Basis for Relief In its letter dated March 19, 2018, the licensee stated that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety, and requested relief in accordance with 10 CFR 50.55a(z)(2).
In its letter dated March 19, 2018, the licensee stated that the system medium is air and consists of two separate trains for each of the Braidwood units. The piping is ~ inch stainless steel (SS) nominal pipe size and/or% inch SS tubing (SA-312, Type 304 SS piping and SA-213, Type 304 or Type 316 SS tubing). The licensee also stated that the nominal system operating pressure ranges across the system from vacuum on the suction side to a maximum of 10 pounds per square inch gauge (psig) at the pump discharge side. The licensee further stated that in the past it performed the test by pressurizing the volume and performing a soap bubble or "snoop" test on all the welds and piping. The licensee stated that review of surveillance results in 2005 revealed that a portion of the supply and return piping on the 1A train is located in a pipe tunnel and is inaccessible for VT-2 visual examination.
The licensee further stated that there are additional portions of piping for both trains A and B which are located at high elevation where the performance of the VT-2 visual examinations using a bubble test presents a potential safety hazard for personnel performing the test.
Additionally, the licensee stated that it considered using an ultrasonic gun for leakage testing the inaccessible piping; however, the existing obstructions significantly reduced the ability of an ultrasonic system to detect and locate a leak.
3.1.4 Licensee's Proposed Alternative In its letter dated March 19, 2018, the licensee proposes to apply an alternate examination to the ASME Code required examinations for the system piping between valves 1(2)PS228A to 1(2)PS230A, and 1(2)PS228B to 1(2)PS230B. Specifically, the licensee proposes to apply the testing requirements of 10 CFR Part 50, Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors," to the system piping between valves 1(2)PS228A to 1(2)PS230A, and 1(2)PS228B to 1(2)PS230B, as an alternate to the ASME Code-required testing for the applicable piping. The licensee stated that the safety-related ASME Code, Class 2, sections of piping and valves associated with process sampling system at other containment penetrations in the system are tested in accordance with requirements of 10 CFR, Part 50, Appendix J.
The licensee's proposed alternative to the required ASME Code system pressure test essentially extends the test boundary of the leak-rate test of Appendix J to cover the remainder of the system outside the containment, in lieu of performing the ASME Code required leakage test. In its letter dated March 19, 2018, the licensee stated that the current acceptance criteria for the leak-rate test per Appendix J will be less than or equal to 10 standard cubic feet per hour, and would be applied independently to the supply and return piping for each hydrogen monitor train. The licensee stated that if the test results indicate leakage that exceeds the acceptance criteria, the licensee will generate an Issue Report in accordance with the Exelon corrective action program, investigate the source of leakage, and the appropriate corrective actions would be employed to identify and correct the source of leakage. The licensee further stated that any leakage would most likely be from valve packing or threaded connections, as it is not aware of any degradation mechanisms or previous failures for this system.
In its letter dated March 19, 2018, the licensee stated that a similar request was previously authorized for use at Braidwood, Units 1 and 2, during the third 10-year ISi interval, by NRC letter dated July 20, 2010 (ADAMS Accession No. ML101970288).
3.1.5 Licensee's Duration of Relief Request The proposed alternative will be used during the fourth 10-year ISi interval for Braidwood, Units 1 and 2, which will start on August 29, 2018, and end on August 29, 2028 (Unit 1) and start on October 17, 2018, and end on October 17, 2028 (Unit 2).
3.2 NRC Staff Evaluation The COR during the fourth 10-year ISi interval at Braidwood, Units 1 and 2, is the ASME Code,Section XI, 2013 Edition. ASME Code,Section XI, IWA-5240 requires a VT-2 visual examination for evidence of leakage by examining accessible external exposed surfaces of pressure retaining components for evidence of leakage during every inspection period. The NRC staff notes that portions of the specified piping are either inaccessible or would present a safety hazard for personnel performing the required examinations. Therefore, the NRC staff finds that the required ASME Code examinations for the noted piping in the licensee's request 14R-02, cannot be performed without hardship or unusual difficulty.
As stated above, the subject system is fabricated from stainless steel piping 1/4 inch and 1/2 inch diameter with socket weld joints. The highest system operational pressure in the piping is approximately 1O psig on the discharge side of the pump. The NRC staff notes that during operation the system is normally subjected to low stresses. Additionally, for the materials of fabrication (i.e., austenitic stainless steel) and the operating environment (i.e., air), there are no
known degradation mechanisms for the subject piping. The NRC staff also notes that the licensee's proposed alternative testing, by extending the test boundary of the leak-rate test of Appendix J to cover the remainder of the system outside the containment will expose the subject system piping to the Appendix J test pressure, which is much greater than the normal system operating pressure inside the subject piping.
The NRC staff finds that the periodic leak-rate testing of Appendix J, conducted at the Appendix J test pressure, will provide a leak detection method similar to the ASME Code,Section XI, required soap bubble solution pressure test at 10 psig along with the VT-2 visual examination.
The NRC staff notes that the Appendix J test pressure used for the requested alternate testing will be significantly higher than the 10 psig operating pressure and, therefore, is acceptable for the testing of structural integrity and leak tightness of the subject piping. The NRC staff further notes that currently there are no known degradation mechanisms for the subject piping, or history of failures. Therefore, the NRC staff finds the proposed alternative testing provides reasonable assurance of structural integrity and leak tightness. Additionally, as stated earlier, the NRC staff finds that the ASME Code-required system pressure test would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
4.0 CONCLUSION
As set forth above, the NRC staff determines that the licensee has demonstrated that the proposed alternative provides reasonable assurance of structural integrity and leak tightness of the subject components, and that complying with the specified ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, NRC staff authorizes the use of the proposed alternative 14R-02, for the fourth 10-Year inservice inspection interval at Braidwood, Units 1 and 2.
All other ASME Code,Section XI, requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: R. Kalikian Date of issuance: December 6, 201 8
ML18305A360 *via email OFFICE NRR/DORULPL3-2/PM NRR/DORULSPB/LA NRR/DMLR/MPHB/BC NAME JWiebe SRohrer SRuffin*
DATE 11/8/18 11/5/18 10/31/18 OFFICE NRR/DORULPL3/BC NAME DWrona DATE 12/6/18